Holzhof XT 400 User manual

XT 400 "Fort Romy"
Structure assembly
instructions
XT 400 "Fort Romy"
Structure assembly
instructions

ASSEMBLY SEQUENCE:
1. STRUTS AND PLATFORMS
2. INCLINED CLIMBING
BOARDS
3. PLANK BRIDGE AND
ROPES
4. PANELS
5. TUBE BRIDGES
6. TUBE SLIDE
7. CLIMBING BOARD AND PE ENTRANCE
8. PE SLIDE
9. ROOFS
10. ACTIVITY PANELS
11. TELESCOPES
12. BENCHES
13. STRUCTURE EMBEDDING OR ANCHORING
7. CLIMBING BOARD AND PE ENTRANCE
8. PE SLIDE
9. ROOFS
10. ACTIVITY PANELS
11. TELESCOPES
12. BENCHES
13. STRUCTURE EMBEDDING OR
ANCHORING
ASSEMBLY SEQUENCE:
1. STRUTS AND PLATFORMS
2. INCLINED CLIMBING BOARDS
3. PLANK BRIDGE AND ROPES
4. PANELS
5. TUBE BRIDGES
6. TUBE SLIDE

safety and loose shockproof area: 98.33 sqm.
shockproof rubber: 115.1 sqm.

PLATFORM AND STRUT ASSEMBLY
Assemble the structure fastening the struts
(numbered from 1 to 30) and the platforms (from A
to G) using the M8xl40 hex screws.
CLIMBING BOARD AND HANDRAIL
ASSEMBLY
Then fasten the wooden climbing boards (from H
to M) using the M8xl20 TORX screws.
NOTE: DETAILED INSTRUCTIONS FOR EACH STEP CAN BE FOUND IN THE
FOLLOWING PAGES

PLANK BRIDGE AND ROPE ASSEMBLY
Fasten the bridge to struts 5-6-7-8 using the
M8xl55 hex screw, Mx80 wide hex screw and the
M8xl80 TORX screw.
PANEL ASSEMBLY
Fasten all panels using the M6x50 TORX
screws.
Fasten the porthole in the panel of tower A
using the M8x50 hex screws.

TUBE BRIDGE ASSEMBLY
Fasten the tube bridges to the
panels using the M8x50 hex
screws.
TUBE SLIDE ASSEMBLY
Fasten the tube slide to the panel
(fastened on struts 18/19) using
M8x50 hex screws.

CLIMBING BOARD AND PE ENTRANCE
ASSEMBLY
Fasten the PE entrances to struts 14/16
and 31/29 using M10x260 TORX screws
and the PE climbing board using the
M8x70 threaded bar.
REPEAT THE
OPERATION ON THE
OPPOSITE SIDE
CURVED SLIDE H.192 ASSEMBLY
Fasten the entrance to struts 1/2 using the M
10x260 TORX screws and the slide using the
M 10x280 TORX screws.

PE ROOF ASSEMBLY
Fasten the roofs to struts 1/2/3/4 and
17/18/19/20 using M8x80 TORX screws.
ACTIVITY PANEL
ASSEMBLY
Fasten the activity panels
to struts 13/15 and 32/30
using M8x80 TORX screws.

TELESCOPE ASSEMBLY
After having drilled the panels, fasten the 6
telescopes to the panels (positioned on struts
22/23, 21/24, 13/15, 30/32, 7/9,: 2/5) using the
bushing supplied.
BENCH ASSEMBLY
Fasten the 5 benches to struts 14/14, 22/23,
29/31, 5/6, 7/8 using M8x80 TORX screws.

* intended as the measurement from the platform to the point indicated by the symbol?
♦at the same level
TOWER B
struts
2/3/5/6
struts
2/3/5/6
struts
1/4
struts
7/8/9/10
struts
7/8/9/10 11/12
struts
11/12
TOWER A
struts
9/10/11/12
struts 9/11

TOWER C
struts
29/31
TOWER D
struts
15/13

TOWER E
struts
20/19
struts
18/19
struts
17/18
TOWER F
struts
21/22/23/24
struts
21/24
struts
22/23
at
platform
level
at
platform
level
at
platform
level
at
platform
level

struts
25/26
struts
25/26/27/28
struts
26/27
TOWER G
struts
27/28
TOWERS H/I/L/M
holes in the middle
of the handrail
struts
3/32
12/14
28/29
15/17
struts
16/20
25/30
4/31
10/13
at
platform
level

ASSEMBLY INSTRUCTIONS
assembly details

Fasten the platforms (8) to the struts (7) using
the nuts and bolts indicated in the figure.
Repeat this operation for the remaining 3
struts and, if necessary, for the other
platforms.
PLEASE NOTE: It is advisable to only secure
the nuts and bolts permanently and insert
the caps once it has been checked that all
the elements have been positioned
correctly.
1
2
3
4
5
6
7
8
1
6
8
8
8
8
8
4
1
M8 washer M8xl40 hex
screw finned PE cap 025
self-locking nut M8 PE
cap PE nut cover
platform strut
Name
Quantity
Article no.

fasten the climbing board (7) to the struts (8),
inserting the nuts and bolts required for fastening as
shown in the figure.
If widenings are present on the climbing board follow
instructions B.
Repeat this
operation for
the opposite
side of the
climbing
board.
PLEASE NOTE: It is advisable to only secure
the nuts and bolts permanently and insert
the caps once it has been checked that all
the elements have been positioned
correctly.
IF WIDENINGS ARE
PRESENT ON THE
CLIMBING BOARD
M8xl00 TORX screw
M8xl20 TORX screw M8
washer finned PE cap
025 PE cap PE nut cover
climbing board strut
4
4
4
4
4
4
2
4
1
2
3
4
5
6
7
8
Name
Article no.
Quantity

fasten the handrail (7) to the struts (8)
at a height of 77 cm from the platform to
the top part of the handrail, inserting the
nuts and bolts required for fastening as
shown in the figure.
If widenings are present on the handrail
follow instructions B.
PLEASE NOTE: It is advisable to only secure
the nuts and bolts permanently and insert
the caps once it has been checked that all
the elements have been positioned
correctly.
IF WIDENINGS
ARE PRESENT ON THE
HANDRAIL
M8xl00 TORX screw
M8xl20 TORX screw M8
washer finned PE cap
025 PE cap PE nut cover
handrail climbing board
strut
1
2
3
4
5
6
7
8
4
4
4
4
4
4
2
4
Name
Article no.
Quantity

horizontal
from h. 120 to
144 cm from
h. 144 cm to
168 cm from
h. 168 cm to
192 cm
from h. 84 cm to 120 cm
from h. 144 cm to 192cm
from h. 84 cm to H. 4 cm

1. Check the exact internal distance between the tower
struts and the respective platform heights.
h.
platform
atform
orm
m

NOTE: The colours and models shown
are for illustration purposes only.
1. Rest the bridge spacers (1) on the
platforms of both towers, in line with the
centre line of the struts, inserting the nuts
and bolts for fixing as shown in the figure.
NAME
istruzione02
/Quantity
CODE NO.
Article
no.
Spacer ________
PE nut cover
PE cap _____________
M8x180 WIDE HEX SCREW UNI704
08 ISQ7Q89 washer
Table of contents
Popular Accessories manuals by other brands

Cuisinart
Cuisinart CEK-120 Instruction booklet

Lanaform
Lanaform Aroma Decor manual

MS Sedco
MS Sedco DH100-CT installation instructions

Awntech
Awntech Houstonian Owner's Manual & Installation Instructions

Dialogic
Dialogic Analog Telecom Board D/120JCT-LSU installation guide

Omron
Omron ZS Command reference guide