HobbyGrower Enthusiast6"x8" User manual

ASSEMBLY INSTRUCTIONS
Overall dimensions including base:
247.4 L x 193 W x 210 H cms
97.5" L x 76" W x 82.7" H
ASSEMBLY INSTRUCTIONS
(Internal Dimensions)
Please read these instructions carefully before you start to assemble this greenhouse. To save time and
ensure proper assembly, follow the step-by-step instructions carefully in order. Assembly is easiest when
at least two people are present. Keep these instructions in a safe place for future reference.
An updated and/or improved version of this assembly guide may be available for download from the
HobbyGrower web site. Also, if you would like to view a brief general assembly video to gain a basic
understanding of how the structure is constructed, visit
http://www.hobbygrower.com, then click on the Assembly tab.
IMPORTANT!!!
Ent Spec Edition Ltr v2-0-4

TOOLS & EQUIPMENT REQUIRED
SAFETY ADVICE
GENERAL ADVICE
CARE & MAINTENANCE
1See next page for complete list of parts
•Do not attempt to assemble the greenhouse in
windy or wet conditions.
•Take special care not to touch overhead power
cables with aluminum profiles.
•Ensure that there are no buried pipes or cable in
the ground before inserting the ground stakes.
•Always wear shoes and saftey goggles during
assembly.
•We strongly recommend the use of work glove
during assembly as aluminum profiles may have
sharp edges.
•Dispose of plastic bags and protective poly film
covers safely - keep them out of reach of small
children.
•The greenhouse must be positioned and anchored
on a flat, level surface.
•Do not lean on or push against the greenhouse
during construction.
•Keep children away from assembly area - the
aluminum profiles may have sharp edges.
•Do not position your greenhouse in an area
exposed to heavy wind.
•Do not attempt to assemble the greenhouse if
your are tired, have taken drugs or alcohol or if
you are prone to dizzy spells.
•If you use a step ladder, carefully follow the
manufacturer's instructions.
•Hot items such as recently used grills,
blowtorches, etc. must not be stored in the
greenhouse.
•Before beginning the assembly process, confirm
that all necessary parts have been included in the
package. It is advisable to lay the parts out in an
orderly fashion according to the part numbers so
that parts can be easily identified during the
assembly process. If parts are missing, contact
SPS International at (800) 994-5626.
•This is a multi-part assembly. Allow at least 4 hours
to assemble from start to finish. Do not begin
assembly if heavy winds or rains are expected
within 10 hours.
•Choose a sunny level location for your greenhouse,
away from overhanging trees.
•You can opt to use the base brackets supplied to
anchor your greenhouse to a concrete floor, or you
can use the base supplied base kit (see steps 36
through 38). If you intend to anchor your
greenhouse directly to concrete, you must
purchase separately concrete anchor screws for
use with part number 24 anchor brackets. The area
required for the greenhouse including anchor
brackets is 104.5" (266cm) length x 83" (212cm)
width.
•It is advisable to use lubricant to ease the
connection between aluminum profiles and panel
(a mild soap and water solution is useful for this).
•Note that the door is permanently hinged on the right
hand side and therefore opens out and to the right.
•We strongly advise that you keep the special poly-
film protective covers on the side panels and the
first row of roof panels until that greenhouse is fully
assembled. You should however remove the poly-
film prior to installing the very top roof panels.
•Keep roof clear of snow and leaves.
•Use mild soap and water and a soft cloth to wash
greenhouse glazing panels. Rinse with cold water.
•Do not use acetone, abrassive cleaners or
sponges, or other amonia-based cleaners to clean
the clear panels.
•Some chemicals and cleaners can be agressive to
the clear panels, which are made of polycarbonate.
For a complete list of chemical compatibility, visit:
http://www.spscorp.com/compatibility
•To purchase replacement parts, contact customer
service at SPS International at (800) 994-5626, or
•100% "Silicone" Sealant
(compatible w/polycarbonate)
•Tape measure
•Work gloves
•Plastic or rubber mallet
•Crosshead Screwdriver
(a.ka. "Philips")
•Lubricant (mild soap & water
solution works well)
•Scissors
•Step ladder
•Level
•Large Hammer (for anchor stakes)
•5/64" Drill bit
(or similar diameter nail)

2
1
2
3
4
5
6
8
9
ITEM QTY.
CONTENTS
ITEM QTY. ITEM QTY.
27
1
2
15mm (0.59") 10
2
3
2
2
Door
handle hole
23 10
10
24 8
1
31
1
32
33
1
5
3
2
4
(Assembly
required; see
steps 24A-C)
600 x 600mm
(23.6" x 23.6")
600 x700 mm
(23.6" x 27.5")
600 x700 mm
(23.6" x 27.5") 13
10
120mm (4.72")
100mm (3.93")
75mm (2.95")
120mm (4.72")
12
13
14
10
4
8
1
2
15 2
550mm (21.6")
17 1
6
6
21
22
10A
10B
10C
16 2
1290mm (50.7")
(Left door frame
and door jam)
(Bottom door jam
alignment bracket)
(Top door jam
alignment bracket)
(Door support)
1290mm (50.7")
550mm (21.6")
Door jam Door frame
(Door handle
assembly. Includes
3/32" allen wrench)
Plastic hinge plate
(Door frame
and door jam
assembly;
joined
together
with plastic
hinge plate)
(Door frame
and door jam
assembly
extension;
joined by
plastic
hinge plate)
(Left door frame
and door jam
extensions)
18 1
2
1190mm (46.8")
1290mm (50.7")
575mm (22.6")
530mm (20.8")
590mm (23.2")
1330mm (52.3")
Door jam Door frame
Plastic hinge plate
12mm (0.47")
11 18
8
590mm (23.2")
920mm (36.2")
1100mm (43.3")
1290mm (50.7")
4
2
19 1
25
26
27
28
29 16mm (.63")
4
4
40
6
4
6
30
797mm
(31.4")
920mm
(36.2")
Note: 1 inch = 25.4 millimeters (mm)
Important! Be sure to inventory and organize parts prior to beginning the assembly process.

3
Length:
Width:
Height:
25
25
26
26
25
26
26
25
25
25
10 cm (3.9")
6
6
1
1
1
1
1
1
4
5
5
1
1
1
1
1
1
1
3
3
3
23
3
3
1
1
1
1
Width:
193 cm (76")
190 cm (75")
Height:
200 cm (78.8")
Length:
247.4 cm (97.5")
245.5 cm (96.7")

2
4
1
3
1
Door
handle
hole
MUST USE
PANEL
2
1
2
2
1
1
2
1
A
B
Plastic hinge
17/1290
*
4
Door
frame
Door
frame Door
hinge
Door
jam
Door
jam
Important: Note
orientation of angle
Fig. A
(viewed from top)
Slide the rectangular panel 2 (must be
the panel with the door handle hole) onto
the profile ensuring it has the interlocking
slot at its bottom.*
Interlocking slot at
bottom of panel 2
Door Assembly
Select profile 17-1290mm.
IMPORTANT: You must ensure that the profile is
oriented right-side up and with the plastic hinge
plates facing out (Fig A).
Slide profile onto a
square panel 1 (door
frame side
of profile).
When necessary use a
lubricant to ease
connection between
aluminium profiles and
panels (mild soap and
water works well for this).
To interlock the two panels, first
pull the top panel back slightly
as shown (A), then push
down fully.
Push the top panel back so it
interlocks and is flush with
the bottom panel.

5
Slide another angled bracket 9 into the other end of the bottom profile 11-590 (A). .
Slide the 16-1290mm profile (B) on to the long side of the door
ensuring the angled bracket slots into the end of it .
IMPORTANT! Do nothing more to the door at this stage.
6
Lay the assembly on the floor and insert an angled bracket 9 only
into the bottom of profile 17-1290mm (A).
Slide a 11-590mm profile onto the top and bottom of
the door assembly (B), ensuring the angled bracket 9
slots into the bottom profile (see close up diagram).
6
5
1
A
B
2
1
2
16/1290
17/1290
11/590
11/590
B
B
9
A
11/590
11/590
9
11/590 9

8
6
7
910
13/1290
Wall Assembly
Stand the door up. On the door jam side,
slide on a square panel 1. It will be
easier if you open the hinge.
Slide on a rectangular panel 3 and
interlock the two panels as shown in
steps 3 and 4.
Slide on a corner profile 13-1290mm but
leave approximately 2" protruding at the
top. The reason for this will become
clear later.
1
2
1
Door
1
2
1
3
1
2
1
3
13/1290
13/1290
11/1290
Door
2
1
3
1
Back
corner
Sides
3
3
3
3
3
1
1
1
1
IMPORTANT! Assemble
STOP HERE!
Proceed to
Step 11.
in this direction.
Leave
2" here
Slide on another two panels and then a profile
11-1290mm, leaving 2" protruding at the top as in
Step 9. Continue until you have gone as far as
shown on the diagram. Use profile 13-1290mm at
the back corner.

11
7
At the door opening finish of the sides by sliding on the vertical
profile 16-1290mm (this is left door jam).
16/1290
Door jam
3
Door
1
12
13
Slide on a vertical profile 14-1330 and fit
another set of two panels (note placement of
vent panel). Fit horizontal profile 14-590 as
shown and slide on a top panel 4.
Slide on another vertical profile 14-1330mm
and carry on around the greenhouse until
you reach the door again.
1
3
1
3
3
1
5
14/590
14/1330
6
1
3
3
4
14/1330
6
6

16
2
18/550
15/550
15/550
10C/120
10C/120
4
10C/120
8
14
15
Door
4
2
11/1100
13
11
11/1290
10A/100
11/920
11/920
11/1290
11/920
11/920
10C/120
10C
Door frame
Note orientation
Note
orientation
View from front, right of door
frame and door jam.
Door jam
Door frame
10A/100
10A/100
Note: You will require the assistance of another person to carry out the next stage of the
assembly. You will be lifting the greenhouse and sliding six bottom rail profiles 11 onto the
bottom panels. There are three different panel length profiles
to use so study the diagram
below closely.
Once all the bottom rail profiles
are fitted, tap down all the
vertical profiles using a rubber
mallet. The vertical profiles 11
should sit on the bottom rail
profiles and the corner profiles
13 sit on the floor or ground.
The front of the greenhouse
does not get a bottom rail at
this time.
Slide the top panel 4 onto
the top of the door assembly.
Slide a Door Frame
Extension 15-550mm profile
onto the top door panel,
ensuring it engages with
the inner metal connector
bar 10C.
The other 15-550
profile will serve as a
Door Jam Extension.
Slide it onto outer
metal connector
bar 10C.
Top of Door
Insert four metal connector bars 10C/120mm into the top of
the door profiles as shown. Slide the Door Frame and Door
Jam Extension Assembly profile 18-550mm onto the
hinged side of the top of the door panel, ensuring that it
slides onto the metal bars 10C.
Door jam

17
3
4
10B/75
10B/75
14
18
4
3
3
3
5L
5R
Slide on the two back
panels 5L and 5R.
10B/75
11/590
5L
4
5R
3
3
3
11/590
11/590
19
9
Note: The shortest
edges of 5L and
5R toward the top.
Back Wall
At the back wall of the
greenhouse insert two
metal connecting bars
10B/75mm into the top
section of profiles 14-1330
as shown.
Slide down profiles
14-530mm both sides of
panel 4 ensuring the
angled end of the profiles
are at the top and that
they follow the same angle
as the panel 18.
Insert two profiles 11-590mm
horizontally to join panels 3
and 5R & 5L together.
Repeat at front of
greenhouse.

Slide four panels 1 on to profiles 12 as shown.
Repeat for other side.
21
1
1
1
1
Roof Assembly
Slide two profiles12-1190mm along the top
long sides of the greenhouse. Insert a
joining bar 10 between
each pair to strengthen
the join.
Panels may need
aligning as
you go.
20
12/1190
10
23
22
10
10
10
12/1190
13/575 11/590
12/1190
From inside the greenhouse and
starting at one end, insert a profile
13-575mm to lock panels 5 and 1
together.
Then insert three 11-590mm
profiles between the roof
panels to lock them together.
Finally, finish off by inserting
another profile 13-575 at the
corner.
Repeat for the other side of the
roof.
Slide on two roof profiles
12-1190 on either side.
You may need a stable
step ladder at this stage.
Insert a joining bar 10
between each pair to
strengthen the joint.

11
24A
24B
24C
AA
B
C
C
6
24
8mm
14mm
8mm and washer
8mm and washer
Note orientation of nipples
Pre-drill holes using a 5/64"
drill bit. Alternatively, you can
simply poke a small starter
hole in the plastic using a nail
or sharp object that is similar
in diameter to the 14mm
screw.

25
1
1
1
6
6
26
11/590
12
Remove the protective
poly film from these
panels before installing.
Dispose of poly film
carefully to keep out of
reach of children. Decide
where you wish to place
the roof vent panel 6.
Slide it in position together
with three panels 1.
Repeat the process on
the other side of the roof
using three panels 1 and
one roof vent panel 6.
Note: At this this point the
panels are unsupported.
This will be corrected in
the next three assembly
steps.
From inside the
greenhouse insert profiles
11-590mm between roof
panels 1 (and 6).
You should complete one
side and then the other.

31
31
11/920
11/920
11/920
31
A
11/920
11/920
B
28
131
27A
13
Door
frame
(shown
open
here)
Door jam
Hinge
32
Door
jam
32
Door
frame
(17-1290 viewed from bottom) (viewed from bottom)
Right
door
jam
Door
frame
Door
frame
(shown
open
here)
DOOR
3
1
27
Angled Slot
A
Fig. A1
(17-1290 viewed from bottom)
Right
door
jam
Left
door
jam
Door
frame Vertical Slot
Fig. B1
Fig. A2
Fig. B2
B
C
Fig. C1
Identify the vertical slot
in the Right Door Jam
(figure B1). Insert the
right side of part
number 31 Bottom Door
Jam Alignment Bracket
into the vertical slot of
the door jam (figure B2).
Insert the left side of
part number 31 into the
vertical slot of the left
door jam (figure C1).
Note: Part
number 31
does not
get inserted
into the Door
Frame.
31
31
(viewed from bottom)
(viewed from bottom)
(viewed from bottom)
31
Slide profile 11-920
from both sides
onto the front
bottom (onto panel
number 1).
Continue to slide it
over onto part 31
until the profiles
butt against each
other at the center
of part number 31.
The Door Jam portion of 17-1290 has a cavity that is designed to accept both part number 32 Door
Support and one side of part number 31 Bottom Door Jam Alignment Bracket (shown in step 26A).
Identify the angled slot in the right door jam (figure A1). Insert part number 32 into the angled slot of
the right door jam (figure A2). Note: Part number 32 does not get inserted into the Door Frame.

14
5
4
5
3
3
33 33
29
33
30
13/575
31 12/1190
10
Insert part number 33 Top Door Jam Alignment Bracket into the
vertical slots of the left and right door jams. Note: part
number 33 does not get inserted into the door frames.
From outside the
greenhouse, insert roof
profiles 13/575 as
shown.
Important! The profile
must slide onto the
outer edge of the roof
panel and part 33 at the
same time.
Important! You will need
someone to assist you
from this point on.
Slide two profiles 12/1190
toward the center of the
roof.
Insert a Joining Bar 10
between them at the
center of the roof to
strengthen the joint.

15
32
3433
Inside
21
21
21
22
B
A
Inside
From the inside of the greenhouse, apply
100% silicone caulk/sealant (compatible
with polycarbonate) to all roof joint holes.
Inject the silicone until it oozes through
the adjacent holes.
Use pairs of roof brackets 21 to clamp
each roof section where shown (A). Fix
brackets in place using part number 22,
12mm nuts and bolts (B). Tighten with
wrench.
OUTSIDE
INSIDE
DOOR
OUTSIDE
INSIDE
DOOR

16
35
Outside
Inside
23
8
36
24
BRACKET
FIXING
POSITIONS
24
24 24
24
24
24
24
OUTSIDE
INSIDE
24
IMPORTANT! This step should only be carried out if you are anchoring your greenhouse to
a concrete surface, otherwise poceed to step 37. Anchor the greenhouse using part number
24 Brackets in the positions shown. Simply slide two brackets under the base profiles on all
four sides and fix to the ground using suitable concrete anchor screws (minimum length 2").
For advise about suitable anchor screws, seek professional help in your
local hardware store.
Attach corner caps 23 in all ten positions (front and back) using
screws 8. You will need someone to help you with this step
(one person inside, another outside). Do not overtighten.

37
25
25
25
25
25
25
27
26
27
27
27
27
27
26
26
26
28
28
28
28
Inside
29
30
CORNER
30
Inside
Base Construction
Joing the base sections
together as shown.
IMPORTANT! Ensure all the
screw holes are facing toward
the inside of the greenhouse
and closer to the top
edge of the
sections.
The
shorter
sections
25 are
used on the
long sides and the
longer sections 26 are
used on the shorter sides.
Fix the sections together using
part number 29, 36mm screws.
You must ensure that the base
is perfectly square and level
before anchoring it to the ground.
With the help of another person,
test the greenhouse on the base
before anchoring it to the
ground.
Once you are satisfied with the
position and squareness of the
base, remove the greenhouse
and anchor the base to the
ground using partnumber 30,
one at each corner. Check for
buried cables and wires first!
38
17
34
BRACKET
FIXING
POSITIONS
Door
24
24
24
24
24
24
Outside
Inside
24
29
Inside
24
Fixing Greenhouse to Base
Carefully reposition the
greenhouse onto the base.
From the inside, fit the brackets
at positions shown at right.
Remove two screws from the
base at these joints first, fit the
brackets and fasten in place
with the screws. Ensure that the
brackets hook over the bottom
rim of the greenhouse.
Remember to remove all
remaining protective poly film
covers from the panels.
Dispose of poly film covers
carefully to keep out of reach
from children.

Product Name
Date of Purchase
Name of Retailer
LIMITED 5 YEAR WARRANTY
SPS International’s renowned reputation for its fine products results from their dedication and
commitment to quality, design and innovation.
The entire range of HobbyGrower® brand horticultural products is manufactured from high quality
materials under rigorous control and supervision. In case a problem should occur, please address your
claim to the customer service department by phone. The warranty commences from date of purchase
and a dated proof of purchase should be presented on request.
SPS continuously tests its products for durability & stability and will replace, at its discretion, any
product or part, which fails due to structural defect or faulty workmanship, or which fails due to
fading of color, for a 5-year period from the initial date of purchase.
Damage caused by: use of force, or incorrect handling, or inappropriate use, neglect, commercial
use or use other than for personal or household purposes, and damages resulting, from alteration,
painting, or assembly not in accordance with the User’s Manual, damages caused as a result of
storage above the capacity load of the product, are excluded from this warranty.
After a claim has been settled the guarantee will continue to run to its original expiry date (from the
original proof of purchase date).
The products are produced from the finest raw materials, which are "clear": non-toxic and
completely recyclable.
Please keep this warranty and your proof of purchase in a safe place as they will be needed
if a claim is made.
H BBYGROWER
HORTICULTURAL PRODUCTS
by SPS International
™
www.hobbygrower.com
4741 Pell Dr., #2, Sacramento, CA 95838
(800) 994-5626 • (916) 564-5051
http://www.spscorp.com
This manual suits for next models
1
Table of contents
Other HobbyGrower Greenhouse Kit manuals