STEP 1 – DISPLAY
1. Insert and twist clockwise to clip the 2 pinned (EU) or 3 pinned
(UK) plug to your power supply and connect it to your display.
Your display will turn on automacally when you plug it
into the mains supply.
2. Whenever the display is turned ON, you will see the ‘set
clock’ screen.
3. Use the le and right buons on the front of the display to
adjust the me and date – then press the middle (set) buon
when you have finished.
STEP 2 – TRANSMITTER
1. Open the transmier unit by pressing the buon, and pulling the
outer cover away from the boom.
2. Remove the baery tab from the transmier.
3. The red light will flash to show that the unit is working.
4. On the display, the will light to show that it is talking to the
transmier. If the on the display is flashing please refer to the
online user manual.
1
2
3
For a LED sensor:
1. Find the pulse output on your meter.
2. Sck the square velcro around the pulse output on the meter.
3. Place the LED sensor over the square velcro on the meter
ensuring that the GEO logo is facing you.
4. Insert the other end of the LED cable in to the socket in the
boom of the transmier and ensure it is fully inserted.
5. Check the imp/kWh value on your meter, configure this on your
display. Refer to the user manual for futher informaon.
EENE-A-QSG_D_9
3
LL
STEP 3 – SENSORS
For a single phase pack: (one mains sensor)
1. At your electricity meter, clip the sensor around the mains
live cable (please refer to the online user manual for examples of
live cables on the meter). You should hear a ‘click’ to indicate the
sensor has been ghtly closed.
2. Insert the other end of the sensor cable in to the socket in the
boom of the transmier and ensure it is fully inserted.
The display will now start to show the energy you are consuming.
For a three phase pack: (three mains sensors)
1. At your electricity meter, clip the sensors around the mains live
cables (aach one sensor per cable, please refer to the online user
manual for examples of live cables on the meter). You should hear a
‘click’ to indicate that the sensors have been securely fastened.
2. Insert the other end of the cable in to the socket in the
boom of the transmier and ensure it is fully inserted.
Your display will now start to show the energy you are consuming.
1
21
1234
2
L1 L1 L2 L2 L3 L3
12
For any help please visit our online user manual at: www.greenenergyopons.co.uk/ensemble-colour
Pulse output
(Imp/kWh)
SAFETY FIRST
Your safety is very important to us. Please read the following
guidelines before installaon.
Sensors
Do not install the sensor if:
• There is not enough cable for the clip to connect correctly.
• The cable is too wide for the sensor (do not force the sensor).
• The cables appear perished (cracked, burned, bare copper is
visible), loose or wet.
• You have any doubts about the condion of the cables/meter.
Display
• Follow all manufacturers guidelines when installing your display.
• Keep your display away from water/liquids.
• Always disconnect before cleaning (clean with a so, dry
cloth only).
• Contact your supplier if any of the components appear
damaged/faulty.