
Black PANTONE 201 C
TOWER SQUARE
- 1 - - 2 -
– Remove the structure from the packa-
ging and place it on the oor, so that
the hubs with three magnets are on
the top.
– Hold the structure by the tubes above
the hubs marked in the picture.
– Lift the structure, so that the marked
hubs are pointing towards you, and ex-
pand to its full size.
– Place the erected structure on the oor.
– It is advisable to allow the graphic
panels to lie at for about 30 min.
before placing onto the structure.
– The graphic panels are attached by
hanging the magnetic hanger onto
the magnets in the top row of hubs
Please note:
– A top desk is available for EUROtowers
1 and 2. It is to be placed onto the
metal rods on the top of the tower.
– To provide the maximum stability with
EUROtower square 1 and 2 we recom-
mend using the reinforcement bars.
– Please note that, when using the top
desk it is necessary to use the rein-
forcement bars. The reinforcement
bar should be attached to the special
inserts in the diagonal hubs using the
screws provided.
– To attach the lights use the square con-
nector for lights.
– Unwrap the magnetic bars and attach
them to the magnets in the hubs.
– The structure is ready for installing
the graphics.
Never slide the magnetic bars on top
of each other, it would damage the
magnetic eld!!!
packaging
1. Flight bag for graphic panels.
2. Transport bag, square.
3. Transport bag for magnetic bars.
– Max. load of table: 10 kg
Notice:
For interior use only!
3.
1.
2.
Graphic panels can be cleaned using
water and detergent; laminated
panels can also be cleaned with an
alcohol-based cleaner.
Always roll up the graphic panels
with the print on the outside!