User’s manual - Core 8 V1.1 03/2020 5/8
4. Technical Specifications
Ref. PS820DP
Standards
IEEE 802.3/u 10/100/1000BaseT/TX
IEEE 802.3x Flow Control
IEEE 802.3 at/af PoE
midspan PoE
Ports
Number of ports: 10
PoE ports: 8
PoE activation (On/Off): Dip-Switches
Ethernet switch features
MAC Address: 8K
Buffer Memory: 128KB
Store and Forward
Packet filtering/transmission
speeds
1000Mbps port - 1,488,000pps
100Mbps port - 148,800pps
10Mbps port - 14,880pps
Network cables 100/1000BaseTx Cat. 5 UTP/STP
10BaseT Cat. 3, 4, 5 UTP/STP
Standard wiring PoE 4, 5, 7, 8
LED indicators
Ports Link 1 à 8: 10/100 Mbits/s, PoE ON/OFF
Ports Uplink 9 et10: 100/1000 Mbits/s
Pour l’appareil: Power
Power Input: 100-240 VAC, 50~60 Hz
Outputs: 56 VDC 4.46 A (250 W)
PoE power on each port 30 W
Dimensions 40 × 480 × 118 mm (H x W x D)
Weight 1,70Kg
Operating temperature range 0°C to 40°C
Storage temperature range -20°C to 90°C
Humidity 10 to 90% (non-condensing)
Certifications FCC Classe A, CE