GVA LIRA User manual

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 1 / 8
TM
LIR A

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 2 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
WARNING CAUTION
Do not attempt to install or use Luminaire(s) until you have read and
understand this guide and safety labels.
Luminaire(s) must be installed by a qualified professional in
accordance with all national and local electrical and construction
codes and regulations.
Ensure that main power supply is OFF before installing or wiring
luminaire(s).
Do not exceed specified voltage and current input.
Do not use luminaire(s) with a damaged lens, body, or cable.
Not heeding cautions may result in a hazardous situation which can
cause equipment and property damage, personal injury, or death.
Do not exceed the specified voltage and current input.
Do not exceed the maximum number of specified fixtures in a light
run. Doing so will result in a current overload.
GVA Luminaires have no serviceable parts. Do not attempt to open
the units.
Do not hot swap! Ensure power supply is off before connecting or
disconnecting fixtures.
Do not stare into beam or view directly with optical instruments.
Unauthorized feild repairs will void warranty.
1. MOUNTING BRACKET
INSTALLATION
WARNING Use mounting hardware suitable for the mounting surface. Use of innappropriate hardware may result in dismounting of
the bracket and can result in equipment damage, personal injury, or death.
Install mounting bracket in desired location using either one or two M6 (OR 1/4in) bolts or screws suitable for the mounting surface. See
"MOUNTING HOLE TEMPLATE" to mark holes prior to installation, if necessary.
29.2mm
(1.15in)
24mm
(0.94in)
3 x
6.8mm
(.27in)
MOUNTING HOLE
TEMPLATE
(1:1 SCALE)
IF USING
MOUNTING SURFACE:
IF USING
LANDSCAPE SPIKE:
M6 (OR 1/4in)
BOLT OR SCREW
(supplied by others; 1 in the
center or 1 per slot)
LIRA
BRACKET
REQUIRED HARDWARE:
M6 OR 1/4IN
BOLT OR SCREW
(not supplied)
2X
OR
1X
LIRA
BRACKET
LIRA LANDSCAPE
SPIKE
THUMB
SCREW

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 3 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
3. LUMINAIRE INSTALLATION
(WITH LIRA VISOR)
Using the provided hardware, install the LIRA luminaire as shown. If installing the LIRA visor, do so in conjunction with the luminaire installation
as shown.
Diagram 3.A. Luminaire with Visor
M6 DISCLOCK
WASHER
M6X1X10MM
SCREW
LIRA VISOR
OR LIRA SNOOT
(optional)
M6 DISCLOCK WASHER
(supplied)
2
X
M6X1X10MM SCREW
(supplied)
2X
REQUIRED HARDWARE:
Diagram 3.B. Luminaire without Visor
M6 DISCLOCK
WASHER
M6X1X8MM
SCREW
M6 DISCLOCK WASHER
(supplied)
2
X
M6X1X8MM SCREW
(supplied)
2X
REQUIRED HARDWARE:
2. LIRA SNOOT
INSTALLATION
Using the provided hardware, install LIRA snoot to luminaire as shown. If not installing LIRA snoot skip to Step 3.
NOTE: This is a custom configuration. Please contact factory for details.
REQUIRED HARDWARE:
M3x0.5x5MM
FLATHEAD SCREW
(supplied)
4X
4 X M3 SCREW
NOTE: APPLY
LOCTITE 271
(not supplied)
PRIOR TO INSTALL
NOTE: TORQUE
SCREWS TO 1NM
LIRA GEN.2
OPTICAL ACCESSORY
(optional)

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 4 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
4. WIRING DIAGRAM:
OVERALL SYSTEM DIAGRAM
WARNING Ensure power supply is turned OFF before making any connections. Connecting the luminaire while the power is turned
ON may result in equipment damage.
Make connections to junction boxes (supplied by others) and to the luminaires.
NOTE: LIRA luminaire 12 or 24VDC power conductors should be connected in parallel. DMX Common to be also connected in parallel.
NOTE: DMX I/O must be connected in series.
NOTE: Total load shall not exceed power rating of PDB-ELV/PS-ELV and should be under 100W to remain Class 2.
NOTE: Follow labels & markings on terminal blocks & cables for correct polarity.
TYPICAL SYSTEM DIAGRAM:
NOTE: Luminaire configuration and length of leader cables and jumper cables directly affects the maximum number of luminaires allowed in a single run.
JUNCTION BOX
(supplied by others)
LIRA LUMINAIRE(S)
DMX INPUT CABLE
(supplied by others)
(for DMX luminaire only)
DATA OUTPUT CABLE
(optional, supplied by others)
(for DMX luminaires only)
AC OUTPUT CABLE
(optional, supplied by others)
7C POWER & DMX CABLE
(or 2C power cable & 5C DMX cable)
(for DMX luminaires)
OR 2C POWER CABLE
(for non-dimming luminaires)
7C POWER & DMX CABLE
(or 2C power cable & 5C DMX cable)
(for DMX luminaires)
OR 2C POWER CABLE
(for non-dimming luminaires)
7C POWER & DMX CABLE
(or 2C power cable & 5C DMX cable)
(for DMX luminaires)
OR 2C POWER CABLE
(for non-dimming luminaires)
DAISY CHAIN SYSTEM
LEADER
CABLE
FIRST
JUNCTION BOX
(supplied by others)
LAST
JUNCTION BOX
(supplied by others)
LEADER
CABLE
LEADER
CABLE
LIRA LUMINAIRE LIRA LUMINAIRE
JUNCTION BOX
(supplied by others)
AC INPUT
LINE
VOLTAGE PDB-ELV or PS-ELV
RADIAL SYSTEM

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 5 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
5. WIRING DIAGRAM:
PDB/PS-ELV
WARNING Ensure that line power is disconnected before making connections to PDB/PS-ELV.
For LIRA DMX luminaires refer to Diagram 5.A. for PDB-ELV connections. For LIRA non-dimming luminaires, refer to Diagram 5.B. for PS-ELV
connections.
Diagram 5.A. PDB-ELV Wiring Diagram
AC OUTPUT
120~277VAC
(optional)
AC INPUT
120~277VAC
DMX INPUT
DMX OUTPUT
(optional)
VDC & DMX OUTPUT
(to DMX luminaires
or junction box)
VDC OUTPUT
TERMINAL
DMX I/O
TERMINAL
POWER
SUPPLY
THIS WAY UP
WHEN MOUNTING ON
VERTICAL SURFACES
OPTION A
(if connecting
multiple PDBs)
OPTION B
(if connecting only one PDB
or last in line of PDBs)
120 OHM
RESISTOR
DMX
OUTPUT
(from DMX
luminaires or
junction box)
DMX
OUTPUT
(from DMX
luminaires or
junction box)
DMX
OUTPUT
(to next PDB;
becomes
DMX input)
NOTE: Terminate return DMX output (+) and (-) with 120 OHM resistor.
Diagram 5.B. PS-ELV Wiring Diagram
AC OUTPUT
120~277VAC
(optional)
AC INPUT
120~277VAC
VDC & DMX OUTPUT
(to non-dimming
luminaires or junction box)
VDC OUTPUT
TERMINAL
POWER
SUPPLY
THIS WAY UP
WHEN MOUNTING ON
VERTICAL SURFACES

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 6 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
6. WIRING DIAGRAM:
JUNCTIONS BOXES
WARNING Ensure power supply is turned OFF before making any connections. Connecting the luminaire while the power is turned
ON may result in equipment damage.
Diagram 6.A. Junction Box Wiring Diagram: Daisy Chain
NOTE: Diagram shows 2C power cable & 5C DMX cable option, for non-dimming luminaires make only 2C ((+)-red, (-)-black) connections.
Diagram 6.B. Junction Box Wiring Diagram: Radial
NOTE: Diagram shows 2C power cable & 5C DMX cable option,
for non-dimming luminaires make only 2C ((+)-red, (-)-black) connection
TO NEXT LIRA OR
JUNCTION BOX
FROM PDB-ELV
TO LUMINAIRE
TO LUMINAIRE
TO LUMINAIRE
TO LUMINAIRE
FROM PDB-ELV
FROM PDB-ELV
FROM PDB-ELV
FROM PDB-ELV
TO NEXT LIRA OR
JUNCTION BOX
FIRST
JUNCTION BOX
(supplied by others)
LAST
JUNCTION BOX
(supplied by others)
TO LUMINAIRE
TO LUMINAIRE

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 7 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
7. WIRING DIAGRAM:
LUMINAIRES
WARNING Ensure power supply is turned OFF before making any connections. Connecting the luminaire while the power is turned
ON may result in equipment damage.
Connect Class 2, 12~24VDC output to power conductors of LIRA luminaire : red(+), black(-). Connect DMX I/O to DMX conductors of LIRA
DMX luminaire (output optional).
NOTE: LIRA Luminaires require 12VDC or 24VDC Class 2 or limited to 25A Power Supply with Class 2 outputs. If PSU is other than Class 2,
provisions must be made to create Class 2 outputs.
Diagram 7.A. LIRA DMX Luminaire
INPUT/OUTPUT
RED = +12 or 24VDC
BLACK = -12 or 24VDC
ORANGE = DMX (-) INPUT
ORANGE/WHITE = DMX (+) INPUT
BLUE = DMX (-) OUTPUT
BLUE/WHITE = DMX (+) OUTPUT
BROWN/WHITE = DMX COMMON
Diagram 7.B. LIRA Non-Dimming Luminaire
INPUT/OUTPUT
RED = +12 or 24VDC
BLACK = -12 or 24VDC

Architectural Spot and Flood Light INSTALLATION GUIDE
GVA Lighting, Inc. 3400 Ridgeway Drive, #14 Missisauga, Ontario L5L 0A2
IG, LIRA, 18-05-17 | Page 8 / 8
Specifications are subject to change without notice. Every effort has been made to ensure that the information provided in this manual is accurate.
GVA Lighting Inc. is not responsible for printing or clerical errors. Refer to www.gvalighting.com for additional information.
LIR A™
NOTES
Other manuals for LIRA
3
Table of contents
Other GVA Floodlight manuals
Popular Floodlight manuals by other brands

Silicon Solar
Silicon Solar SecurePal 96 LED Operation & installation instructions

Home Zone Security
Home Zone Security AEC-5340 quick start guide

Emos
Emos 1531271031 manual

DMK
DMK SEITO G Installation and operating instructions

JB Systems
JB Systems Apollo DMX Operation manual

Regent
Regent CSMV80W instruction manual