Five9NS T3105K1 User manual

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 1
Five9NS T3105K1 Workstation
Installation Manual
Version 6, May 6, 2014: This version supersedes all previous versions.
2014 Five9 Network Systems LLC, 300 Main Street, Suite 12A, East Rochester, NY, 14445, USA
All rights reserved.
This product or document is protected by copyright and distributed under licenses restricting its use, copying, distribution, and decompilation.
No part of this product or document may be reproduced in any form by any means without prior written authorization of Five9NS and its
licensors, if any.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 2
Table of Contents
Section Description Page
1.0 General Information ....................................................................... 3
1.1 Introduction ......................................................................................... 3
1.2 Purpose of the Equipment ................................................................... 3
2.0 Application ...................................................................................... 3
2.1 Introduction .......................................................................................... 3
3.0 Installation ....................................................................................... 4
3.1 Prior to Installation ................................................................................ 4
3.2 Unpacking and Inspection ..................................................................... 5
3.3 Cautions and Warnings…………………………………………………………………….. 5
3.4 Wiring ………………………............................................................................ 6
3.5 Physical Characteristics .......................................................................... 6
3.6 Electrical Characteristics ........................................................................ 6
3.7 Post-Installation Test ............................................................................. 7
4.0 Safety Information
4.1 Typical Application..….............................................................................9
4.2 Cautions and Warnings………………………………………………………………………. 9
5.0 Sicherheit (German Safety Provisions)...............................................10

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 3
T3105K1
3U Rack Mount / Workstation
1.0 General Information
1.1 Introduction
This manual contains information for the proper installation of the Five9 Network
Systems, LLC. Workstation, Model No: T3105K1. Also included are physical and
electrical characteristics of the unit.
1.2 Purpose of the Equipment
1.2.1 Five9NS’ T3105K1 is a tower workstation designed specifically for Entry-
level server and workstation applications. It supports a large range of
Intel Xeon x86 processors from dual-core to quad-core, which are carried
as a part of the Intel Embedded IA Extended Life Cycle Support. In the
recommended installation, the unit receives power from an AC power
source and is placed in a cabinet in a workstation-like position.
1.2.2 It supports Solaris which is the most scalable and secure operating
system. With Solaris, the T3105K1 server provides fast performance,
near-continual uptime, and the security and reliability required from a
controller.
2.0 Application
2.1 Introduction
The T3105K1 is a 100-240 VAC product that can serve as either a workstation or a
cabinet-enclosed unit. If the unit is used as a workstation, it will be in a restricted
access location away from the general public. The unit contains an Intel
motherboard and CPU. Included also in the unit is a 1TB hard drive storage
device.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 4
3.0 Installation
3.1 Prior to Installation
The T3105K1 is a simple module to install. Before installation, the following items
should be considered:
3.1.1 Careful consideration of the location of the T3105K1 is necessary. Some
of the items to consider include:
Space to allow adequate airflow
Length of cable runs
Environmental conditions
Access for service repair (if applicable)
3.1.2 The T3105K1 shall be installed to conform to the standards designated by
the customer and manufacturer specifications as to the unit location and
type of installation.
3.1.3 The following installation instructions should be followed
A) Elevated Operating Ambient - If installed in a closed assembly, the
operating ambient temperature of the assembly environment may be
greater than room ambient. Therefore, consideration should be given to
installing the equipment in an environment compatible with the
maximum ambient temperature (Tma) specified by the manufacturer.
B) Reduced Air Flow - Installation of the equipment in a closed assembly
should be such that the amount of air flow required for safe operation of
the equipment is not compromised.
C) Mechanical Loading - Mounting of the equipment in the closed
assembly should be such that a hazardous condition is not achieved due
to uneven mechanical loading.
D) Circuit Overloading - Consideration should be given to the connection
of the equipment to the supply circuit and the effect that overloading of

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 5
the circuits might have on overcurrent protection and supply wiring.
Appropriate consideration of equipment nameplate ratings should be
used when addressing this concern.
E) Reliable Earthing - Reliable earthing of enclosed equipment should be
maintained. Particular attention should be given to supply connections
other than direct connections to the branch circuit (e.g. use of power
strips)."
F) System Maintenance - Maintenance and servicing of this product is to
be performed only by trained service personnel who are knowledgeable
on the procedures and hazards associated with this product.
G) Cautions and Warnings –All caution and warning instructions noted on
the product and in the manual should be followed (see Section 3.3 below
for details).
3.2 Unpacking and Inspection
3.2.1 Carefully open the packaging and remove the T3105K1. Verify that all
components have been included in the package per the packing list.
Inspect the unit for shipping damage.
3.2.2 If damage has occurred during shipping, a claim should be filed with
Five9NS and an RMA shall be obtained from Five9NS.
3.3 Cautions and Warnings
3.3.1 Do not remove any factory-installed screws
3.3.2 Do not install near heat sources
3.3.3 ESD (Electro Static Discharge) guidelines shall be followed when installing
the optional equipment.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 6
3.3.4 CAUTION: Risk of explosion if battery is incorrectly replaced. Replace only
with the same or equivalent type recommended by the manufacturer.
Dispose of used batteries according to the manufacturer's instructions.
3.4 Wiring Requirements
3.4.1 The length and routing of external cables should be carefully studied and
planned before attempting installation of the equipment. Allow adequate
space for installation of cable and connectors. Avoid sharp bends.
3.5 Physical Characteristics
3.5.1 The T3105K1 shall be located away from heat sources, magnetic fields
and areas with excessive dust.
3.5.2 When sitting on a table top, avoid uneven or unstable work surfaces
3.6 Electrical Characteristics
3.6.1 Electrical Specifications
Electrical
Input Voltage
100-240 Vac
Input Current
5-2.5 Amps max
Input Frequency
60-50 Hz

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 7
3.6.2 Power Switches
The T3105K1 has 3 power switches: a System Power Switch and a System Reset
Switch in the front as well as a general On/Off switch on the power supply from
the back. The following diagram shows the front power switches (bottom right)
The System reset switch will soft reset the system; the PSU will not cycle
the power ON / OFF.
The System power switch will power ON / OFF the system power supply
according to Motherboard BIOS setting, (if you press power switch over 4
seconds the system will power off)
The power switch on the back is a general On/Off switch providing the ability to
hard turn off the system
3.7 Post-Installation Test
Once the T3105K1 is properly installed, turn the system on and verify using a
monitor that the motherboard is booting up. To test with Solaris 10, use the
following guidelines:
Power On
Indicator
HDD Activity
System Reset
Switch
System Power
Switch

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 8
Login as root -> Open a shell window and type in the following commands:
cd /usr/sunvts/bin
./startsunvts
You will have to choose between different interfaces to run SUNvts with. Choose
the command line option and enter the following commands:
./vts_cmd list_tests
This command lists all the tests to be performed. Make sure all test are enabled.
To enable a certain test use the following: ./vts_cmd enable_test
testname
./vts_cmd set_global_options [Duration of
Testing:60,Verbose:Enable]
This will run the tests for 60 minutes.
./vts_cmd start
This will start the testing. You can stop the tests anytime using: ./vts_cmd
stop. Please refer to the SUNvts user guide for more information.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 9
4.0 Safety Information
4.1 Typical Application. The T3105K1 will only be used in printing applications
as part of the end-product printing system or in other embedded
applications. For printing applications, the monitor connected to the
server on the production floor will act as an indicator to be used only for
starting a printing job.
4.1.1 This product is not intended for use in the immediate/direct visual
field of the display work place. To avoid disturbing reflections on the
display work place, this product shall not be placed in the
immediate/direct field of vision.
4.1.2 The unit is only for use in IT server rooms, production floors, and
other restricted access locations away from the general workplace
environment.
4.2 Cautions and Warning
4.2.1WARNING: Caution should be used when working inside the
server due to the exposed nature of the system fans.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 10
5.0 Sicherheit
5.1 Das T3105K1 sollte nur in den Druckanwendungen als Teil des Endprodukt
Drucksystems oder in anderen Embedded-Anwendungen verwendet werden. Für
Druckanwendungen, wird der Monitor, der mit dem Server in der Produktion verbunden
ist, nur als Indikator für den Start eines Druckauftrags verwendet funktionieren.
5.1.1 Dieses Gerät ist nicht für den Einsatz im unmittelbaren / direkten Sichtfeld
des Displays am Arbeitsplatz bestimmt. Um störende Reflexionen auf dem Display am
Arbeitsplatz zu vermeiden, darf dieses Produkt nicht in der unmittelbaren / direkten
Sichtfeld platziert werden.
5.1.2 Das Gerät ist nur für den Einsatz in IT-Serverräumen, Produktionshallen
und anderen Orten mit eingeschränktem Zugang abseits der allgemeinen
Arbeitsplatzumgebung gedacht.
5.1.3 Gehen Sie wie folgt vor, um das Gerat für die Verwendung einzurichten.
A) Erhöhte Betriebsumgebungstemperatur - Wenn das Gerät in einer
geschlossenen Baugruppe installiert ist, kann die
Betriebsumgebungstemperatur der Montageumgebung größer sein als
die Raumtemperatur. Deshalb sollte bei der Installation der Geräte darauf
geachtet werden, dass die Temperatur in der Umgebung mit der vom
Hersteller angegebenen maximalen Umgebungstemperatur (TMA)
kompatibel ist.
B) Reduziertee Luftzirkulation- Lassen Sie genügend Abstand zu allen
belüfteten Seiten des Geräts, um die erforderliche Luftzirkulation für die
Lüftung zu gewährleisten. Ohne Luftzirkulation konnen die Geräte
Schaden nehmen und es könnte sogar ein Brand enstehen.
C) Mechanische Belastung - Montieren Sie das Gerät nicht in der
geschlossenen Einheit so, dass sich eine gefährliche Situation durch

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 11
ungleichmäßige mechanische Belastung ergeben kann.
D) Überlastung des Stromkreises –Eine besondere Beachtung sollte dem
Anschluss an den Versorgungsstromkreis und einer möglichen
Auswirkung einer Überlastung der Überstromschutzeinrichtung bzw.
Verkabelung gewidmet werden. Die technischen Leistungsdaten auf dem
Typenschild des Produktes sollten hierbei berücksichtigt werden.
E) Zuverlässige Erdung–Um Stromschläge zu vermeiden, schließen Sie
das Gerät ordnungsgemäß an geerdete Schutzkontaktsteckdosen an.
Beachten Sie bei der Verwendung von Verlängerunskabeln oder
Steckerleisten die Einhaltung der elektrischen Spezifikationen.
F) System Wartung –Versuchen Sie nicht, die Wartung Ihres Geräts selbst
durchzuführen. Wartung und Pflege des Produktes ist nur durch
geschultes Servicepersonal, das Wissen über die Verfahren und Gefahren,
die mit diesem Produkt verbunden sind, besitzt, auszuführen.
G) Vorsichtshinweise und Warnungen - Alle Vorsichts- und Warnhinweise
auf dem Produkt und in der Bedienungsanleitung müssen beachtet und
befolgt werden.
5.1.4 Vorsicht und Warnungen
A) Keine vorinstallierten Schrauben nicht entfernen.
B) Halten Sie das Gerät von Wärmequellen fern.
C) Schutz vor elektrostatischer Entladung. Die Elektrostatische
Entladung (ESD) Leitlinien müssen bei der Installation von
Zusatzausstattung befolget werden.

Five9 Network Systems LLC. T3105K1 Installation Manual
Document # 000003, Rev 6, 05/06/2014 Page 12
5.1.5 VORSICHT: Bei Einsetzen eines falschen Akkus oder Verwendung eines
ungeeigneten Akkus besteht Feuer- oder Explosionsgefahr. Ersetzen Sie
den Akku nur durch denselben oder einen gleichwertigen vom Hersteller
empfohlenen Typ und befolgen Sie sorgfältig die
Installationsanweisungenen. Entsorgen Sie verbrauchte Akkus
ordnungsgemäß.
5.2 Vorsicht
5.2.1 Warnung: Bei Arbeiten im Inneren des Servers aufgrund der exponierten
Art der Systemlüfter ist Vorsicht geboten.
Table of contents
Languages: