Envision FAIRWAY RAILING P315 User guide

P315
CPVC
RAILING
INSTALL ATION
QUICK GUIDE
TOOLS NEEDED:
• Drill with #2 Square Drive Bit
• Circular Saw
• Speed Square
• Tape Measure
• Drill Extension
SQUARE CPVC BALUSTERS
W/ DECKBOARD CAP RAIL
LEVEL & STAIR
KIT INCLUDES:
•Top Rail with Aluminum Insert
•Top Sub Rail
• Bottom Rail with Aluminum Insert
•Mounting Brackets with Screws
•Rail Support(s)
•Square CPVC Balusters
™
BY ™

BEFORE STARTING
• Review all local building codes.
• Wear proper safety equipment.
P315
LEVEL INSTALLATION
STEPS 5 & 6
Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by the installer. It is the installer’s responsibility to secure
proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not
account for every special circumstance. The installer must indentify and execute the installation approach that is appropriate for every application.
STEP 2
STEP 3
Baluster
Bottom
Rail
Aluminum Inserts
Equal & Maximum Spacing
STEP 4
Top Rail Bottom Rail
• Find the center of post/mounting surface. (example; 4.25” post= 2-1/8) Mark vertical center
line on post.
• Determine your nished height off deck surface to bottom of bottom rail. Add 3/8” and
mark on vertical center line.
• Drill a 3/16” hole at this mark. Install #10 x 1” screw within 1/8” of surface. Check screw head
clearance by using bottom rail bracket and adjust clearance between screw head and post/
mounting surface to obtain a snap t.
STEP 2 INSTALLATION OF BOTTOM RAIL MOUNTING SCREW
STEP 3 CUT RAILS
• Measure distance between posts and mark bottom rail to correct length.
• Ensure there is equal and maximum distance from baluster holes on both ends of top and bottom
rails. Cut bottom rail with aluminum insert inside to length. Cut top rail, sub-rail and deck board
cap rail the same length, ensuring that the baluster holes line up with bottom rail balusters holes.
NOTE: The top aluminum insert should be inserted with DEEP SIDE of the channel facing the
baluster pocket side of the rail and should be cut ¼” shorter than the sub-rail. The bottom
aluminum insert should be inserted into the bottom rail with DEEP SIDE of channel facing the
baluster pocket side of the rail.
STEP 4 INSTALL RAIL MOUNTING BRACKETS & RAIL SUPPORT
• Place bottom rail inverted on work surface with aluminum insert facing up.
•Bottom Rail Brackets: Place bottom rail bracket on underside of bottom rail aluminum insert
with post mounting ange up. Make certain ange is ush with the end of the bottom rail and
mark the elongated slot. Install one each #10 x ¾” mounting screw for each bracket. Adjust
bracket if necessary.
• Find center of bottom rail and install rail support with one #10 x ¾” screw.
• Top Rail Brackets: With baluster pockets facing up and shallow side of aluminum insert facing
down, slide top rail brackets with mounting anges pointing down on end of top aluminum insert.
On elongated slot, nd center & install one “10 x ¾” screw. Adjust bracket if necessary and install
second screw.
STEP 5 INSTALL RAIL SECTION
• Snap bottom rail onto bottom rail mounting screws between posts and insert balusters into
bottom rail.
• With bottom rail in place, insert sub-rail in place and starting from one end, work the balusters
into sub-rail.
• Pre-drill two 1/8” holes through top mounting bracket holes into post/mounting surface and
install #10 x 1-1/4” screws in both ends of rail.
• Place deck board (not supplied ), top side down, on a non-abrasive surface. With at side
down, center top rail along length and width of the deck board. Using the provided hardware,
Install two #10 x ¾” screws, side by side, at quarter points along top rail.
STEP 6 FINISHING STEPS
• With the deck board cap rail installed on top rail, carefully snap top rail over top aluminum
insert. Ensure that the top rail is seated entirely.
• With rail mounted in place, measure and mark post sleeves to desired height. Cut post to
desired height with a saw and clean edge of cut.
• Apply a small bead of silicone to the inside edge of post cap and install on top of post sleeve.
Let set for 12 hours for adhesive to cure.
Bottom
Rail
2" Space
Center Line of
Mounting Surface
Install Two
#10 x1/4”
Screws
Pre-Drill Two
1/8” Holes
STEP 1 GETTING STARTED
• Plumb all posts or mounting surfaces. Install post trim at this time.
• Determine required bottom rail height off deck surface to underside of rail
based on local building requirements.

BEFORE STARTING
• Review all local building codes.
• Wear proper safety equipment.
P315
STAIR INSTALLATION
Fairway Architectural Railing Solutions will not be held liable for incorrect or unsafe installations by the installer. It is the installer’s responsibility to secure
proper building permits, review local codes and safety needs and meet or exceed them. The instructions provided by Fairway are a guide and may not
account for every special circumstance. The installer must indentify and execute the installation approach that is appropriate for every application.
STEP 2 INSTALLATION OF BOTTOM RAIL MOUNTING SCREW
• Find the center of post/mounting surface. (Example; 4.25” post = 2-1/8)
Mark vertical center line on post.
• Determine your nished height off deck surface to bottom of bottom rail. Add 3/8” and
mark on vertical center line.
• Drill a 3/16” hole at this mark. Install #10 x 1” screw within 1/8” of surface. Check screw
clearance by using bottom rail bracket. Fit should be snug.
STEP 3 CUT RAILS & BALUSTERS
NOTE: The top aluminum insert should be inserted with DEEP SIDE of the channel
facing the baluster pocket side of the rail and should be cut ¼” shorter than the sub-
rail. The bottom aluminum insert should be inserted into the bottom rail with DEEP
SIDE of channel facing the baluster pocket side of the rail.
• Lay bottom rail on stair nosing and against side of posts. Making sure that the
baluster spacing is equal distance from posts on each end, mark the rails where it
intersects with the posts.
• If posts are plumb, the bottom rail, bottom aluminum insert, sub- rail, top rail and
deck board cap rail can be cut to the same length with the same angle. Make sure you
are equidistant from each end.
NOTE: Cut the top aluminum insert a 1/4” shorter for bracket installation.
• Determine angle of stairs and cut on end of each baluster to same angle. Make note
to check baluster length to desired rail height.
STEP 4 INSTALL BRACKETS, BALUSTERS & RAIL
• Place bottom rail inverted on work surface with aluminum insert facing up.
•Bottom Rail Brackets: Place bottom rail bracket on bottom of aluminum insert with post
mounting ange facing upward. Make certain ange is ush with the end of the bottom
sub-rail and mark the elongated slot. Drill a 1/8” hole in the center of elongated slot and
install a #10 x ¾” mounting screw.
• Top Rail Brackets: With mounting anges pointing down on end of top aluminum
insert, (deep part facing baluster) nd center of elongated slot and drill a 1/8” pilot hole.
Install two #10 x ¾” screws. Adjust bracket angles if necessary.
• Using pre-drilled holes on bottom rail, align and attach balusters on angle cut end.
Attach with provided screws. Slide sub-rail into bottom rail with bracket anges facing down.
• Install bottom rail with installed balusters onto mounting screws.
• Set top sub-rail between posts and insert balusters. Start at the bottom of stair run and work up.
• With all balusters inserted, center top rail brackets on post and install two each #10 x
1-1/4” screws.
• Place deck board (not supplied ), top side down, on a non-abrasive surface. With
at side down, center top rail along length and width of the deck board. Using the
provided hardware, Install two #10 x ¾” screws, side by side, at quarter points along
top rail.
STEP 5 FINISHING STEPS
• With the deck board cap rail installed on top rail, carefully snap top rail over top aluminum insert.
Ensure that the top rail is seated entirely.
• With rail mounted in place, measure and mark post sleeves to desired height. Cut post to desired
height with a saw and clean edge of cut.
• Apply a small bead of silicone to the inside edge of post cap and install on top of post sleeve. Let
set for 12 hours for adhesive to cure.
Sub-Rail Bottom Rail
STEP 1
STEP 3
STEPS 4 & 5
STEP 1 GETTING STARTED
• Plumb all posts or mounting surfaces. Install post trim at this time.
• Determine required bottom rail height off deck surface to underside of rail based on
local code requirements.

EnvisionOutdoorLiving.com 1-800-598-5245
#909975
© 2021 FAIRWAY ARCHITECTURAL RAILING SOLUTIONS
Table of contents
Other Envision Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Illusions Vinyl Fence
Illusions Vinyl Fence V300-46 Installation tips

BENITO
BENITO Urban Reb VRV480 Anchoring instructions

Petsafe
Petsafe ZIG00-16969 product manual

Honeywell
Honeywell COMBISAFE 9535 User instruction

Zippity
Zippity LIBERTY LATTICE ZP19053 Assembly instructions

Carlson
Carlson 0460 owner's manual

Fortress Technologies
Fortress Technologies PURE VIEW GLASS BALUSTER FOR Fe26 STEEL installation instructions

ENCLO
ENCLO ZP19074 Assembly instructions

Dolle
Dolle NELE 0600711 installation instructions

Barrette
Barrette HEAVY-DUTY DROP ROD installation instructions

Kiwitech
Kiwitech PowerPac VP POWD instructions

LIFTGATOR
LIFTGATOR VanGator Assembly & operators manual