Ironclad TPT-664 Quick start guide

1
ADJUSTABLE BASKETBALL SYSTEM
MODEL: TPT-664
ASSEMBLY INSTRUCTIONS AND OWNER'S MANUAL
!!
WARNING
IRONCLAD SPORTS, INC
902 Corey Road, Hutchinson, KS 67501
Tel: 620-662-2233
www.ironcladsports.com
FAILURE TO COMPLY WITH ANY
OF THE WARNINGS IN THESE
INSTRUCTIONS MAY RESULT IN
SERIOUS PERSONAL INJURY.
FAILURE TO COMPLY MAY ALSO
R E S U LT I N P R O P E RT Y D A M A G E .
PLEASE HEED ALL WARNINGS AND
CAUTIONS TO ENSURE YOUR SAFETY.
DO NOT ATTEMPT TO ASSEMBLE THIS
SYSTEM WITHOUT CAREFULLY
READING AND FOLLOWING ALL
INSTRUCTIONS. BEGIN BY
IDENTIFYING AND TAKING
INVENTORY OF ALL PARTS USING
T H E P A R T S L I S T P R O V I D E D .
IRONCLAD SPORTS , INC
TRIPLE THREAT
Keep this instruction manual in case you have to contact the manufacturer for replacement parts.

TOOLS AND MATERIALS REQUIRED FOR ASSEMBLY
(Not Included)
1. 2 Adjustable Wrenches 10. Concrete-1/2 yard or 14-16
2. Socket Set Bags, (80 lb. bags)
3. 9/16" Wrench 11. Phillips Head Screwdriver
4. 3/4" Wrench 12. Electric Drill
5. 15/16" Wrench 13. Carpenter's Level
6. 1/2" Wrench 14. A minimum of 2 Ladders
7. Hammer or Mallet 15. Water Supply
8. Tape Measure 16. Degreaser
9. Shovel 17. 1/4" Drill Bit
**A MINIMUM OF SIX ADULTS IS
REQUIRED TO LIFT UNIT INTO PLACE**
STOP!STOP! STOP!STOP!
BEFORE YOU START
A. Identify and inventory all parts using the checklist boxes in the parts list. Be sure to
keep the hardware bags and their contents separate. If any parts are missing call
our Customer Service Department (620-662-2233).
B. Test fit all Bolts by inserting them into the respective hole. If necessary, carefully
scrape away any excess powder coating buildup from inside the holes. Do not
scrape away all of the powder coating. Bare metal may rust.
!!
SAFETY INSTRUCTIONS
FAILU RE TO FO LL OW TH ESE SAFE TY INSTR UCTI ONS MAY RESULT IN SERIOUS INJU RY OR PROPERTY DAMAGE
AND WILL VOID TH E WARRANTY. The ow ner must ensur e that al l pl ayer s know and fol low these rules to saf ely oper at e the
sys tem . Proper and com pl ete assem bl y, use and super vi si on is essent ial for proper oper ation and to reduce the risk
of acci dent or inj ur y. A high pr obabi lity of ser ious inj ur y exi st s if this sys tem is not inst al led, maint ai ned, or oper at ed
proper ly.
● If usi ng a ladder dur ing assem bl y, use ext reme caut ion. Fol low all warni ngs and caut ions on the ladder car ef ully. ● 6
peopl e are requi red to lift the uni t int o pl ace. ● Bef or e diggi ng, cont act the appr opr iat e agency to locat e under ground
pow er cabl es, gas, and wat er lines. Do not inst al l the sys tem withi n 20 feet of over head pow er lines. ● Climat e, cor rosi on,
or misuse coul d resul t in sys tem fai lur e. ● If techni cal assi stance is requi red, cont act the manuf act ur er. ● Mini mum
oper at ional hei ght is 7'6”to the Rim. Most inj ur ies ar e caused by misuse and /or fai lur e to fol low inst ruct ions.
Use caut ion when usi ng the sys tem .
2

PARTS LIST
Verify all parts listed on packing list are present prior to installation. Contact our Customer
Service at 888-662-2233 for assistance with replacement of any parts missing or damaged.
3
Y 1 20mm Lock Nut
Z 1 20mm x 32cm Hex Bolt
TEM QTY DESCRIPTION
A 1 6.0” x 6.0” Main Post
B 1 Main Extension Arm
C 2 Upper Extension Arms
D 1 H-Frame Backboard Mount
E 2 Spring-Assist Cartridge
F 1 Actuator-Height Adjustment Device
G 1 Rim Height Indicator
H 1 Rim Height Sticker
I 1 16mm x 13cm Hex Bolts
J 1 16mm x 18cm Hex Bolts
K 4 16mm Flat Washer
L 2 16mm Lock Nuts
M 4 Steel and Plastic Spacer
N 4 16mm Anchor J-Bolts
O 4 Anchor Template
P 4 Anchor Rebars
Q 8 Thick Washers
R 8 16mm J-Bolt Hex Nuts
S 4 16mm Flange Nuts
T 3 18mm x 32cm Hex Bolts
U 10 18mm Flat Washer
V 5 18mm Lock Nut
W 2 18mm x 28.5cm Hex Bolts
X 2 20mm Flat Washer

a. Dig a hole 48" deep and 21"x 21"square . The edge of the hole
should be flush with the edge of the playing surface. If you live in an area
where heavy frost can occur, it may pose a problem, consult your local
building inspector to determine the appropriate hole depth.
b. Build a form before pouring the concrete pad, to ensure that the top
of the concrete rema ins straight and square. The form should
be placed about 1/2" above the playing surface to allow for water drainage.
c. Bell out the bottom of the hole.
21"
21"
48"
NOTE: The hole must be at least 48" deep.
NOTE: A square hole prevents the rotation of the concrete.
NOTE: The area behind the playing surface must be cleared off by at least
3 feet to enable the user to stand behind the pole to adjust the Rim height.
NOTE: Before digging, call to locate any buried utility lines.
NOTE: At rim height 10’, distance from the face of backboard to the
front of Main Post(A)is 48”, Choose the proper location to dig
for the concrete footing:
STEP B
A. Threa d a 16 mm Hex Nut (M) on to each of the 16 mm J-Bol ts
(N).Secu rel y tighten the Nuts al l the way down to the en d of the
thr ea ds.
B. Slide the thr ea de d en d of the J- Bol ts thr ou gh the holes
in the Anch or Templ at e (O) and secure ea ch J- Bolt with a
16mm J- Bol t Hex Nut s( R) as sho wn. Secu rel y tighten al l Nut s
at thi s time.
N
R
O
N
N
N
R
RR
R
N
NOTE: Make sure the curved“J”ends of the J-Bolts are
oriented in a rectangular pattern, as shown.
4

STEP C
STEP D
a. Mix th e concrete accord ing to the instru ctions on th e bags. Note that
a thicker mix of concre te will dry stro nger than a thin mix. Pour the
concre te into the hole, sto pping appro ximately 18 inches fro m the to p
of th e hole.
b. In sert th e fo ur pieces of Anchor Rebar (P) into the hole, pushing each
piece fi rm ly to the botto m of th e hole. The fo ur pieces should be
arr anged in a square appro ximate ly 8 inches wide so th at each piece of
rebar will be positi oned next to the J-B olts when the J-B olt Template
is placed in th e cement.
c. Finish fi lling th e hole to th e top with concre te. The top of the concre te
should re ach just above th e level of th e to p of th e fo rm .
P
a. Positi on th e J-B olt Templa te (O) over th e hole so th at it is cente re d,
with th e sid es of the pla te square with the sid es of th e hole.
b.P ush th e J-Bolts (N ) in to the concre te until th e J-Bolt Template is
restin g fla t again st the surf ace of th e concrete.
c. Gra sp th e tops of th e J-B olts and agita te th e Template assembly back
and fo rt h re peate dly to elimin ate any air bubbles in th e concrete . Lift th e
Templa te slightly above th e concrete when agita tin g . Make sure th e
Templa te is restin g on the concre te afte r agita tin g. Form th e concrete
into a downward slo pe away fr om th e Pole to all ow water ru noff.
d. Cle an off any concre te th at may be on th e J-Bolt Template or th e exposed
port io ns of the J-B olts .
e. Usin g a carpente r’s level, make sure th e Templa te is square to and level
with th e pla ying surf ace.
f. All ow th e concre te to cure fo r a min im um of 5-7 days befo re in sta llin g
the re st of your basketball syste m. In cold , wet weath er or humid
cli mate s, allow additi onal tim e for th e concre te to cure.
min im um
YOU ARE NOW FINISHED WITH THE INITIAL ASSEMBLY STEPS. DO NOT PRO-
CEED WITH THE ASSEMBLY UNTIL THE CONCRETE HAS FULLY CURED . CUR-
ING WILL TAKE A MINIMUM OF 72 HOURS. IN HUMID CLIMATES OR WET
WEATHER, ALLOW ADDITIONAL TIME FOR THE CONCRETE TO CURE.
! !
WARNING
NEVER USE THE SYSTEM WITHOUT FOLLOWING THE CEMENTING INSTRUCTIONS . FAILURE TO
FOLLOW ALL OF THESE INSTRUCTIONS AND WARNINGS COULD LEAD TO SERIOUS PERSONAL INJURY
OR PROPERTY DAMAGE AS LISTED ON PAGE ONE.
O
N
5

! !
WARNING
*BECAUSE OF THE SIZE AND WEIGHT OF THE SYSTEM, A MINIMUM OF
THREE ADULTS ARE REQUIRED FOR THE FOLLOWING STEPS*
STEP1
A. Slide a 16mm Thick Washer (Q) over each of the J-Bolts(N) as shown in FIGURE 1A.
B. Place the Main Post(A) over the J-Bolts. Slide a 16mm Thick Washer(Q) and thread a 16mm Flange
Nut(S) to each J-bolt.Tighten the Nuts only a few turns onto the J-Bolts as shown in FIGURE 1B.
C. If the Main Post (A) is not exactly vertical, adjust the 16mm J-Bolt Hex Nuts(R) located under the
Post base. Tighten all of the Flange Nuts(S) when Main Post(A) is vertical.
NOTE: Face the Main Post(A) with Actuator Bracket facing away from playing court(as shown in FIGURE 1C).
6
STEP2
A. Slide the Main Extension Arm(B) over the
top of the Main Post(A) and attach to the
lower pivot tube with a 18mm x 32cm Hex
Bolt(T), two 18mm Flat Washers(U) and a
16mm Lock Nut(V).
T
U
U
V
B
A
S
Q
A
S
Q
S
Q
S
AI
Q
Q
Q
Q
O
R
R
R
R
FIGURE 1A FIGURE 1B
Playing Court
Back
FIGURE 1C

7
A. Slide the Actuator(F) to the last set of welded
tubes on the Main Extension Arm(B), Using a
18mm x 32cm Hex Bolt(T), two 18mm Flat
Washers(U) and a 18mm Lock Nut(V) at the
top. And using a 16mm x 13cm Hex Bolt(I),
two 16mm Flat Washer(K) a 16mm a 16mm
Lock Nut(L) on bottom to tight the Actuator.
STEP 3
STEP 4
A. Attach the Plastic Rim Height Indicator(G) and the
2 Spring-assists Cartridge(E) to the second set of
welded tubes on the Main Extension Arm(B) by
using a 20m x 32cm Hex Bolt(ZA), two 20mm Flat
Washers(X) and a 20mm Lock Nut(Y). The Plastic
Rim Height Indicator(G) should hang freely along
side the Spring-Assist Cartridge(E).
B. Attach the bottom of Spring-assist CartridgeS(E) to
the welded Actuator Bracket by using a 16mm x 18cm
Hex Bolt(J), two 16mm Flat Washers(K) and a 16mm
Lock Nut(L).
C. Remove and discard the blue plastic spreader tube from the
Spring-Assist Cartridges(E).
STEP 5
A. Attach the 2 Upper Extension Arms(C) to Main Post(A)
with a 18mm x 28.5cm Hex Bolt(W), two 18mm
Flat Washers(U) and a 16mm Lock
Nut(V).
NOTE: It does not matter which end of the Upper
Extension Arms you attach to the Main Post(A).
CAUTION: Injury may occur if Upper Extension
Arms are allowed to fall off Main Extension Arm
during assembly.
W
U
UV
C
IKKL
TUUV
F
E
ZXXY
JKKL
G

8
STEP 6
STEP 8
A. After everything is square, make sure all nuts on the
system have been tightened.
NOTE: But do not over tighten the Nuts, make sure the unit
can be adjusted up and down.
B. To apply the Rim Height Sticker(H), first use a tape
measure to crank rim up to exactly 10’ from the playing
surface. Use a pencil to make a mark on the Spring-assist
Cartridge(E) where the bottom of the Rim Height Indicator(G)
stops. Then, peel and apply Rim Height Sticker(H) to outside
of Spring-assist Cartridge(E) lining up the pencil mark with the
10’ mark on the Rim Height Sticker(H).
C. Attach Post Pad and Gusset Pad to Main Post(A) as shown.
A. Attach the backboard to Main Extension Arm(B) by
using a 18mm x 32cm Hex Bolt(W), two 16mm Flat
Washers(U) and a 16mm Lock Nut(M). And then
secure the Upper Extension Arm(C) to Backboard
by using a 18mm x 28.5cm Hex Bolt(W), two 16mm
Flat Washers(U) and a 16mm Lock Nut(V).
A. Insert the 4 Plastic and Steel Spacers(M) into the 4
holes on the backboard.
CAUTION: Do not proceed with rim installation
without these spacers!
B. Mount the rim to the H-frame Backboard Mount(D)
and Backboard Assembly using the hardware supplied
in rim box.
NOTE: Use a level to make sure rim is level side to side
before tightening nuts.
STEP 7
M
T
U
U
V
W
U
UV
H
Other Ironclad Sport & Outdoor manuals

Ironclad
Ironclad GC55-MD Quick start guide

Ironclad
Ironclad FCH-885 Quick start guide

Ironclad
Ironclad TRIPPLE THREAT Quick start guide

Ironclad
Ironclad GC55-MD Quick start guide

Ironclad
Ironclad HIGHLIGHT HOOPS HIL664 User manual

Ironclad
Ironclad TRIPLE THREAT TPT-443 Quick start guide

Ironclad
Ironclad GC66-XXL Quick start guide