Installation Requirements
All unit installations must be in accordance with the National Fuel Gas Code ANSI Z223.1 (NFPA 54) in the United
States and Can/CGA-B149 Installation Code in Canada, and all other applicable local codes and ordinances. These
requirements include but are not limited to:
Combustion air supply to the heating equipment
Venting of the products of combustion (flue gases)
Gas supply, piping and connections
Unit Location and clearances
All electrical equipment must be grounded and wired be in accordance with the National Electric Code (ANSI/NFPA
70) in the United States, and the Canadian Electric Code (CSA C22.1), in Canada. The installer / equipment
manufacturer is responsible for final compliance with these requirements.
FM Requirements
1. FM requires that all units must be listed by a Nationally Recognized Testing Laboratory (NRTL). The HD
Series heaters are listed by ETL / Intertek an NRTL.
2. The High Limit must be located in a circuit that does not exceed 120 VAC. Limits are all located in 24 VAC
circuit.
IRI / GE CAPS Requirements
1. All input sizes require 100% shut-off. Units are equipped with a 100% safety shut-off control that will lockout
on ignition failure.
2. Units must use controls that are UL or CSA listed. All our controls comply
3. Models with inputs of 150,000 to 400,000 Btuh require “mechanical exhaust” and a safety interlock. All HD
Series heaters are power vented and employ an air pressure switch on the combustion air blower.
The requirement for an FM or IRI gas train applies only to individual units having an input in excess of 400,000 Btuh.
The individual duct furnaces provided in this assembly are 400,000 Btuh or less and are individually controlled by
their own safety shut-off control.
Combustion Air Openings
Openings for ambient combustion air must be provided in a panel or door with direct access to the vestibule
area where the burners and combustion air fan assembly are located. Air opening(s) must be sized to
provide a suitable supply of combustion air for to the burner compartment and have a minimum free area of
1 sq. in. (625mm2) per 4,000 Btuh (2,345 W) of rated total input. The minimum dimension of any air opening
must be at least 3 inches.
Indoor combustion air supply is acceptable provided that sufficient air exchange is provided from outside to the space
containing the rack assembly. Ducted air supply may be required for installations in a mechanical room or space. Air
supply to the duct furnace must be free from any corrosive vapors.
Airflow Proving Switch
Provide an air flow proving switch interlocked with the system heat enable, to insure circulating airflow over
the heat exchangers, prior to initiating ignition of heater(s). The duct furnaces are equipped with individual fixed
temperature high limit switches, which are of the auto recycle type and will turn-off the gas to the heaters when
maximum temperature is reached. However, the heaters will cycle back on when the temperature in the duct or
cabinet drops. In high heat applications, this cycling can lead to panel warpage and possible air leakage, heat
damage to components and wiring and create a possible fire hazard. The air flow proving switch prevents a call for
heat to the heater controls when lack of airflow could result in a cycling heater condition.
Auxiliary Limit Switch
For additional safety in the event of low airflow conditions due to filter blockage, coil blockage and or damper failure,
a manual reset auxiliary limit is required, mounted downstream of the rack assembly to sense elevated duct
temperatures.