
10 Farmnavigator G7 Dataseed – User Manual
Before starting work in the eld it is necessary:
-To Check the correct installation of the solenoid valves and sense of work:
1. Read Par. 2.1 to start a trial recording;
2. With the RIGHT cable connected to the coil that generates the
movement of the translator to the right, press the RIGHT button in the
work page (the left of the operator sitting on the tractor seat);
3. With the LEFT cable connected to the coil that generates the movement
of the translator to the left, press the LEFT button in the work page
(the right of the operator sitting on the tractor seat);
-To bring the movement of the translator to the end of stroke to the left and to
the right and check that the wiring is not an obstacle during handling
ATTENTION: always check the tool handling area.
1.6.1 ECU Dataseed troubleshooting
Any communication / connection errors are shown both on the display
and through a LED positioned in the center of ECU Dataseed. Here are
the errors and possible solutions:
Error Error detail Solution
Display, ECU Error
There is no
communication between
the display and the ECU.
- Check that the 9-pin serial
cable is correctly connected to
the “Controller” port;
- Check that the ECU
Dataseed is correctly powered
(LED on).
ECU Dataseed,
Flashing Purple LED
light
There is no
communication between
the display and the ECU.
- Check that the 9-pin serial
cable is correctly connected to
the “Controller” port;
- Check that the ECU
Dataseed is correctly powered
(LED on);
- Start a registration of a track
/ open and repeat a saved
track.