Galvo Shed GVO 1515 User manual

GVO 1515
SLOPING ROOF SHED
1530mm wide x 1530mm deep x 1980mm - 1830mm high
ASSEM BLY
INSTRUCTIONS
YOU SHOULD HAVE ONE PACKAGE:
• 1 cardboard package
TOOLS REQUIRED:
• Battery or electric drill
• 3.3mm (1/8th inch) drill bit
• Screwdriver or riveter
• Tape measure
• Ladder
• Non-slip gloves, good
shoes and goggles
• A set of helping hands
CALL 0508 454 873
for an installer near you
Some parts have sharp edges and should
be handled very carefully. We recommend
the use of protective gloves and footwear
when assembling.
DO NOT attempt to erect this shed in windy
weather. All dimensions are approximate.
PACKED BY:
Please quote this code for any
correspondence back to the supplier

If you choose to vary from these instructions your warranty will be impaired
2
1
IMPORTANT!
• Remove the swarf (drill filings) from the panels as you assemble them.
• All components are cut to length. Do not cut any parts unless instructed.
• Fixings through the inside of the channels into the sheeting are just as important as
fixings from the outside.
RIBS AND PANS
• Generally most fixings are spaced at 300mm apart.
• Keep the fixings in the pans as close to the ribs as possible for added strength.
• Ribs will always protrude to the outside of the shed.
• Extra internal fixings are strongly recommended in high wind areas. PAN
RIB
DIAGRAM 1 DIAGRAM 2 DIAGRAM 3
COMPONENTS CHECKLIST
Please check all components carefully and advise your supplier immediately if any discrepancies.
Remember to quote the code on the front page.
1 x 1920 x 780mm door sheet 1 x narrow 1980 x 715mm sheet
for front wall, beside door
4 x 1980-1830mm sloping sheets
(2 left, 2 right)
2 x 1920mm 'U' channels
for door sides
1 x pack screws with padbolt
1 x pack of rivets and hinges
2 x 1830mm 'L's for flashing the
roof to the side walls
2 x 1830mm sheets for the roof
4 x 1485mm 'U' channels
for end walls
1 x 310mm door plate
2 x 780mm 'U' channels (door top
and bottom)
2 x 1830mm sheets for back wall
6 x 1515mm 'U' channels for front,
back and roof
2 x 793mm 'U' channels
(door spacers)
Door bracing
BUILDING YOUR SHED
• The basic task is to join the sheets together to
form your panels, and fix channels to the top
and bottom of these panels. They will then join
together to form your shed (diagram 1, 2, and 3).
2 x 1980mm 'Z' door jambs. (1 length
has 'U' channel attached)
A
G
D
J
M
B
H
E
K
N
C
I
F
L
O

If you choose to vary from these instructions your warranty will be impaired 3
NARROW PAN
30MM
4MM
GAP
HINGES
The hinges should protrude
over the top of the channel
YOU WILL NEED
1 x 1920mm x 780mm door sheet
2 x 1920mm 'U' channels for door sides
2 x 780mm 'U' channels (door top
and bottom)
1 x 310mm door plate
Hinges
Door bracing
YOU WILL NEED
1 x 1980mm x 715mm sheet for front wall
1980mm 'Z' door jambs without
channel attached
STEP 1 DOOR ASSE MBLY
Attach the 780mm 'U' channels Jto the top and bottom of the door sheet
Aat the centre ribs only. Attach the 1920mm 'U' channels Hto the door sheet A
through the top and bottom channels Jat the four corners. Attach the door plate M
in the centre of the door sheet, slipping it under the two side 'U' channels and fixing it to
the sheet ribs and the side 'U' channels. Attach the hinges Napprox 150mm from the
top and bottom of the door through the 'U' channels. The fixings should be centred on the
side 'U' channels.
Turn the door over and fix the four corners through all the 'U' channels (step 2 below).
Fit the door bracing from the bottom corner to the opposite centre to the top corner
(see step 7 on page 6).
STEP 2 HANGING THE DOOR
Attach the first 'Z' door jamb Lto the 715mm sheet Bon the rib with the narrow
pan. Lay the premade door face down on the 715mm sheet Bapprox 30mm up from
the bottom and down from the top. Check the door is centralised on the sheet (top and
bottom). Fix the hinges through the side of the 'Z' door jamb Lraising the door about
4mm off the 'Z' door jamb.
150MM
A
H
J
M
N
O
H
J
N
J
M
A
H
B
L
B
L

If you choose to vary from these instructions your warranty will be impaired
4
3
STEP 3 FRONT WALL
Lay out the door with the sheet attached and the corner door jamb with the 'U' channel
attached (as shown below). Cap the sheets with the 1515mm channels F. Use the door
spacers Fto make sure the door fits the gap (they sit on top of the 'Z' door jambs L).
Drill and fix the channels at every second rib down through the top.
Attach the door spacers at each end through the 'Z' door jambs and channels. Put three
fixings underneath through the channels into the sheeting pan and the top and bottom of
the door spacers and 'Z' door jambs (see diagram 1).
Fit the padbolt to the door strap on the outside of the door using wide flange
fixings or screws.
ADDITIONAL
INFORMATION
Channels will come short
of the ends of the sheeting by
10-15mm on all panels.
PADLOCK KEEPER
ASSEM BLY
KEEPER
WASHER
RIVET
CHANNELS
The higher side of the channel goes to the
inside of the shed. It is very important to
include the fixings on the underside of all
the channels as they are structural (except
roof channels).
SPACERCHANNEL
Fix through the top and bottom of the channels into the door
jamb and spacer. The door jamb goes on inside of the channel.
OUTSIDE
INSIDE
GALVO TIP
To hinge the door on the opposite
side, simply put the top channel
on the bottom and the bottom on
the top.
Put the padbolt on the door
before erecting the panels. It will
stop the door swinging around!
YOU WILL NEED
2 x 1515mm 'U' channels
2 x 793mm 'U' channels (door spacers)
1 x 1980 mm x 715mm sheet
'Z' door jambs (attached to B)
Padbolt
F
I
B
L
N
L
N
B
F
F
I
I

If you choose to vary from these instructions your warranty will be impaired 5
DIAGRAM 1
STEP 4 BACK WALL
Join the two sheets C together with 2 fixings through the overlapping
ribs, making sure the ends of the sheets are flush. Cap the sheeting with
the 1515mm 'U' channels F .
Fix the channels through the end ribs and every second rib in between.
Make sure you put at least one fixing per sheet up through the underside
of the channel into the pan of the sheet.
STEP 5 ROOF
Join the two sheets D together, same as the back. Cap the sheeting with the 1515mm 'U'
channels F . Fix the channels at every second rib but not the corners at this stage.
Place the short flange of the first 'L' flashing K on top of the rib at one end.
Make sure the ends are flush with the sheeting (diagram 1) and put
one fixing in the centre to hold the 'L' flashing. Fix the corners
through the channels and one more between the corner and
the centre fixing. Perform the same at the other end.
Use five fixings in each 'L' flashing.
GALVO TIP
Put extra fixings in for
high wind areas, particularly
on the underside.
YOU WILL NEED
2 x 1830mm for the roof
2 x 1515mm 'U' channels for the roof
2 x 1830mm 'L' flashings
D
F
K
YOU WILL NEED
2 x 1830mm sheets
2 x 1515mm 'U' channels
C
F
F
F
C
F
F
K
K
D

If you choose to vary from these instructions your warranty will be impaired
6
5
STEP 6 END WALLS
Cap 1 sheet Ewith G1485mm channels.
Fix the channels at the corners and every 2nd rib in between.
Make sure you put at least two fixings up through the underside
of the channel into the pan of the sheet.
Perform the same again for the other end.
STEP 7 DOOR BRACES
The door braces can be fitted now or after you have assembled your shed.
Tuck one end of the 'Z' between the bottom channel of the inside of the
door and the sheet. Do the same at the top, overlapping in the centre
behind the padbolt.
If you have a locking 'T' handle you will have to run the 'Z's the opposite
way to the diagram.
Rivet the 'Z's at the ends, and in the centre of the channel it is tucked
under, and through the overlap in the centre. Two or three more fixings will
be required through the door sheeting into the 'Z', but they will need to be
riveted through from the outside of the door for a neater appearance.
You may need to cut or bend the flange at the bottom and the top of the
'Z' if it catches on the door jamb when opening or closing (diagram 1).
AFTER
DIAGRAM 1
BEFORE
YOU WILL NEED
4 x 1980-1830mm sloping sheets
(2 left, 2 right)
4 x 1485mm channels for end walls
(2 per side)
E
G
YOU WILL NEED
2 x 'Z' Door braces
Fixings
O
N
E
E
G
G
CHANNELS
Channels will end 15-20mm
short at tops of end walls
and 10-15mm at bottoms.
ABOVE
Z door braces in position on
the inside of door sheet

If you choose to vary from these instructions your warranty will be impaired 7
STEP 8 INSTALLATION
SIDE WALL ASSEMBLY
• Stand up the back wall and as your helping hand is holding it up, bring the left end wall
in to meet it at the left corner (diagram 1) overlapping the corners (diagram 2). Drill and fix
at approximately 100mm down from the top and up from the bottom, drilling and fixing
from the outside.
• Bring the right end wall into the right back corner and perform the same again
checking to make sure the walls are sitting flat at the bottom.
• Bring the front wall into place and join the front corners to the end walls, same as
the back (diagram 3).
• Finish joining the corners by fixing at approximately 200-300mm apart. You will find it
easier to drill these corners if they are supported on the inside (see tip).
FIXING THE ROOF
• With a person at each end of the roof, lift it over the top of your upright walls and
lower down on top with an overhang that looks best to you (diagram 4). At the left end fix
through the 'L' flashing into the top channel of the left end wall. Measure the overhang at
the back and fix the right end 'L' to the right end wall with the same overhang as the left
end. If it is difficult to get the same overhang at each end, this
will be caused by an unlevel site or walls that are not square. Adjust accordingly.
Fix the 'L's at 300mm apart.
• Using the ladder and the tape measure, fix down through the top of the roof,
through the pan into the top channel of the front and the back walls (10mm more
than the overhang). Fix beside every second rib. You will not need to worry about
these fixings leaking as any water seeping through these fixings will end up on the outside
of the walls.
FIT THE DOOR BRACES AND INSTALL SHED
• Fit the door braces, if not already done so. Check that all filings/swarf is removed.
• Important: Fix your shed down to its foundations. If your foundations are unlevel or bowed,
you will have problems with your padbolt and door levels. This can be fixed by slipping
a spade under either door jamb and lifting. You will soon get a feel for which side needs
propping up.
IMPORTANT
• Do not attempt to assemble panels in rain or windy conditions.
• Make sure your foundations are squared and level before erecting panels.
• It is easier to remove all swarf (filings) before you stand your walls up.
• Complete all panels before erecting your shed.
• Keep a firm grip on panels when handling. If they slip they will cause damage.
• Always wear non-slip gloves, protective footwear and eyewear.
YOUR SHED'S FLOOR
• It is essential that every shed has a floor, but the only way to make sure
your shed is there to stay on windy sites is with a recessed concrete floor.
GALVO TIP
Use the handle end of a hammer in the inside of
the corner, but beware of drilling holes on the
end of your hammer!
DIAGRAM 3
DIAGRAM 4
DIAGRAM 2
DIAGRAM 1
BUILDING YOUR SHED
The basic task is to join the sheets
together to form your panels, and fix
channels to the top and bottom of
these panels.
They will then join together to form
your shed (diagram 1, 2, 3 and 4).
L FLASHING
Rivet through the side of the 'L'
flashing to secure the roof to the
side of the shed.

If you choose to vary from these instructions your warranty will be impaired
8
KITSET WOODEN FLOORS
Every shed must have a floor. These are available from your local reseller or contact [email protected]
FLAT FLOOR CLAMPS
For existing concrete only. Water can
seep underneath.
INTERNAL DIMENSIONS
GVO 1515
1485MM X 1485MM
SHED
PEG THE FLOOR TO THE GROUND IN A WINDY AREA
RUNNER
FLOOR BOARD
WARRANTY
Thank you for purchasing a GALVO shed. We offer you a 15 Year warranty for Classic range and 18 Year warranty on the GALVO Premium range. The warranty is very simple - “if any part or component of your shed fails, we will send you a new part or component”. Your GALVO shed
will require very little maintenance unless it is situated near the sea/ocean or any other harsh environments e.g. sulphur, etc* If your GALVO shed is situated near the sea or harsh environments we suggest you wash the shed regularly (every 3 months or less) to prolong the life of
your shed. However the warranty that we offer will be overridden by the warranty/guarantee offered by the original manufacturer of the steel.
The conditions listed below apply and are applicable to the 15 and 18 year warranties:
(a) the warranty shall not cover any defect or damage which may be caused or partly caused by or arise through: (i) failure on the part of the Customer to properly maintain any Goods; or (ii) failure on the part of the Customer to follow any instructions or guidelines provided by
the Supplier; or (iii) any use of any Goods otherwise than for any application specified on a quote or order form; or (iv) the continued use of any Goods after any defect becomes apparent or would have become apparent to a reasonably prudent operator or user; or (v) the storage
of caustic materials (including but not limited to acids, fertilisers or hazardous chemicals); or (vi) Fair wear and tear, any accident or act of God. (including weather) (b) The warranty shall cease and the Supplier shall thereafter in no circumstances be liable under the terms of
the warranty if the workmanship is repaired, altered or overhauled without the Supplier’s consent. (c) in respect of all claims the Supplier shall not be liable to compensate the Customer for any delay in either replacing or remedying the workmanship or in properly assessing the
Customer’s claim. (d) Your shed must be raised above ground level (of natural earth substrate) by at least 70mm.
For Goods not manufactured by the Supplier, the warranty shall be the current warranty provided by the manufacturer of the Goods. The Supplier shall not be bound by nor be responsible for any term, condition, representation or warranty other than that which is given by the
manufacturer of the Goods. Where the Supplier is required to perform labour associated with the replacement or repair of defective Goods under manufacturer’s warranty, the labour performed shall be charged at the Supplier’s hourly rate. We wish you many years of trouble free
storage of your valuable assets and we would be only too happy to assist with any questions you may have. Email to [email protected]
The team at Storetech Industries Ltd, suppliers of GALVO sheds.
*The GALVO Classic range is not covered by warranty within 2 kms of the sea or if it’s situated in thermal regions, but is priced accordingly.
RECESSED FLOOR
CLAMPS
For poured floors with a recess
around the perimeter.
BOXING DIAGRAM 20MM - 25MM
(1 ' X 1 ')
INTERNAL DIMENSIONS
SHED
RECESS
20MM - 25MM
8MM BOLT SET INTO CONCRETE
100MM
25MM
25MM
APPROX
APPROX 25MM RECESS
AROUND THE OUTSIDE
25MM
1485MM
INTERNAL
MEASUREMENT
1485MM
STEP 9 COMPLETE YOUR SHED
RECESSED CONCRETE FLOOR PLAN FOR SPECIALLY
POURED CONCRETE FLOORS: SPECIFICATIONS
Every shed must have some type of foundation between it and the ground. You can pour a concrete floor and use recessed floor
clamps, use an existing concrete base with flat floor clamps or purchase a kitset wooden floor from your nearest reseller.
Table of contents
Other Galvo Shed Outdoor Storage manuals

Galvo Shed
Galvo Shed GVO 1508 User manual

Galvo Shed
Galvo Shed GVO3030 User manual

Galvo Shed
Galvo Shed GVO2315 User manual

Galvo Shed
Galvo Shed GVO 2315 User manual

Galvo Shed
Galvo Shed GVO 3023 User manual

Galvo Shed
Galvo Shed GVO3023 User manual

Galvo Shed
Galvo Shed GVO 3030 User manual

Galvo Shed
Galvo Shed GVO1508 User manual
Popular Outdoor Storage manuals by other brands

LIVING AND HOME
LIVING AND HOME 0735940285711 user guide

USP
USP DURAMAX 10 Ft x 8 Ft StoreMax Plus owner's manual

rollaway container
rollaway container ARPCA24 manual

Duratuf
Duratuf GL105 Assembly instructions

Viking
Viking SD5300SS Use & installation guide

USP
USP DURAMAX Apex Pro 10.5 Ft x 8 Ft 40116 owner's manual