LOCATION
Choose a location for your water heater centralized to the piping system. You must also locate the Super Stor Contender where it will not be
exposed to freezing temperatures. Additionally, you will need to place the water heater so that the controls, drain, and inlet/outlets are easily
accessed. This appliance must not be installed outdoors, as it is certified as an indoor appliance, and must be kept vertical and on a level
surface. [IMPORTANT CAUTION: Care must be exercised when choosing the location of this appliance, where leakage from the relief
valve, leakage from the related piping, or leakage from the tank or connections, will not result in damage to the surrounding areas, or to the
lower floors of the building.] A water heater should always be located in an area with a floor drain or installed in a drain pan suitable for
water heaters. Under no circumstances, shall Heat Transfer Products Inc. be held liable for any such water damage whatsoever. This
water heater must not be located near flammable liquids such as Gasoline, Adhesives, Solvents, Paint Thinners, Butane. Liauefied
Propane, etc.i as the controls of this appliance could iqnite those vapors causlnq an explosion.
OPERATING YOUR SUPER STOR CONTENDER
Boiler high limit should be at least 20°higher than the Super Stor Contender temperature. Set the low limit of the boiler control at the
minimum setting - this will call the burner on, only to satisfy the tank control.
We recommend a temperature setting of 119°F, or in accordance with local and state codes for normal operation. The differential is fixed
at 3°-5 °. You may prefer a setting of either higher or lower temperature, to satisfy your needs. A mixing valve in conjunction with a high
temperature setting may be used for high demand applications (spas, hot tubs, whirlpools)
NOTE: RISK OF SCALD INJURY INCREASES AS YOU INCREASE WATER TEMPERATURE! IF
DRAINING OF THE SUPER STOR CONTENDER IS NECESSARY, OPEN THE T & P VALVE
OR A HOT WATER TAP, TO PREVENT VACUUM BUILD UP IN THE TANK AND PIPING.
PLUMBING
It is mandatory that all plumbing isdone is accordance with all local and state plumbing codes, or warranty will be voided. It is also
necessary on all mechanical connections, that you use beth thread tape and pipe dope.
NOTE: WHEN FILLING THE SUPER STOR CONTENDER, MAKE SURE THAT YOU OPEN THE HOT
WATER TAP TO RELEASE THE AIR IN THE TANK AND PIPING.
BOILER CONNECTION,'
Use a1" nominal minimum tube size, where you are using zone valves or cimulators; where a 1" zone valve and 1" tube is required.
On the tank, the boiler supply is to be connected to the outlet of the circulator. The inlet of the circulator is to be connected to the "HOT
OUTLET" side of the boiler. Be sure that the arrow on the circulator is facing toward the flow direction, (See pressure drop sizing for
circulator, page 5). On the tank, the boiler return is to be connected to the return side of the boiler. The return(s) from heating loop(s)
should have a flow check or swing check valve installed before the return pipe from the tank.
In a steam boiler, the tank supply must be connected to the boiler, well below the minimum water level. A strainer and a drain valve should
be installed at the boiler for periodic draining of scale and sludge. Banging and steam bound traps will occur if the boiler water supplied to
the heat exchanger has steam, or is slightly above low water cut-out.
COLD WATER INLET
Use both thread tape and pipe dope and connect a NPT male X3_. (minimum) tube adapter. [IMPORTANT CAUTION: Dielectric fittings
must be used.] A shut off valve between city water supply and tank inlet is recommended for ease of service at a later date. [IMPORTANT
CAUTION: Exercise extreme caution when soldering, due to the plastic dip tube on beth the hot water outlet and cold water inlet.] It may be
recommended to use a back flow preventor- check your local codes. If a back flow preventor, or a no return valve is used; a thermal
expansion tank must be installed on the cold water supply, between the tank and valve. If the tank is replacing a tankless coil in the boiler,
disconnect coil plumbing and use the cold inlet pipe and hot water outlet pipes for the Super Stor Contender tank. DO NOT PLUG TUBE
OUTLET IN TANKLESS COIL.
LP-65 PAGE: 3 REV.: 6/1/01