Fortress Building Products A2 User manual

A2 COMMERCIAL FENCING
1
A2 COMMERCIAL ALUMINUM FENCING
INSTALLATION INSTRUCTIONS

2
A2 COMMERCIAL FENCING
English
Fence Layout
Warranty
TABLE OF CONTENTS

A2 COMMERCIAL FENCING
3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
Before You Begin
Call811beforeyoudigpostholestolocateandidenfy
anyburiedulies.
Note
•
Torx Safety Tips
Tip:Pre-drillholeswith3/16”[5mm]drillbit.

4
A2 COMMERCIAL FENCING
Required Tools
Extender
Ground
A2 FENCE OPTIONS
Posts
or
Blank Post End Post Line Post Corner Post

A2 COMMERCIAL FENCING
5
Panel Styles
•
• Rail : |Picket:
Gate Upright: |Air Space:
BracketOpons
A2 Flush Mount Bracket
A2 Swivel Mount Bracket
Gate styles
•
Flat & Arched Gates
StandardWeldedGateOpons
Flat Top
FlatTop/FlatBoom-
Spear Point
PressedSpear/FlatBoom

6
A2 COMMERCIAL FENCING
FENCE LAYOUT
Step 1: Sketch Layout of Fence Perimeter
Note:
•
2-1/2” [64mm] Post
3” [76mm] Post
2-1/2” [64mm] Post
3” [76mm] Post
Fig.1
Corner
Post
Line Post
Line Post
Line Post
Corner
Post
Line
Post
Line
Post
Corner
Post
Line Post
Line Post
Gate
Post
Gate
Post
Gate
Post
Gate
Post
Gate
Post
Gate
Post
Walk
Gate
Walk
Gate Building

A2 COMMERCIAL FENCING
7

8
A2 COMMERCIAL FENCING
Step 2: Use Stakes & String to Create Perimeter
Tip:
•
Fig.1
Step 3: Dig Post Holes
1. "
2.
Note:
XXX
X
X
X
XXXX
X
XX
X
XX
Stake
Start 2
Cut
Panel
Start 4Start 3
Cut
Panel
Stake
Start 1 Building

A2 COMMERCIAL FENCING
9
Fig.1
Step 4: Set Posts
Fig.1 Fig.2
Fig.3

10
A2 COMMERCIAL FENCING
POST & PANEL INSTALLATION
Step 1: Install Panels Into Posts
Tip:
•
Look
•
•
•
• DO NOT
Fig.1 C
Fig.2 Side View

A2 COMMERCIAL FENCING
11
Fig.4
Fig.5
Fig.3 Top View
Step 2: Pour Concrete
Tip:

12
A2 COMMERCIAL FENCING
Fig.1
BRACKET & PANEL INSTALLATION: A2 FLUSH MOUNT BRACKET
Bracket Details:
•
• NOT REQUIRED
Step 1: MarkbracketLocaonsOnSurface
Tip:

A2 COMMERCIAL FENCING
13
Fig.1 Fig.2
Fig.3 Fig.4
Step 2: Pre-Drill and Install Brackets
Fig.1

14
A2 COMMERCIAL FENCING
Step 3: Install Panel Onto Bracket & Post
Fig.1 Fig.2
Fig.3 Fig.4

A2 COMMERCIAL FENCING
15
Side View
BRACKET & PANEL INSTALLATION: A2 SWIVEL MOUNT BRACKET
Bracket Details:
•
• NOT REQUIRED
Step 1: MarkBracketHoleLocaons
Fig.2Fig.1
B
3 & 4 Rail Panel
2 Rail Panel
B
A
A
C
Fig.5 Fig.6 Top View

16
A2 COMMERCIAL FENCING
FT-FB
Fig.3 BracketHoleLocaons
Pre-drill Dimensions:
2 Rail Panel
A
C
FT-FB
3 Rail Panel
AB
FT
FT-FB
SP
4 Rail Panel
AB
C
B
D
PSFB
Step 2: Pre-Drill and Install Brackets
Tip:
• It’simportanttodoublecheckdimensionstoconrm
accuracyofbracketholelocaonsbeforedrilling.

A2 COMMERCIAL FENCING
17
Fig.1 Fig.2
Fig.3 Fig.4
Tip:
• DO NOT
•
•
Step 3: Install Panel Onto Bracket & Post

18
A2 COMMERCIAL FENCING
Fig.1 Fig.2
Fig.3 Fig.4
C
Fig.5 Side View
Fig.6 Top View
PANEL CUTTING
Step 1: Measure The Panel Opening Length

A2 COMMERCIAL FENCING
19
Tip:
•
•
Fig.1 Fig.2
Step 2: Mark Panel with Cut Points
Note:
•
Top View
Top View
Fig.1

20
A2 COMMERCIAL FENCING
Step 3: Cut & Clean Panels
Fig.3 Fig.4
Fig.2
Step 4: Apply Spray Paint To Cut Areas
nd
Fig.1
Table of contents
Other Fortress Building Products Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Betafence
Betafence O-LOX installation manual

Fortress Technologies
Fortress Technologies Osbourn IBL-H operating instructions

Fortress Technologies
Fortress Technologies INSPIRE installation instructions

XCEL
XCEL UNIVERSAL POST installation guide

ENCLO
ENCLO EC18033 Assembly instructions

Casanoov
Casanoov KIT-000018 manual