enphase IQ Battery 5P User manual

IQ Battery 5P Quick Install Guide 1
IQBattery5P
Quick Install Guide
MODEL
IQBATTERY-5P-1P-NA
VERSION 3.0
JUNE 2023
PRELIMINARY

2 IQ Battery 5P Quick Install Guide
To install the Enphase IQBattery5P and the wall-mount bracket, read
and follow all warnings and instructions in this guide. Safety warnings
are listed at the end of this guide. These instructions are not meant
to be a complete explanation of how to design and install an energy
storage system. All installations must comply with national and local
codes and standards. Only Enphase certied installers shall install,
troubleshoot, or replace IQBattery5P.
The IQBattery5P system includes the battery cellpack
with integrated IQMicroinverters and battery management
system (BMS). The system requires IQCombiner 5/5C and
IQSystemController3/3G for backup operation. The IQGateway
measures PV production, IQBattery5P charge/discharge power,
and home energy consumption, and it senses when it is optimal to
charge or discharge the battery so that energy is stored when it
is abundant and used when it is scarce. The IQBattery5P system
provides backup power with EnphaseIQSystemController3/3G.

Table of contents
What’s in the box
Tools/additional items required
Unboxing IQBattery5P
Section A
Mounting the product
Plan a location for the IQ Batteries
Step 1: Minimum clearance
Step 2: Mounting surface
Step 3: Install the wall-mount bracket
Section B
Installing IQBattery5P
Step 1: Prepare to install IQBattery5P on mounting
bracket
Step 2: Prepare for eld wiring
Section C
Wiring
Install conduit/raceway adapter and eld wiring
Section D
Close and energize the system
Disassembly of IQBattery5P cover
Congure and activate
Operation
LED overview
Operating mode and set points LED overview
Troubleshooting
Safety
Revision history
Control (CTRL) Wiring between system components
IQ Battery 5P Quick Install Guide 3

What’s in the box
IDcover IQBattery5P
Top shield
Conduit cover
Conduit cover
Bottom mounting
bracket
(to be installed
rst on wall)
DESCRIPTION MODEL NUMBER QUANTITY
IQBattery5P B05-T02-US00-1-3 1
ID cover, two conduit covers B05-CX-0550-O 1
Bottom mounting bracket & top shield B05-WB-0543-O 1
M5 Seismic screw 2
M4 Grounding screw 2
M5 ID Cover Grounding screw 2
Quick Install Guide 1
M5 Seismic screw M4 Grounding screw M5 ID Cover
Grounding screw
Quick Install Guide
4 IQ Battery 5P Quick Install Guide

Tools/additional
items required
S. NO ITEM NAME QUANTITY SOURCE
1 Conduit up to 32 mm (1-1/4 in) for side entry and up to 19 mm (3/4 in) for rear entry As required Provided by Installer
2Conduit ttings and tools, UL rated hubs are required for all installations
and must be NEMA Type 3R certied when installing outdoors As required Provided by Installer
3Raceway adapter – should be UL rated and must be NEMA
type 3R certied when installing outdoors As required Enphase store/
provided by Installer
4 Drill 1 Provided by Installer
5 5/32" pilot bit (or metric equivalent) 1 Provided by Installer
6 Screwdriver 1 Provided by Installer
7 Wrench 1 Provided by Installer
8 Socket wrench 1 Provided by Installer
9 Torque wrench 1 Provided by Installer
10 Level 1 Provided by Installer
11 Conductor stripper 1 Provided by Installer
12 Stud nder (if required) 1 Provided by Installer
13 Copper conductors - No. 10 - 3 AWG (11 mm or 7/16 in
strip length) (rated at 90°C) for terminals As required Provided by Installer
14 Control cable (CTRL-SC3-NA-01) As required Enphase store
15 Personal protective equipment for handling lithium batteries
as required by local safety standards As required Provided by Installer
16 Protective gloves for protection against sharp edges As required Provided by Installer
17
#20 (5/16 in) lag bolts or screws to install the bottom mounting bracket. Slots
are 9.2 mm (0.36 in) for wall mount and 11.2 mm (inclined slots) for pedestal.
Check with a structural engineer and local standards for requirements
Single stud
mounting
(Min. 3)
Dual stud
mounting
(Min. 4)
Provided by Installer
18 1/4" screws to fasten top shield on wall
Single stud
mounting
(Min. 6)
Dual stud
mounting
(Min. 6)
Provided by Installer
19 Washers As required Provided by Installer
20 IQBattery5P lifting handles. Includes one left side and one
right side lifting handle (IQBATTERY-HNDL-5) 1Enphase store/
provided by Installer
IQ Battery 5P Quick Install Guide 5

NOTE: The Enphase IQBattery5P system requires an internet
connection through the IQGateway in the IQCombiner. Failure
to maintain an internet connection may have an impact on the
warranty. See enphase.com/warranty for full terms.
The IQBattery5P and IQSystemController are both connected to
the IQGateway and communicate using communication control
cables. The Enphase PV system communicates to the IQGateway
using power-line communication.
Verify that main service is 120/240 VAC, and not 208/120 VAC.
IQBatteries cannot be installed where L1 to L2 measures 208 VAC.
NOTE: The rated energy capacity of the battery is 5.0 kWh.
Install the PV system and the IQCombiner as directed by the
Enphase installation manuals.
Tools/additional
items required
6 IQ Battery 5P Quick Install Guide

Unboxing
IQBattery5P
Before you unbox IQBattery5P, check the “Energize By” label on
the shipping box to verify that the IQBattery(ies) will be installed by
the date shown. If the date has passed, contact your distributor for
next steps.
Remove the upper packaging cover and follow the steps as shown in
the following image:
Risk of injury. Take care when lifting. The IQBattery5P unit is
heavy (66.25 kg/146.05 lbs) and requires two people to lift it.
Inspect the packaging and the IQBattery(ies) for any signs of
damage, such as cracks, dents, or electrolyte leaks. Do not install
or use the IQBattery(ies) if it has been dropped or damaged in any
way. If it’s damaged, contact your distributor for replacement.
Remove the six
plastic strips
Remove the exterior
cardboard box lid
Remove the four corner
guards
Remove the bottom
mounting bracket
Remove the other paper tray
to reveal the battery cover
Remove the
IQBattery5P cover
Remove the two paper
trays
Remove the IQBattery5P
using lifting handles
Recycle packaging according
to local guidelines
Remove the top
shield
Remove the
paper tray
1234
5678
910 11
1234
5678
10
911
Do not lift the IQ Battery 5P using microinverters or the
plastic behind the microinverters. This may damage the unit
permanently.
Always use handles to lift the IQ Battery 5P.
IQ Battery 5P Quick Install Guide 7

Plan a location for the
IQBatteries
Mounting the product
Section A
• The IQBattery5P housing is NEMA type 3R and can be installed indoors or outdoors.
L1 /L2 terminal blocks accept copper conductors of No. 10 - 3 AWG. Field Ground terminal blocks
accept copper conductors of No. 22 - 8 AWG.
• Enphase IQBatteries
have been evaluated by
UL solutions to UL9540A
standard
for outdoor and non-
habitable indoor residential installations. Installations in nished, non-habitable indoor spaces (such
as detached and attached garages,
utility closets, basements, and storage or utility spaces) shall be
permitted.
• Make sure the installed location can sustain the total weight of the IQBatteries and mounting bracket.
Total weight for IQBattery5P, including the IQBattery5P unit, cover, and wall-mount bracket, is 78.9 kg
(174 lbs). The wall must contain blocked studs that can bear the battery weight or can be of masonry or
other suitable structure.
• Make sure there are no pipes or electrical wires where you plan to drill.
• Follow local standards: Choose a well-ventilated location where the ambient temperature and humidity
are within −20°C to 55°C (−4°F to 131°F) and 5% to 95% relative humidity, non-condensing, out of direct
the location.
• Select a location where you can interconnect IQBattery5P to the IQSystemController.
• This product must not be installed at altitudes above 8,200 ft (2,500 m).
• Follow all local standards and regulations set forth by the Authority Having Jurisdiction (AHJ).
• Up to four IQBattery5P units can be daisy chained on a single branch circuit.
IQSystemController
3/3G supports
up to a maximum of 80 A breaker for IQBattery5P connection
circuit.
• The maximum conductor size for IQBattery5P is 3 AWG, and the maximum breaker rating with this
conductor size is 80 A.
Max 4
8,200ft
174 lbs
sunlight. The optimum ambient temperature range for installation location is 0ºC to 30ºC (32ºF to
86ºF). Provide smoke alarms in the residence in accordance with building, re, and installation codes.
• Consider the dimensions of the IQBatteries, easy access, height, and length of cable when selecting
8 IQ Battery 5P Quick Install Guide

If mounted in the path of a motor vehicle, Enphase
recommends a minimum mounting height of 91 cm (36 in)
above the oor.
For IQBatteries mounted at the same level, the minimum distance
between covers of two units shall be ≥ 3in. Use the raceway adapter
(Enphase Accessory) between units only if the distance between
units is ≤ 165 mm (6.5 in).
Section A - Mounting the product
Step 1:
Minimum clearance
22 in
39 in
7.5 in
The mounting instructions that follow are for the included wall-mount
bracket only. If you wish to install IQBattery5P in a oor-mount
conguration, order the pedestal accessory
(B05-PI-0550-O)
and
refer to the oor-mount instructions that come with that product.
This product must be installed with clearance at the left, right, top,
bottom, and front of the product as shown in the gure.
Keep IQBattery5P away from falling or moving objects,
including motor vehicles.
36 in
6 in
6 in
6 in 6 in
3 in
NOTE: These are minimum manufacturer’s clearances.
Make sure to comply with all local compliance and regulation
standards.
IQ Battery 5P Quick Install Guide 9

Section A - Mounting the product
Step 2:
Mounting surface
max. -5°
max. +5°
≤ 2 mm
1
2
Select a location where the tilt
from vertical is less than 5°.
Make sure the mounting surface
atness is within 2 mm between
boundary lines.
NOTE: If the variation of the atness is more than 2 mm, the battery
might not properly sit on the bottom mounting bracket
through
keyholes. Use spacers if the variation is more than 2 mm.
10 IQ Battery 5P Quick Install Guide

Step 3:
Install the bottom mounting bracket and the top shield
Section A - Mounting the product
522 mm (20.5 in)
461 mm (18 in)
Two embosses with indentation
marks to provide exibility to
installers to x the top shield
10 wall-mounting
holes, marked “F”
F1 F2
F7 F8F5 F6
F3 F4
F9
F10
These two anges connect the
top shield to the bottom mounting
bracket
Top shield
Bottom mounting bracket
L1 L4L2 L3
Inclined slots for
pedestal assembly
Mounting slots
Locating features for
pedestal leg marked “L”
534 mm (21 in)
513 mm (20 in)
The bottom mounting bracket carries the weight of IQ Battery 5P
and the Top shield covers the back of the IQ Battery 5P.
Risk of injury and equipment damage. Do not mount an
IQBattery5P on a bracket that is not properly mounted.
• Use 1/4 in screws
to fasten the top shield to the wall.
• Use #20 (5/16 in) screws/lag bolts (or masonry attachments
for masonry wall) to attach the bottom mounting bracket using
one screw/lag bolt and washer for each slot (9.2 mm/0.36 in).
The keyholes are to mount the base
unit of IQBattery5P to the
bottom
mounting bracket
and should not be
used to mount
the
bottom mounting
bracket
IQ Battery 5P Quick Install Guide 11

Section A - Mounting the product
32
4a
4b
Starting at the installation position closest to the power source,
mark a level line on the wall as a guide.
Position the bottom mounting bracket on the wall and fasten
it using the mounting slots.
Use minimum of four screws/lag bolts for dual stud mounting.
Tighten all screws to manufacturer’s specied torque values.
Position the bottom mounting bracket on the wall and fasten it using
the mounting slots.
Use minimum of three screws/lag bolts for single stud mounting.
Tighten all screws to manufacturer’s specied torque values.
Install the bottom mounting bracket as per the following instructions.
Make sure
the bottom mounting bracket
is solidly attached to the wall.
Multiple risks. Make sure not to drill into or attach to electric
wiring or pipes in the wall.
Mounting on multiple vertical studs Mounting on single vertical stud
1
450 mm
450 mm
The bottom mounting bracket can accommodate a slight
oset in stud positioning with respect to the battery unit
with pre-drilled holes/slots as shown in the image.
12 IQ Battery 5P Quick Install Guide

5
76
8a
8b
Two M4 grounding screws
torque to 1.5 N m
Section A - Mounting the product
Position the ground contact ange of the top shield on that of
the bottom mounting bracket and align the screw slot/hole.
Fasten the top shield to the bottom mounting bracket at the ground
contact ange.
Multiple risks. Make sure not to drill into or attach to electric
wiring or pipes in the wall.
NOTE: The top shield is not a structural part and need not
be always mounted to the studs. It can be fastened to the
supporting wall with the pre-drilled holes if studs are not
aligned.
8a
8b
IQ Battery 5P Quick Install Guide 13

Section A - Mounting the product
9a 9b
NOTE: Ensure to always
fasten this screw.
NOTE: Ensure to always
fasten this screw.
Mounting on multiple vertical studs Mounting on single vertical stud
Fasten the top shield using the mounting holes. Use minimum
sixscrews for dual stud mounting to fasten the top shield
to the wall.
Fasten the top shield using the mounting holes. Use minimum
six screws for single stud mounting to fasten the top shield
to the wall.
14 IQ Battery 5P Quick Install Guide

Step 1:
Prepare to install IQBattery5P
on bottom mounting bracket
Section B
Installing IQBattery5P
NOTE: Make sure to complete all steps before installing
IQBattery5P on the wall.
Remove the ID cover from the packaging and keep it aside. Use
the reusable lifting handles (sold separately) and check that the
plungers are extended and ready to engage into the IQBattery5P
slots.
Align the left handle on the left side of IQBattery5P and insert it
into the slots and slide toward the top of IQBattery5P enclosure
until it locks into place. Check that the handle is secure.
Repeat on the other side with the right handle.
Risk of injury and equipment damage. Two people are required
to lift IQBattery5P.
Two people together must lift the IQBattery5P unit from
the packaging using the handles and place it in an upright
position on a at surface.
Lift IQBattery5P from the packaging using the handles and
make sure the battery’s front side is facing toward
you.
Do not lift the IQ Battery 5P using microinverters or the
plastic behind the microinverters. This may damage the
unit permanently.
1 2 3
4
IQ Battery 5P Quick Install Guide 15

Section B - Installing IQBattery5P
IQBattery5P can have the eld cable entry from the back, left,
or right side. Finalize the side from where the eld cable enters
and leaves IQBattery5P. Use the following table to decide the
cutout for all the units.
NAME BACK VIEW LEFT BACK
CONDUIT
RIGHT BACK
CONDUIT
LEFT SIDE
CONDUIT
RIGHT SIDE
CONDUIT
Both side conduit
Only left side conduit*
Only right side conduit*
Left side conduit & Right back conduit
Left back conduit & Right side conduit
Both back conduit
Only left back conduit*
Only right back conduit*
Both Side Conduit
Only Left Side Conduit
Only Right Side Conduit
Left Side Conduit - Right Back Conduit
Left Back Conduit - Right Side Conduit
Both Back Conduit
Only Left Back Conduit
Only Right Back Conduit
Risk of electric shock. The DC control switch must be in the OFF position before performing this step.
* One-side conduit conguration is supported only if system has one IQBattery5P or for the unit last in the daisy
chain farthest from the IQSystemController.
NOTE: The rear entry can support the conduit with diameter of
1/2 in (13 mm) to 3/4 in (19 mm) while side entry can support the
conduit with diameter of 1/2 in (13 mm) to 1-1/4 in (32 mm). Follow
manufacturer recommended instructions for conduit installation.
5
16 IQ Battery 5P Quick Install Guide

6
Section B - Installing IQBattery5P
6
Open the front wiring cover by unfastening the 11 captive screws from the wiring
cover. Use an electric drive; do not use impact drives/impact drills.
Drill the appropriate cutout on either the back or side of the unit or
on both based on congurations. The rear entry can support the
conduit with diameter of 1/2 in (13 mm) to 3/4 in
(19 mm) while side entry can support the conduit with diameter of
1/2 in (13 mm) to 1-1/4 in (32 mm). Decide the required conductor
size for L1, L2, GND and cutout diameter based on the conduit
selected.
NOTE:
Drill the appropriate cutout before mounting the unit on the
wall.
Ensure that the drilling machine does not touch any internal
components or wall.
Clean the debris from inside the battery unit after drilling.
11x
7
Drill to appropriate cutout
Captive screws
torque to 1.5 N m
6
Not doing so will void the warranty.
IQ Battery 5P Quick Install Guide 17

Section B - Installing IQBattery5P
8
Bring the IQBattery5P unit to the already mounted
bottom mounting bracket.
To remove the installation handles, pull the plunger outward to
unlock them. Then, slide the handle down and pull it away from the
unit to remove it.
Hold IQBattery5P straight, align, and insert four mount bolts on the
battery unit into the bottom mounting bracket keyholes and slide it
down.
NOTE: Use lift assist to avoid any mishap during lifting.
9
10 11 12
18 IQ Battery 5P Quick Install Guide

Section B - Installing IQBattery5P
The vent or drain holes provided at the back of the unit serve
the dual purpose of natural ventilation and condensation
drainage. Blocking these holes can aect the functionality
of the product.
Secure the battery unit on the bottom mounting
bracket using two M5 Seismic screws.
This is required to comply with seismic requirements.
Vents or drain holes
13
13
2x
Two M5 Seismic screws
torque to 5.6 N m
IQ Battery 5P Quick Install Guide 19

Section B - Installing IQBattery5P
Step 2:
Prepare for eld wiring
Connect the following connectors to the BMS board in the following sequence:
1B3: Temperature sense connector termination (black)
2
B4: Battery voltage sense connector termination (multicolored)
3
B1: Battery DC +ve connector termination
5CS1: Control switch intermediate connector termination
Ensure that all the connectors are latched properly and
clicking sound is heard.
4B2: Battery DC -ve connector termination 1 2
3
4
5
NOTE: There are two variants of the control switch available in IQBattery5P. The control
switch cable is secured to the wiring cover using cable ties. Select the control switch
available at site based on below images and cut the cable ties on the wiring cover to access
the control switch cable.
Cut two cable ties and insert
the connector on CS1 in BMS board
Cut one cable tie and insert the
connector on CS1 in BMS board
B2
B3 B1
B4
CS1
20 IQ Battery 5P Quick Install Guide
Other manuals for IQ Battery 5P
3
This manual suits for next models
1
Table of contents
Other enphase Storage manuals
Popular Storage manuals by other brands

Hama
Hama 104394 Operating instruction

LaCie
LaCie 12big Rack Spare Quick install guide

SimpleTech
SimpleTech SimpleDrivePortable HSD1000 quick start guide

OWC
OWC Mercury Elite Pro Dual Assembly manual & user guide

Seagate
Seagate ST3250601U2-RK - 250 GB External Hard Drive Product overview

Costway
Costway HW64564CF user manual