Force USA F-F50 User manual

USER MANUAL | F-F50

2
ASSEMBLY MANUAL
BEFORE YOU START
Read all instructions in this manual before assembling or using this equipment.
Remove all parts from the packaging and separate and count each various component to ensure
everything has been correctly provided.
Follow the instructions and consult both the individual assembly pages and the overall expanded
views of the equipment.
It is the owner’s responsibility to ensure that all users of this unit have read the owner’s manual and
are familiar with the safety precautions.
We recommended you save these instructions
SAFETY PRECAUTIONS
Highly recommended for two or more people to assemble the equipment
Assemble equipment on a flat surface
Consider placing a mat under equipment to protect your floor
Only tighten nuts and bolts by hand until whole equipment is assembled
Ensure all parts are in working order prior to use
Do not use equipment outdoors or around water
Keep hair, fingers and clothing away from moving parts
Only use attachments recommended by the manufacturer
Never operate if parts are not functioning correctly
Always stretch prior to using equipment
Stop immediately if you experience any pain, dizziness or nausea.
Before starting any exercise program consult your doctor
PLEASE NOTE: Descriptions of pieces as LEFT and RIGHT are from the point of view of standing
behind the equipment facing towards the front.

3
IMPORTANT ASSEMBLY INFORMATION
NOTE: It is strongly recommended that this equipment is assembled by two or more
people to avoid possible injury.
Tools Required for Assembling the Bench: Adjustable Wrench and Allen Wrench.
Ensure Carriage Bolts are inserted through the SQUARE holes on components that need to be
assembled. Attach washer only to end of the Carriage Bolt.
Use Allen Bolts or Hex Bolts inserted through the ROUND hole on components that need to be
assembled.
Always wait until all bolts are assembled onto the bench before tightening the bolts. Do not
tighten each bolt right after it is installed
FASTEN NUTS AND BOLTS
Securely tighten all Nuts and Bolts after all
components have been assembled in
current and previous steps.
NOTE: Do not over tighten any component
with pivoting function. Make sure all
pivoting components are able to move
freely.
Do not tighten all Nuts and Bolts in this
step.

ASSEMBLY MANUAL
Parts list-1 (individual packaging)
NO 1 Base welding
sets*2pcs NO 2 Rear riser assembly*2
pcs NO 3 Center column
assembly* 2pcs
NO 4 Top component*2pcs NO 5 Optical axis fixing
group*2pcs NO 6 Middle connection
components*1pcs
NO 7 Upper beam
assembly*1 pcs NO 8 Lower connection
components*1pcs NO 9 Functional trainer
right pully*1pcs
NO 10 Functional trainer left
pully*1pcs NO 11 Push combination
assembly*1pcs NO 12 Barbell bar welding
group*4pcs
NO 13 Optical shaft sleeve
welding group*2pcs NO 14 Left hook welding
group*1pcs NO 15 Left hook welding
group*1pcs
4

NO 16 Left safety welding set
*1pcs NO 17 Left safety welding
set*1pcs NO 18 Left parallel bar welding
group *1pcs
Parts list-2 (individual packaging)
NO 19 Right parallel bar
welding group*1pcs NO 20 Lifting welding
group*1pcs NO 21 Low pull welding
group*1pcs
NO 22 Lat Pulldown welding
*1pcs NO 23 Left Smith Insurance
Group *1pcs NO 24 Right Smith Insurance
Group*1pcs
NO 25 Pully and weight stack
group*2pcs NO 26 Landmine Group*1pcs NO 27 Push bar welding*1pcs
NO 28 Foot rack group*1pcs NO 29 Low pull pedal
group*1pcs NO 30 Barbell rod welding set
* 4 pcs
5

Parts list-3 (assembly parts)
NO 31 Right upper cover *2pcs NO 32 Left upper cover*2pcs NO 33 Right lower cover *2pcs
NO 34 Left lower cover*2pcs NO 35 Label board *1 NO 36 Wire rope*2 pieces
NO 37 Olympic Chrome
Bar2.2meter-1pcs NO 38 Stainless steel conduit
*2pcs NO 39 Smith optical axis
*2pcs
NO 40 cover optical axis*4pcs NO 41 Safety hook *4pcs NO 42 Low pull bar*2pcs
NO 43 Card slot set*2pcs NO 44 Rubber cover*2pcs NO 45 Small aluminum
cap*2pcs
No.46 Bottom nylon sleeve * 2
pieces No.47 Sheath*8 pieces No.48 Insurance guide
sleeve*4 pieces
6

Parts list-4 (assembly parts)
No.49 Chain 0.35m*2 pieces No.50 T type bolt *1 No.51 Stainless steel butterfly
clip *2
No.52 Triceps press rope *1 No.53 Weight piece rubber
sleeve * 4 pieces No.54 Blister pack*2
Blister pack screw schedule-5 (standard parts)
A
Hexagon socket flat
head screw
M10*100*46 pcs
BHexagon socket flat head
screw M10*70*4 C
Hexagon socket flat
head screw
M10*60*18pcs
D
Hexagon socket flat
head screw
M10*20*19pcs
EHexagon socket head
screw M10*25*8 F Lock nut M10*70pcs
G Flat gasket Ø10*70pcs
7

Assembly steps
Steps No. Name QTY project
number Name QTY
1
No.1 Base welding group 2
Tools/equipment
Put two base welding group on the ground, keep in same direction and 1.2m distance
8

Assembly steps
Steps No. Name QTY project
number Name QTY
2
No.2 Rear riser assembly 2
CM10*60 hexagon socket
flat head screws 4
GØ10 flat gasket 4
F M10 lock nut 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
Put the Rear riser assembly on the base as shown in the picture, pay attention to the upper and lower
ends.
9

Assembly steps
Steps No. Name QTY project
number Name QTY
3
No.6 Middle connection
components 2
AM10*100 hexagon socket
flat head screws 4
G Ø10 flat gasket 4
F M10 lock nut 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
Install the connecting components as shown in the figure, paying attention to the installation
direction of the riveting surface.
10

Assembly steps
Steps No. Name QTY project
number Name QTY
4
No.8 Lower connection
components 1
AM10*100 hexagon socket
flat head screws 4
G Ø10 flat gasket 4
F M10 lock nut 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
Install the connection components as shown
11

Assembly steps
Steps No. Name QTY Project
Number Name QTY
5
No.3 Center column assembly 2
DM10*20 hex socket flat
head screw 4
Tools/equipment No. 6 hexagon socket screwdriver
Install the center column assembly as shown in the figure, paying attention to the upper
and lower ends of the center
column.
12

Assembly steps
Steps No. Name QTY project
number Name QTY
6
No.4 Top component 2 F M10 lock nut 4
CM10*60 hexagon socket
flat head screws 4
DM10*20 hex socket flat
head screw 4
G Ø10 flat gasket 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
Install the top parts as shown in the figure, do not tighten the screws temporarily, just hang them, so as to
facilitate the later assembly of other accessories
13

Assembly steps
Steps No. Name QTY project
number Name QTY
7
No.5 Optical axis
fixing group 2 C M10*60 hexagon socket
flat head screws 8
No.40 Small door optical axis 4 E M10*25 hexagon
socket head screw 8
No.53 Weight piece
rubber sleeve 4 G Ø10 flat gasket 8
No.25 Pulley with
reorganization2 F M10 lock nut 8
No.30 Barbell bar
welding group 4
Tools/equipment No. 6, No. 8 Allen screwdriver, wrench
The left side is assembled and assembled in the same way as the right side
14

Assembly steps
Steps No. Name QTY project
number Name QTY
8
No.13 Optical shaft sleeve
welding group 2 No.24 Smith Insurance Group
Right 1
No.39 Smith Optical Axis 2 No.46 Bottom nylon sleeve 2
No.48 Insurance guide set 4
No.23 Smith Insurance Group
Left 1
Tools/equipment
The left and right Smith optical shafts are assembled in the same way. Please distinguish between No. 23
and No. 24 directions. After installation, you can tighten the untightened screws.
15

Assembly steps
Steps No. Name QTY project
number Name QTY
9
No.9 Sliding sleeve Cross set
right 1 G Ø10 flat gasket 4
No.10 Sliding sleeve Cross set
Left 1 F M10 lock nut 4
No.38 Stainless steel conduit 2
BM10*70 hexagon socket
flat head screw 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
The lettering surfaces of the regulating tube are installed facing inwards, the lettering sequence is from
bottom to top, and the left and right adjustment groups are assembled in the same way. Pay attention to
distinguish between No. 9 and No. 10.
16

Assembly steps
Steps No. Name QTY project
number Name QTY
10
11 Recommended
combination package 1
DM10*20 hex socket flat
head screw 4
F M10 lock nut 4
G Ø10 flat gasket 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
Install the recommended combination as shown.
17

Assembly steps
Steps No. Name QTY project
number Name QTY
11
No.36 Cable 2 No.44 Rubber cover 2
No.41 Standard safety hook 2 No.45 Small aluminum cap 2
No.42 Low pull handle 2
No.43 Card slot set 2
Tools/equipment No. 4 6 hexagon socket screwdriver, wrench
Note that the two ends of the wire rope are divided into large and small ends, pay attention to the direction of the joint, and
remove the two pulleys at the bottom of the base when threading.
18

Assembly steps
Steps No. Name QTY project
number Name QTY
12
No.31 Upper guard plate right 2 F M10 lock nut 16
No.32 Upper guard plate left 2
AM10*100 hexagon socket
flat head screws 16
G Ø10 flat gasket 16
Tools/equipment No. 6 hexagon socket screwdriver, wrench
As shown in the figure, please note that no screws are installed in the two holes marked, which are
reserved for the next installation of the beam.
19

Assembly steps
Steps No. Name QTY project
number Name QTY
13
No.7 Upper beam assembly 1
AM10*100 hexagon socket
flat head screws 4
G Ø10 flat gasket 4
F M10 lock nut 4
Tools/equipment No. 6 hexagon socket screwdriver, wrench
As shown in the picture, install the upper beam assembly.
20
Table of contents
Popular Sport & Outdoor manuals by other brands

MEGAlink
MEGAlink ML2000 user manual

Haspo
Haspo Mini plus Assembly instruction

X-Stand
X-Stand X-scape XSCT344 Assembly and Safe Use Manual

ItsaGoal
ItsaGoal FASTSTARTQUICKGOAL 8' X 6' FOLDING FITTING INSTRUCTION

Lifetime
Lifetime 71526 Assembly instructions and owner's manual

VIRTUFIT
VIRTUFIT Foldable Fitness Trampoline user manual