MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
MP200TM Metering System Quickstart Guide
CAUTION! Installation of the MP200TM metering system must be performed only by qualified personnel
who follow standard safety precautions during all procedures. Those personnel should have appropriate
training and experience with high voltage devices. Appropriate safety gloves, safety glasses and protec-
tive clothing are recommended.
During normal operation of the MP200TM metering system, dangerous voltages flow through many parts of the unit,
including: Terminals and any connected CTs (Current Transformers) and PTs (Potential Transformers), all I/O Modules
and their circuits. All Primary and Secondary circuits can, at times, produce lethal voltages and currents. Avoid
contact with any current-carrying surfaces.
Do not use the meter or any I/O device for primary protection or in an energy-limiting capacity. The meter can
only be used as secondary protection.
IMPORTANT! Refer to your meter’s Installation and Operation Manual for additional safety warnings before
performing installation, wiring, or maintenance of your meter. See the link to the manual, below.
NOTE: This Quickstart Guide gives basic installation, wiring, and programming instructions.For additional meter oper-
ation and programming information, refer to your meter’s Installation and Operation Manual and the Communicator
PQATM, MeterManagerPQATM, and EnergyPQA.comTM Software User Manual on EIG’s website:
User Manual:
https://www.electroind.com/products/shark-mp200-multi-point-high-density-metering-system/
From the webpage, click Technical Documents>User Manual.
Software Manual:
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Technical Documents>User Manual.
CommunicatorPQATM Setup Software:
https://www.electroind.com/products/communicatorpqa-software-application-5/
From the webpage, click Download ComPQA Pro. To get a Professional license for the software, email sales@elec-
troind.com or call 516-334-0870.
USB Cable:
https://www.electroind.com/products/cab26522/
All EIG’s metering and software products’ literature can be accessed from:
https://www.electroind.com/all-products/
For software and metering integration, EIG’s Technical Support Engineers are available on an hourly or daily basis to
help with typical commissioning assistance, which includes:
• Verifying meter installation and wiring.
• Verifying proper system integration.
• Working with 3rd parties to ensure cross compatibility.
• Advising users on best practices for optimal implementation.
You can reach Technical Support from 8 a.m. to 8 p.m. EST, Monday-Friday, at 516-334-0870.

Doc# E166705 V.1.05 QS - 2
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
7.62in
193.5mm
4.36in
80.6mm
3.18in
110.6mm
0.81in
20.5mm
Mechanical Installation
Recommended Tools for MP200 Unit Installation:
#2 Phillips screwdriver; 1/4-inch (0.25”) nut driver, socket, box, or open-end wrench; wire cutters.
NOTE: The MP200 unit is designed to withstand harsh environmental conditions; however it is recom-
mended you install it in a dry location, free from dirt and corrosive substances.
1. Mount the unit against any firm, flat surface.
2. Use a #8 screw in each of the four slots on the flange to ensure that the MP200 unit is installed
securely.
IMPORTANT!
For safety reasons, mount
the MP200 unit in an enclosed and
protected environment, such as in a
switchgear cabinet.
Connect an earth ground to the
post on the side of the MP200 unit,
using an AWG 12 wire.
Install a switch or circuit breaker
nearby; label it clearly as the
MP200 unit’s disconnecting
mechanism.
193.1mm
286.5mm
0.28in
0.80in
20.4mm
76.9mm
7.60in
11.28in
278.9mm
centered
3.03in
7.2mm
4.8mm
10.98in
0.19in
centered
4.50in
114.3mm 0.12in
2.9mm

Doc# E166705 V.1.05 QS - 3
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
Electrical Installation:
Service: Three Phase, 4-Wire WYE Service Direct Voltage and 3 CT Connection for Metering
8 Three Phase Loads: MP200-Y
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
WARNINGS! For Electrical Installation:
All Primary and Secondary circuits can, at times, produce lethal voltages and currents.
Avoid contact with any current-carrying surfaces.
The current inputs are only to be connected to external current transfomers (CTs).
I1-LO
LOAD
V2 V1
LINE
N
I1-HI
V1
I3-HI
V3
V3
I2-HI
I2-LO
V2
N
I3-LO
SERVICES: WYE, 4 WIRE.
Power Supply
Connection
CT Shorting Block
EI# SB-6CT
Only one 3 phase circuit is shown.
Duplicate for additional circuits.
Earth Ground
Earth Ground
FUSES
3 x 0.1A
FUSE 3A
CONNECTION TYPE: Direct Voltage, CTs
3
2
1
N
L(+) N(-)

Doc# E166705 V.1.05 QS - 4
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
Service: Three Phase, 4-Wire WYE Service with 3 PT Voltage and 3 CT Connection
for Metering 8 Three Phase Loads - MP200-Y
3
2
I1-LO
LOAD
V2 V1
LINE
N
1
L(+) N(-)
I1-HI
V1
I3-HI
V3
V3
I2-HI
I2-LO
N
V2
N
I3-LO
SERVICES: WYE, 4 WIRE.
Power Supply
Connection
CT Shorting Block
EI# SB-6CT
Only one 3 phase circuit is shown.
Duplicate for additional circuits.
Earth Ground
Earth Ground
FUSES
3 x 0.1A
FUSE 3A
Earth Ground
CONNECTION TYPE: 3PTs, CTs
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.

Doc# E166705 V.1.05 QS - 5
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
Service: Three Phase, 3-Wire Delta Service with 2 CT Connection for Metering 8 Three Phase
Loads - MP200-Y
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
I1-LO
LOAD
V2 V1
LINE
I1-HI
V1
I3-HI
V3
V3
V2
I3-LO
SERVICES: DELTA, 3 WIRE.
Power Supply
Connection
CT Shorting Block
EI# SB-6CT
Only one 3 phase circuit is shown.
Duplicate for additional circuits.
Earth Ground
Earth Ground
Earth Ground
FUSES
2 x 0.1A
FUSE 3A
CONNECTION TYPE: NO PTs, 2 CTs
C
BA
L(+) N(-)
Not connected to meter

Doc# E166705 V.1.05 QS - 6
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
Single Phase, 2-Wire Service with Direct Voltage and 3 CT Connection for Metering 24 Single
Phase Loads: MP200-S
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
I1-LO
LOADS
VL
LINE
N
1
L(+) N(-)
I1-HI
VL
I3-HI
I2-HI
I2-LO
N
N
I3-LO
SERVICES: SINGLE PHASE, 2-WIRE
CONNECTION TYPE: Direct Voltage, CTs
Power Supply
Connection
Only three circuits are shown.
Duplicate for additional circuits.
Short Voltage inputs
together
Earth Ground
CT Shorting Block
EI# SB-6CT
Earth Ground
FUSE 3A

Doc# E166705 V.1.05 QS - 7
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
Service: Single Phase, 3-Wire Service with Direct Voltage and 1 CT Connection for Metering
24 Single Phase Loads - MP200-S
IMPORTANT! All CTs must have one side grounded to reduce shock hazard.
EIG highly recommends using shorting blocks like the EI SB-6TC so that the meter can be removed
from service while the CT is energized. You can order the EI SB-6TC at www.electroind.com.
I1-LO
LOADS
VL1
LINE
N
L(+) N(-)
I1-HI
VL1
I3-HI
I2-HI
I2-LO
VL2
I3-LO
CONNECTION TYPE: Direct Voltage, CTs
To monitor 24 individual loads.
See accuracy table for limiting factors.
Power Supply
Only one circuit is shown.
Duplicate for additional circuits.
Short Voltage inputs
together
Earth Ground
CT Shorting Block
EI# SB-6CT
Earth Ground
FUSE 3A
VL2
VL1
VL2
21
N
FUSES
2 x 0.1A
Run lines VL1 and VL2 through
the CT in opposite directions
Set PT ratio to half
in the meter.
SERVICE: SINGLE PHASE, 3-WIRE
Connection

Doc# E166705 V.1.05 QS - 8
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
MP200 Metering System Configuration:
1.Connect to the MP200 unit through its
USB port: Use a USB Type A to B plug to
connect from your PC’s USB port to the
MP200 unit’s USB port. If your PC doesn’t
automatically find the USB driver, see page
QS-1 for the download link and see
Appendix A in the meter’s User Manual for
instructions.
NOTE: This Quickstart shows connection
using the USB port. For Ethernet/Wifi or
RS485 connection, see the MP200 Metering
System Installation and Operation Manual.
2. Open CommunicatorPQATM software
(download from product CD).
3. Click Connect on the tool bar. You will see
the Connect screen, shown on the right.
Make sure
the Address, Baud Rate, and Protocol settings match
the ones shown here.
4. Click Connect - the Device Status screen confirms the
connection; click OK to close it. The CommunicatorPQATM
application’s Main screen opens.
5.Click the Profile button on the tool bar. The Device Profile
screen opens. The Tree menu on the left side of the
screen lets you choose setting screens.
6. Click System Settings to open one of the screens shown
below. Use this screen to name the MP200 unit (CPU) and to label the circuits (individual meters).
You must give the MP200 CPU an individual, unique name to properly download data.
USB Port
Note that you
can also set
Data Protection
on this screen,
and create or
change a pass-
word for reset-
ting and/or
configuration.

Doc# E166705 V.1.05 QS - 9
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
8. Click Communications (see instructions below).
9. Click CT, PT Ratios and System Hookup (see instructions below).
10.Click Time Settings (see instructions on the next
page.
Communications Settings:
COM 1: RS485/ Ethernet/WIFI (optional)
Address: 1-247; Baud Rate: 57600;
Protocol: Modbus RTU/Modbus ASCII;
Response Delay: 0-750ms; Parity: Odd, Even or
None
COM 2: USB port
NOTE: The USB port settings are fixed.
COM 3: RS485
Address: 1-247; Protocol: Modbus RTU/ASCII
Baud Rate: 9600, 19200, 38400, 57600
Response Delay: 0-750ms
NOTE: Click the (1)Default to Ethernet or
(2)Default to Display button to set either the
(1)Ethernet settings for COM1 or (2)Display set-
tings for COM3, to their default values.
CT, PT Ratios and System Hookup: Note that the
settings you see on the screen depend on your
MP200 unit’s circuit configuration. The top screen is
for an MP200 unit with the single phase circuit con-
figuration (MP200-S). The second screen is for an
MP200 unit with the three phase circuit configura-
tion (MP200-Y). The bottom screen is for an MP200
unit with the 2 CT Delta circuit configuration.

Doc# E166705 V.1.05 QS - 10
MP200TM Metering System Quickstart Guide
Electro Industries/GaugeTech
™
Powered by Innovation™
For PT settings, see the MP200TM Metering System Installation and Operation manual, (see page QS-
1):
CT Ratios
CT Numerator (Primary): 1 - 65535
CT Denominator (Secondary): 5 or 1 Amp,
depending on the MP200 unit’s ordered option
(this field is display only).
Program Meter Time:
The meter is preset to Eastern time. To change the meter time:
1. From the Main screen’s Title bar, click Tools>Set Device Time.
2. You can either enter the time in the Time fields, or click Use
PC Time to set the time using your PC’s time.
3. Click Send.
Update Device:
11. When you have made changes to the
meter’s Device Profile, click Load Profile
at the bottom of the Device Profile
screen to send the new settings to the
meter. The meter will reboot and then you can reconnect to
it. Note that you can also click Save Profile to save your changes without sending them to the
meter.
NOTE: For further details and additional programming screens, refer to the software User Manual (see
page QS-1 for the download link; alternatively you can access the software manual by clicking
Help>Contents from the CommunicatorPQATM application’s Main screen).
Shark® is a registered trademark of Electro Industries/GaugeTech. MP200TM, CommunicatorPQATM, MeterManagerPQATM, and Ener-
gyPQA.comTM are trademarks of Electro Industries/GaugeTech.
https://electroind.com/
This manual suits for next models
1
Table of contents
Other Innovation Measuring Instrument manuals
Popular Measuring Instrument manuals by other brands

Honeywell
Honeywell RMA 3000 user manual

Monroe Electronics
Monroe Electronics 288 Operator's manual

PCB Piezotronics
PCB Piezotronics P357B21 Installation and operating manual

Electro-Tech systems
Electro-Tech systems 204 operating manual

Bosch
Bosch FSA 500 Original instructions

Guralp Systems
Guralp Systems CMG-3TB Operator's guide