Studio 300 Assembly
ED7xx Busboard Installation
We would now recommend installing your power distribution while you still have
unhindered access to the inside of the case.
Fit 8x M3x12mm SEM bolts to the Busboard Carrier Plate and
secure using M3 x 5mm nylon spacers as shown at left.
Install the M4 cup washers on to the
appropriate busboard mounting
locations as show at left. The
washers are cupped on one side
and this side should be placed face-
down over the bolt first so that the
larger flat surface remains exposed.
Mount the Busboard Carrier Assembly in to the skins and secure using the M4 Nut-
Washers
Install busboards and secure using 8x M3 nuts.
Install Busboard Power Sets and Busboard Cable Sets as required for your selection of
busboards and the DC Power Cable if using the rear access hole for power entry. Refer to
DC_DISTRIBUTION_SYSTEMS for guidance on this.
Continue with the Enclosure assembly ………………
(for clarity the following diagrams do not include the distribution system)
ELBY Designs - Laurie Biddulph
3 Therese Street Bripdort TAS 7262 Australia
elby - designs@ bigpond.com http://www.elby-designs.com
2 of 5