Jaypro CARBON ULTRALITE User manual

JAYPRO CARBON ULTRALITE 3” OD NET SYSTEM
Installation and Operating Instructions
Applicable Part Numbers/Models:
PVB-9500: Carbon Ultralite 3” System

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 1 of 9-
UPDATED 12/12/2018
Table of Contents
1Safety................................................................................................................ 2
2Specifications.................................................................................................. 2
3Introduction ..................................................................................................... 2
4Required Tools................................................................................................. 3
5Included Hardware & Components............................................................ 4
5.1 System Components (ACCESSORIES MAY VARY) ............................. 4
5.2 Hardware................................................................................................. 5
6Assembly .......................................................................................................... 6
7Maintenance .................................................................................................. 9

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 2 of 9-
UPDATED 12/12/2018
1Safety
•WARNING: Do not attempt to remove the height adjuster pin if the net is under
tension.
•WARNING: Always use protective padding around each upright during use.
•IMPORTANT: Follow all warning labels on equipment.
•IMPORTANT: Inspect for damage before and after each use.
2Specifications
OUTER
DIAMETER
HEIGHT RANGE
#OF
POSITIONS
WEIGHT
UPRIGHT MATERIAL
PVB-9500
3”
(76mm)
6’6” to 8’2” ± 1.5”*
(2.0m to 2.5m± 4cm)
8
Pin Stops
34 lbs
(13kg)
Carbon Composite
*Greater adjustability can be ordered upon request to accommodate deeper floor sleeves
3Introduction
Note: The Flex Net supplied with this system will stretch slightly during the first few uses.
This is a natural consequence of the headband fibers being stretched under tension.
During this break-in period, the headband and net body may sag during use. Simply
increase tension (center if necessary) to remove the sag.
These instructions assume that the appropriate ground sleeves have been correctly
installed:
•The inside bottom surface of the ground sleeves must be 10” below ground level
(Figure 3-1).
•The PVB 9500 standards will fit most 3” inner diameter ground sleeves.
•The bottom 10 inches of the standards have been covered with an outer layer to
improve fit in most ground sleeves. If fit is too tight, cut outer layer with knife and
remove.
•The Flex-Net will work with ground sleeves spaced 35’ to 37’ apart on center1.
1NCAA and NFHS rules require that the upright standards must be installed at least 3’3”
(1m) outside the court boundaries. Jaypro recommends 36’ spacing on center to satisfy
both regulations.

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 3 of 9-
UPDATED 12/12/2018
Figure 3-1: Correct Ground Sleeve Dimensions
4Required Tools
Before continuing, please verify that you have the following tools required to complete
the installation and setup of your PVB Series Collegiate Net System.
▪Adjustable wrench
▪Hex keys –3/16”, 5/16”

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 4 of 9-
UPDATED 12/12/2018
5Included Hardware & Components
Before continuing, please open all packages to verify that you have all the required
hardware for installation and setup. If any of the following items are missing, contact the
Jaypro Sports customer support team, Monday through Friday, 8:30AM to 5:00 PM (EST),
at 1-800-243-0533.
5.1 System Components (ACCESSORIES MAY VARY)
Figure 5-1: Winch End Upright (1X)
Figure 5-2: Dead End Upright (1X)
Figure 5-3: Winch with strap (PVBWINCH, 1X).
Figure 5-4: Flex-Net (PVBN-6, 1X)

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 5 of 9-
UPDATED 12/12/2018
Figure 5-5: Antennae and Net Tapes (VBA-80, 1 pair)
5.2 Hardware
Figure 5-6: Net extension cord 31 inches (PVBN6R2, 2X)
Figure 5-7: Socket Cap Screw (HS5082, 1X)
Figure 5-8: Centering Strap (PVB604, 1X)
Figure 5-9: Acorn Nut (HN809, 1X)
Figure 5-10 Spacer (HM6117, 1X)
Figure 5-11: Button Head Screw (HS5181, 1X)
Figure 5-12: Carabiner (HM5054, 2X)

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 6 of 9-
UPDATED 12/12/2018
6Assembly
1. Install each upright into the ground sleeves.
* The bottom 10 inches of the standards have been covered with an outer layer to
improve fit in most ground sleeves. If fit is too tight, cut outer layer with knife and
remove.
2. Follow instructions included with winch to set the winch clamp to the correct
upright diameter (3”).
3. Install winch to one upright using the socket cap screw and acorn nut (Figure
6-1, items 1 & 2).
4. Fasten the clamp together using the cap screws supplied with the winch (Figure
6-1, item 4-1).
Figure 6-1: Winch installation.

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 7 of 9-
UPDATED 12/12/2018
5. Fasten anchor strap assembly to non-winch pole with the button head scre,
spacer, and acorn nut as shown below.
Figure 6-2: Anchor strap installation.
6. Install net extension cords to the winch strap and anchor strap assembly and
install carabiners to the free ends of net extension cords (Figure 6-3).
Figure 6-3: Install net extension cord to anchor side.

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 8 of 9-
UPDATED 12/12/2018
7. Set the height of the uprights using the installed height adjust pin (Figure 6-4).
WARNING: Release tension from the net, if installed, before removing height adjust
pin.
Figure 6-4: Set upright height.
8. Attach D-rings on net headband to extension cords to the carabiners (Figure 6-3).
Figure 6-3: Attach net to straps.
9. Tension the net by turning the winch handle clockwise2. Adjust anchor strap as
necessary to keep net centered.
***The net will stretch ~6 –8 inches when tension is applied so you must factor this
in before applying tension when centering the net.
10. Verify net heights and net centering. The uprights will deflect inward and
downward due to net tension; you may need to adjust their heights and/or re-
center the net.
2NCAA and NFHS rules stipulate that there be no more than ¾” of sag in the net
headband when fully tensioned.

PVB-9500 Jaypro Carbon Ultralite 3” OD Net System Instructions
- 9 of 9-
UPDATED 12/12/2018
11. Attach the bottom net straps to each upright as shown in Figure 6-5. Wrap Velcro
straps around buckles for additional player safety.
Figure 6-5 : Secure bottom net straps to uprights.
12. Attach net antennae and tapes according to instructions included with
antennae set.
13. Install pads around each upright.
7Maintenance
Your UltraLite Carbon Volleyball System is designed to provide years of play; however, it is
recommended that the components be inspected at least once every season, for signs
of excessive wear. Key areas to inspect include (but are not limited to):
▪Strap webbing
▪Net
▪Spring clips and D-rings
▪Winch mechanism
▪Screws and nuts
Table of contents
Other Jaypro Sport & Outdoor manuals
Popular Sport & Outdoor manuals by other brands

Gared Holdings
Gared Holdings SGRTPT Series installation instructions

MOB
MOB MO6801 user manual

Sport-thieme
Sport-thieme 111 5909 user manual

Pop-A-Shot
Pop-A-Shot PRO DUAL SHOT PASPDS22 Assembly instructions

Quickplay
Quickplay Kickster ACADEMY user guide

Super Tramp
Super Tramp Polymesh Wallaby Bed How-to guide