Edge-Core XGS-PON vOLT User manual

– 1 –
Quick Start Guide
Attach the Brackets
1. Attach each of the front- and rear-post brackets to the vOLT
using four of the included bracket screws.
2. Use an additional two screws to secure each of the rear-post
brackets at the mid-point on the sides of the vOLT.
3. Use the screws and cage nuts supplied with the rack to secure
the vOLT in the rack. (You can adjust the rear-post bracket ears
to fit different rack depths from 56 cm to 75 cm.)
Lock the Rear-Post Bracket Ears
1. Lock the position of the rear-post bracket ears using the included
position-locking screws.
Ground the vOLT
1. Ensure the rack is properly grounded and in compliance with
ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or
isolating surface treatment).
2. Attach the grounding wire (#14 AWG) to the grounding point
on the vOLT rear panel. Then connect the other end of the wire
to rack ground.
Caution:
The vOLT includes plug-in power supply (PSU)
and fan tray modules that are installed into its chassis. All
installed modules must have a matching airflow direction.
That is, if the installed power modules have a front-to-back
(F2B) airflow direction, all the installed fan tray modules
must also have a F2B airflow direction.
Note:
The vOLT has the Open Network Install Environment
(ONIE) software installer pre-loaded on the unit, but no
vOLT software image. Information about compatible
software can be found at www.edge-core.com.
Note:
The drawings in this document are for illustration
only and may not match your particular model.
1
1
1
2
3
3
Caution:
Installing the vOLT in a rack requires two people.
One person should position the vOLT in the rack, while the
other person secures it using the rack screws.
装置の吸排気に必要な領域をマニ ュ アル上に規定 し て
いる。
Caution:
The earth connection must not be removed unless
all supply connections have been disconnected.
2
1
3
1
2
E092017-CS-R01
15020000xxxxA
www.edge-core.com
16-Port XGS-PON vOLT
ASXvOLT16
1.
16-port XGS-PON vOLT,
ASXvOLT16
2. Rack Mounting Kit—2 front-post brackets, 2 rear-post
brackets, 20 screws, and 2 ear-locking screws
3. Power Cord (included with AC PSUs only)
4. Ground Wire (included with DC PSUs only)
5. Console Cable—RJ-45 to DB-9
6. DC Power Cable (included with 48 VDC PSU only)
7. Documentation—Quick Start Guide (this document) and
Safety and Regulatory Information
1
Package Contents
23457
6

Quick Start Guide
– 2 –
Connect Power
1. Install one or two AC or DC PSUs in the vOLT.
The vOLT supports up to two PSUs that must have the same
matching airflow direction as the installed fan tray.
2. Connect an external AC or DC power source to the PSUs.
1. Positronic PLA03F7000/AA connector
2. DC Return (red wire)
3. -36 – -72 VDC (black wire)
4. Ground (yellow-green wire)
Verify Device Operation
1. Verify basic vOLT operation by checking the system LEDs.
When operating normally, the PSU1/PSU2, Diag, and Fan LEDs
should all be on green.
Perform Initial System Boot
1. If the network operating system (NOS) installer is located on a
network server, first connect the RJ-45 Management (Mgmt) port
to the network using 100-ohm Category 5, 5e or better twisted-
pair cable. (Not required if the NOS installer is located on
attached storage.)
2. Boot the vOLT. Wait for the ONIE software to locate and execute
the NOS installer, and then wait for the installer to load the NOS
software image.
Subsequent switch boots will bypass ONIE and directly run the
NOS software.
Connect Network Cables
1. For the RJ-45 Management port, connect 100-ohm Category 5,
5e or better twisted-pair cable.
2. Install XGS-PON transceivers in the PON XFP slots and then
connect fiber optic cabling to the transceiver ports.
3. Install QSFP28 transceivers in the QSFP28 slots and then
connect fiber optic cabling to the transceiver ports.
The following transceivers are supported:
■100GBASE-CR4, AOC, SR4, LR4, and PSM4
■40GBASE-CR4, SR4, and LR4
4. As connections are made, check the port status LEDs to be sure
the links are valid.
For the PON ports:
■Green — Port has a link with active ONTs. Flashing
indicates activity.
■Amber — Port is enabled with no active ONTs.
Each QSFP28 port has four LEDs that indicate valid links in the
following modes:
■1 LED Green — 100 Gbps mode
■1 LED Blue — 40 Gbps mode
■1-4 LEDs Green — 25 Gbps breakout mode (four lanes)
■1-4 LEDs Blue — 10 Gbps breakout mode (four lanes)
Caution:
Use a UL/IEC/EN 60950-1 certified power
supply to connect to a DC converter, and a #14 AWG (for
36–75 VDC PSU) wire to connect to a DC PSU.
4
2
1
1
3
4
2
5
1
Note:
Refer to the network operating system (NOS) installer
and NOS documentation for details on software options
and set up for ONIE.
6
7
3
2
1

Quick Start Guide
– 3 –
Switch Chassis
Size (WxDxH) 433.8 x 609 x 44 mm (17.08 x 20.47 x 1.73 in.)
Weight 13.44 kg (29.63 lb)
Temperature Operating: 5° C to 40° C (41° F to 104° F)
Storage: -40° C to 40° C (-40° F to 104° F)
Humidity Operating: 5% to 85% (non-condensing)
Power
Consumption
574 Watts maximum
650W AC PSU
Power Rating 100–240 VAC, 50/60 Hz, 650 Watts
AC Input 100–240 VAC, 50/60 Hz, 6–3 A
650W 48 VDC PSU
Power Rating 48 VDC, 650 Watts
DC Input -36 V – -75 V, 14–7 A
Regulatory Compliances
Emissions EN 55022, Class A
EN 61000-3-2:2014, Class A
EN 61000-3-3:2013, Class A
47 CFR FCC Part 15:2015, Subpart B, Class A
CCC GB 9254-2008, Class A
CE Mark
Immunity EN 55024:2010+A1:2015
IEC 61000-4-2/3/4/5/6/8/11
Safety UL (CSA 22.2 No 60950-1 & UL60950-1)
CB (IEC/EN60950-1)
CCC GB4943.1-2011
Hardware Specifications
This manual suits for next models
1
Popular Touch Terminal manuals by other brands

Nokia
Nokia 30 GSM user guide

Network Computing Devices
Network Computing Devices ThinSTAR 300 user guide

Alcatel
Alcatel omnipcx enterprise Advanced REFLEXES user guide

Intermec
Intermec Trakker Antares 2460 supplementary guide

mitrefinch
mitrefinch T2 user guide

Westpac
Westpac EFTPOS Now Quick reference guide