Husky ACR3296B User manual

USE AND CARE GUIDE
Quesons, problems, missing parts?
Contact Husky’s manufacturing partner for assistance:
7 a.m. - 5 p.m., CST, Monday-Friday:
Chat: www.edsal.com/chat or www.edsal.com/contact
Phone: 1-773-475-3131
THANK YOU FOR YOUR PURCHASE
WARNING: Excessive weight hazard! Use two or more people to move and install this rack to avoid injury.
Do not leave children unaended near overhead rack. High risk of injury if installed incorrectly. Follow instrucons
carefully and rounely inspect your system to ensure all components are fastened securely. DO NOT JUMP, CLIMB
OR HANG FROM THIS CEILING RACK. Never install more than one of these ceiling storage rack units on any two
overhead joist supports. Use care when working with metal parts, wear gloves. Do not use this unit for anything other
than the manufacture’s intended purpose.
600 lbs.
This unit has a total load capacity of 600 pounds of evenly
distributed weight (not to exceed 28 lbs. per square foot), using
all 8 lag bolts (included in package) anchored into solid wood
joists or supports capable of supporng such a load. Do not over
load. Do not aempt to mount to steel beams. Be sure overhead
joists and supports are structurally sound. Edsal is not liable for
structure failure, or damage or injury resulng from structure
failure.
Warranty
Important Safety Informaon
GUARANTEED FOREVER. If your Husky product ever fails bring it back and we will replace it for free. This full warranty gives you
specic rights which vary from state to state. If this product is defecve contact the manufacturer for repair or replacement
parts.
To obtain replacement parts please provide: Model Number, Part Number & Descripon, Store Locaon and Date Purchased
Adjustable Ceiling Storage Rack
Model Numbers:
ACR3296B
ACR3296W-P
(32x96 assembly_V7)

2
Safety Glasses
Magnec Leveler Tape Measure
Stud Finder
Pencil 7/32” Drill Bit
7/16” Open End
Wrench
Cordless
Power Drill
Rubber Mallet
Ladder
Parts List
Gloves
7/16” Socket Wrench
and
1/2” Socket Wrench
Tools Required
A
B C
H
G
I J
E
F
D
Lag Bolt
K x8
Hex Bolt
L x36
Lock Nut
M x36
Small
Washer
N x72
Large
Washer
O x8
PARTS LIST
ITEM DESCRIPTION
MODEL
ACR3296B
MODEL
ACR3296W-P QTY
ACeiling Angle Bracket GLSA GLSA-W 4
BUpper Post GLUP GLUP-W 4
CLower Post GLLR GLLR-W 4
DSide Brace GLSB-32 GLSB-32-W 2
ELe Beam GLBML GLBML-W 2
FRight Beam GLBMR GLBMR-W 2
GCenter Support GLFTB-32 GLFTB-32-W 1
HCross Support GLSTB-R-32 GLSTB-R-32-W 6
IEnd Wire Deck GLWFDS-32 GLWFDS-32-W 2
JCenter Wire Deck GLWFD-32 GLWFD-32-W 2
HARDWARE

Determine if the orientaon of your ceiling rack will be installed parallel or perpendicular to the direcon of your
ceiling joists. Use a stud nder to locate the joists if ceiling is nished with drywall.
Check the spacing of your ceiling joists to ensure that they will work for the size and direcon of your ceiling rack
install. If the spacing of your joists are 16” there should be ceiling joists located in the necessary posion. The
illustraons shown in this manual are based on 16” joist spacing. See note below for opons if spacing is an issue.*
3
*Note: If the spacing of your ceiling joists does not match the desired assembled size and direcon of your ceiling
rack installaon you will need to install an addional joist support in the correct posion (not included). See below
for suggested addional joist support soluons. If your unsure how to install addional joist supports, consult with
your local professional contractor for assistance.
Parallel Perpendicular
96"
For a parallel installaon ensure that the ceiling
joists are 32” apart.
For a perpendicular installaon ensure that the ceiling
joists are or 96” apart.
Assembly Instrucons
32"
Step 1 - Plan the Installaon
Note: Measure from center to center
of ceiling joists using a tape measure.

4
Assembly Instrucons
Note: Install into solid wood joists only. Brackets must be mounted perfectly in line and square to each other.
Make sure the lag bolts are ght against the joist but DO NOT over-ghten the lag bolts. If they are over-
ghtened, the bolt could snap or the hole may be stripped.
Step 2 - Install Ceiling Brackets (A)
Locate and mark the center of ceiling joist with a pencil.
Use a stud nder to locate the joists if ceiling is nished
with drywall. Use Ceiling Angle Bracket as a template to
mark the two end holes of the Ceiling Angle Bracket on
the center line of the joist using a pencil. Drill pilot holes
using power drill with 7/32” drill bit to the marked
locaons.
✓
Depending on the ceiling rack orientaon preference,
measure 32 or 96” from the installed ceiling angle
bracket to determine the locaon of the second
ceiling angle bracket along the same joist. Must be
measured from the same end of the bracket. Repeat
the steps to install the second ceiling angle bracket in
the same orientaon as the rst.
Install Ceiling Angle Bracket (A) into marked joist using
two Lag Bolts (K) and two Large Washers (O) with a
1/2” socket wrench. The Lag Bolts should be installed
into the two end holes of the Ceiling Angle Brackets.
X
X
A
A
96”
For the second set of brackets, depending on prefered
orientaon, measure 32” or 96” from edge of installed
ceiling angle bracket to the other locaon for the
next bracket on the other joist. The bracket should be
installed in the same orientaon and must measure
32” or 96” from same edge of each bracket. Repeat the
steps to install the second set of ceiling angle brackets
in the same orientaon.
Note: If spacing in joists do not match up to the desired
assembled size and direcon you will need to install an
addional joists to accommodate, see page 3 for opons.
Must measure 32” or 96” from same end of each
bracket.
Must measure 32” or 96” from same edge of each
bracket.
96”
32”
32”

5
Assembly Instrucons
Step 3 - Assemble Upper and Lower Posts (B & C)
27 - 42”
Note: Must be bolted at the highest
point and lowest point of the two
posts and at opposite holes.
Determine desired height of ceiling rack from the ceiling to boom of the overhead rack. Join the upper and lower
post and line up the holes to the determined height. Bolt Upper Post (B) to Lower Post (C) using two Hex Bolts (L),
two Lock Nuts (M) and four Small Washers (N). Bolt at the top hole locaon of the lower post and at the boom hole
locaon of the upper post where they overlap. Each bolt assembly should be on opposite holes. Repeat assembly for
the remaining three Upper Post (B) and Lower Post (C) at the same height.
For Parallel Assembly: Bolt one post assembly to the inside of the installed ceiling angle bracket through the center
hole using one Hex Bolt (L), one Lock Nut (M) and two Small Washers (N). The tapered ends of the post slots must
be facing down. Repeat Post assembly installaon to the Ceiling Angle Bracket located on the same joist in the same
manner and orientaon. For the other two remaining Post Assemblies, installaon will be on the outside of the ceil-
ing angle bracket. Bolt one each of the post assembly to the outside of the other two installed ceiling angle brackets
located on the other joist using one Hex Bolt (L), one Lock Nut (M) and two Small Washers (N) for each post assembly.
The tapered ends of the post slots must be facing down.
posts assembled to
the inside of bracket
posts assembled to
the outside of bracket
Post Assembly to the outside
of Ceiling Angle Bracket
Step 4 - Install Post Assemblies
Post Assembly to the inside
of Ceiling Angle Bracket
✓
C
B
C
B
✓
✓tapered
ends
of post
slots face
down

6
Assembly Instrucons
Step 5 - Install Side Brace (D)
D
D
For Perpendicular Assembly: Bolt together one post assembly through the hole located on the side of the post to
the center hole of the inside angle of bracket using one Hex Bolt (L), one Lock Nut (M) and two Small Washers (N).
The backside of the post must be facing in and the tapered ends of the post slots must be facing down. Repeat post
assembly for the bracket located on the same joist, making sure backside of the post faces in and the tapered ends
of the post slots face down (as illustrated below). Repeat steps for other two post assemblies to the brackets on the
other joist.
Step 4 - Install Post Assemblies Connued
tapered end
of post slots
face down
✓
Note: The assembly of the
side braces must be on the
outside of the posts.
✓
D
Line up the top and boom holes on the ends of the Side Brace (D) with the two holes located on the outer boom
sides of two post assemblies. Bolt each end of the side brace to the posts assemblies using two Hex Bolt (L), two
Lock Nut (M) and four Small Washers (N) through the top and boom holes of the side brace and the two holes of
the post. Repeat assembly for the other Side Brace (D) to the other set of post assemblies.
96”

7
Assembly Instrucons
Step 7 - Install Beam Assemblies
Install one beam assembly by aaching both ends of the beam into the boom slots of each post. Use a rubber
mallet to lightly tap down on each end of the beam to properly seat the beam clips into the tapered ends of the slot.
Bolt together by using one Hex Bolt (L), one Lock Nut (M) and two Small Washers (N) per side into the lined up holes
of the beam and post. Repeat step to install the other beam assembly to other posts assemblies.
Step 6 - Assemble Le and Right Beams (E & F)
Bolt together one Le Beam (E) and one Right Beam (F) using four Hex Bolts (L), four Lock Nuts (M) and eight Small
Washers (N). Repeat steps to assemble the other Le and Right Beam.
✓
E
F
F
E
Tap down lightly on beam with
rubber mallet to seat the beam clips
into the tapered ends of the slots.
✓
G
✓
Step 8 - Install Center Support (G)
Bolt the Center Support (G) into the two holes found in the middle of each beam assembly using two Hex Bolts (L),
two Lock Nuts (M) and four Small Washers (N) per side.
G

8
Assembly Instrucons
I
I
J
J
Step 10 - Install Wire Decking (I & J)
Place the End Wire Decks (I) on the ends of the beams with the notched corners facing the end corners of the posts.
Next place two Center Wire Decks (J) between the previously installed end wire decks.
Step 9 - Install Cross Supports (H)
Assemble the six Cross Supports (H) by placing the rivets located on both ends of the cross support into the
triangular holes located on the top ledge of both beam assemblies.
H
H✓
STEP 11 - Final Inspecon
Check each beam and post connecon to be sure that the
beams are properly seated and brackets are rmly connected
to the overhead joists. Make sure all bolts and nuts are
properly ghtened. It is recommended to periodically repeat
this inspecon process to ensure safety. Retain this manual for
future use.
✓
Note: Be sure the
notched ends on the
End Wire Deck (I) are
installed facing the posts.
I
This manual suits for next models
1
Table of contents
Other Husky Rack & Stand manuals

Husky
Husky ACR4896B User manual

Husky
Husky 90500HWSK User manual

Husky
Husky N2R361872W4B User manual

Husky
Husky CWR48B User manual

Husky
Husky 38964 User manual

Husky
Husky ERZ652454W3B User manual

Husky
Husky HBR652454W3C User manual

Husky
Husky ERZ782478W4 User manual

Husky
Husky BR15WF User manual

Husky
Husky N2W902490W5B User manual