3 INSTALLATION
3.1 GENERAL
This section gives details of the installation process for the Grant
External Volumiser with backup immersion heater.
These installation instructions must be read in conjunction with
the Grant Aerona³ air source heat pump installation instructions
(provided with the heat pump).
Before starting any installation work on the Grant Aerona³ air
source heat pump and external volumiser, please read the
Health and Safety information given in Section 14 of the Aerona³
Installation Instructions.
3.2 REGULATIONS AND STANDARDS
The installation of the Grant Aerona³ air source heat pump and
the External Volumiser must be in accordance with the following
recommendations, as applicable:
• Building Regulations for England and Wales, and Building
Standards for Scotland
• Local Bylaws (check with the Local Authority for the area)
• Water Supply (Water Fittings) Regulations 1999
• MCS Installer Standards (if applying for the Renewable Heat
Incentive)
• MIS3005 Requirements for contractors undertaking the
supply, design, installation, set to work, commissioning
and handover of microgeneration heat pump systems.
• MCS020 MCS Planning Standard
The installation should also be in accordance with the latest
edition of the following standards and Codes of Practice:
• BS7671 and amendments
• BS EN 12831
3.3 LOCATION
Refer to the Grant Aerona³ air source heat pump installation
instructions (provided with the heat pump) for the details and
requirements on the location of the heat pump and the clearances
required.
3.4 CLEARANCES
With the external volumiser mounting brackets tted into heat
pump AV mounts (as described in Section 3.6) there will be a gap
of approximately 100mm between the back of the heat pump and
the front face of the external volumiser.
If the rear face of the volumiser is 50mm from the wall, this will
leave a distance of approximately 400mm between the wall and
the back of the heat pump.
3.5 UNPACKING
The Grant External Volumiser is supplied in a cardboard carton.
Please note that this is a two-man lift.
To remove it from this carton for installation, use the following
procedure:
• Lay a clean dust sheet, or similar on the ground to prevent
scratching the casing.
• Place the carton on the dust sheet taped joint uppermost.
• Cut the along taped joint and open the two aps of the
cardboard carton.
• Carefully tilt the carton over so the volumiser is resting on the
dust sheet.
• Lift the carton up and o the volumiser
! NOTE !
Take care if cutting the tape with a knife not to damage the
volumiser casing immediately beneath.
3.6 INSTALLATION PROCEDURE
! NOTE !
These instructions apply when using the 600mm long
Grant anti-vibration mounts (AV mounts) only - Grant
product code: HPIDFOOT/KIT2.
1. Fit the volumiser mounting brackets to the AV mounts, as
follows:
• Identify the correct end of the mounting bracket to t into
the AV mount – see Figure 3-1.
• Insert this end of the mounting bracket into the metal
channel of the AV mount as far as it will go – i.e., until it
reaches the stop on the bracket. See Figure 3-2.
• Repeat with the second bracket and AV mount.
Figure 3-1: Mounting bracket
Step in bracket top edge
Figure 3-2: Fitting mounting bracket
2. Position the AV mounts in the required location, allowing for
the fact that the heat pump will be positioned at the front end
of the mounts.
If the backup immersion heater tted to the Grant External
Volumiser is to be used; remove the two semi-pierced
knockouts on the front face of the volumiser casing and t the
two cable glands supplied with the unit. Refer to Figure 3-3.
Semi-pierced knockouts
Figure 3-3: Semi-pierced knockouts in front face of volumiser