joule Navitas In-roof User manual

NAVITAS IN-ROOF
joule navitas solar in-roof at panel
installation manual
INSTALL

Installer Loyalty Scheme
Coming Soon
2

Table of Contents:
04 Introduction
05 Site survey
06 Risk assessment
08 Kit components
09 Mounting Options
10 Important Pre Installation Information
12 Overview of materials
14 Overview of materials (single row)
16 Overview of materials (double - multiple row)
17 Overview of tools
18 Mounting - single row
34 Mounting - double-multiple row
43 Specications
44 Pump Station
45 Safety Vessel Connection
46 Electrical Solar Controller
50 Commissioning
52 Servicing and Maintenance
3
NAVITAS IN-ROOF
installation manual

Introduction
Solar hot water systems should be designed and sized correctly before commencing
the installation. Proper design will ensure that a system is correctly sized to provide
many years of optimised performance and most or all of the required hot water when
the most solar radiation is available. However a supplementary heating system such
as oil or gas boiler, heat pump or wood boiler is required for months which have less
solar radiation. This guide will illustrate and explain how a system should be installed
to conform to the Joule manufacturer guidelines for the Vissolis product models. Us-
ing this guide Stages of a solar installation are described in the following pages, with
illustrations where necessary to explain how to install the relevant components, and
contains general recommendations and important safety information.
Handling Guidance
• Tubeandmanifoldboxesshouldbetransportedhorizontally.
• Heavygoodsshouldnotbeloadedontopofthekitboxes.
• Careshouldbetakenwhenopeningboxestopreventscratchesorsuddenshocks
to the glass.
• Donotusesharpobjectstoopenthetubeboxes.
Installation Guidance
• Unpackandinstalltubesonlyafterthemanifoldandpipeworkhasbeeninstalled.
• Donotleavethesolarcollectorexposedtosolarradiationwhenthesolarloopand
manifold have been drained. Collectors left exposed in a dry state must be cov-
ered to prevent possible long term damage.
• Tubesmusthaveaminimumelevationof20˚andamaximumof70˚.
• Thepipeworkofthesolarcollectorloopistobeearthedandthecollectoristobe
lightening protected in accordance to local regulations.
A solar panel installation must be performed in accordance with all Health & Safety
legislationandlocalbuilding/planningregulationsfortherelevantjurisdiction.Further-
more,thenecessaryelectricalworkrequiredtoinstallcontrolequipmentshouldbe
undertakenbyaqualiedelectricalcontractor.
4

DegreeofOverShading
Shadingwillreducetheoverallperformanceofasolarsystem.Duringtheplanningstageofasolarsystem.Con-
sid-erationshouldbegiventothelocationofthecollectorswiththeaimofminimisingtheeectsofshadingfrom
high buildings, trees, etc.
none / little / a lot
CollectorFixingSurface
Is there enough room for the solar panels to sit on the required roof? (yes/no)
Is there enough between gulleys (top, bottom and both sides) to prevent leafs and debris from gathering
around the panels?
(yes/no)
OrientationofRoof&EstimatedTiltAngleofRoofforMountingSolarCollectors
WhatistheRooforientation(shouldbebetweenEastSE-WestSW)
Collector should be facing the equator
Is an inclinded roof frame need to obtain required pitch? (yes/no)
Tocalculateoptimalangleoftiltmultiplelatitudex0.7fordomestichotwaterproduction
Birr37.16°,Cork36.3°,Dublin53.43°
EstimatingHotWaterDemand&SizeofSystemRequired
No. of people using hot water in the house
Any other exceptional water loads in the dwelling
No. of People Solar Cylinder Size SizeofFlatPanelSystem SizeofEvacuatedTube
2PanelSystem(4m2) 30TubeSystem(2.83m2) 1-2people 200litres
3PanelSystem(6m2) 40TubeSystem(3.77m2) 3-5people 300litres
Location of Solar Pump Station & Solar Controller
Ensurethepumpstationislocatedinanareawhereitcanbeeasilyaccessedforservicing&main-tenance (Conrm)
Ensurethatthereisadequatespacebothleftandrightofpumpstationtoalloweasyaccesstoremovepump
in future.
Ensurethatthesolarcontrollerislocatedinanareathatiseasilyaccessiblefortheuser (Conrm)
Ensurethatthecontrollerismountedattheocrrctheightforeasyviewing. (Conrm)
ExistingPlumbingSystem
What type of plumbing system is in the dwelling (vented or un-vented)?
Is solid fuel incorporated into the plumbing system?
Isthereadequateaccesstoroutepipeworkfromsolarcollectorsdowntocylinderlocation? (yes/no)
Is there space in the hot press to locate solar pump station? (yes/no)
Site Survey
5
NAVITAS IN-ROOF
installation manual

SafeRoofAccessToWork
Isthereadequateaccesstoareaofhousetomountscaoldingorladders? (yes/no)
Istheresteadyandsecurebaseonwhichtomountscaoldingorladders? (yes/no)
Arethescaoldingandorladderstforuseintended? (yes/no)
Allinstallerstrainedinworkingatheights? (yes/no)
Areallharnessandothersafetyequipmentworkingcorrectly? (yes/no)
Allworkcarriedoutshouldbeinaccordancewithallrelevantgoodpraticesandorcurrentbuildingstand-
ards.Allcurrentregulationsshouldbefollowedinrelationtoworkingatheights.Nothingstatedinthisguide
takespre-sedenceovercurrentstandards.
ConditionofRoof
Whatarethecentresofroofrafterswheresolarcollectoristobemounted(eg400mm)? (mm)
Whatisthesizeofroofrafters(eg6x2”,7x2”,8x2”)? (inch)
Are roof rafters cross braced? (yes/no)
Is any of the timber showing discolouration (indicating rot)? (yes/no)
To determine the total load on the roof you must get the total weight of the collectors and divide this weight
bythenumberofroofxingboltsoranchorsusedtoholdthecollectorontheroof.Thiswillgiveyouthe
weight of the solar panels on each point of the roof. You must then carefully review the points where the col-
lectorsareconnectedtotherooftoensurethattheseexactpointscantaketheanticipatedload.
Wherethereissignsofdiscolourationacloserexaminationwillberequried.Ifblackspotsarefoundonthe
timberthisindicatesaleakwhichneedsattention.Ifthetimberappearsbrownandakythenthetimber
may need to be replaced. If the situation is unclear a structural engineers report should be obtained prior to
completinganyfurtherwork.
EectsofSnowLoads
What is the estimated annual snow fall for this part of the country? (mm)
TheestimatedsnowloadforallpartsofirelandmaybefoundfromhistoricaldatalocatedonMetEireann’s
website. www.met.ie
What is the total extra weight to be assumed from a snow fall? (kg)
Irishsnowweighsapprox150kgperm3.Todeterminetheextraweightthesnowwilladdtothesolarpanels
you may assume the following formula. (snow fall in meters x area of panel on the roof in m2x150kg/m3)
Whenyoundoutthetotalextraweightofthesnowaddittothetotalweightofthecollectorontheroof.
The using this new weight examine the roof structure to ensure its suitability. You do not need to consider
the snow load when installing evacuated tubes.
EectsofWindLoad
The evacuated tube collector is exempt from consideration of wind loading for the same reason as the snow loading.
Whenconsideringatpanelswindtestshavebeenconductedthatensurethattheyandtheirxingbracketscanwithstandall
recorded wind forces in Ireland when mounted on a four storey house or less.
Risk Assesment
6

Pipework&Liquids
Isantifreezebeingusedasthesolarsystemuid? (conrm)
Ensuresolderjointsarenotusedthroughouttherentiresystem (conrm)
Ensurehightemperatureinsulationisusedthroughtallpipeworkinsolarsystem (conrm)
Ensurewhitepasteandhempisusedonallttingconnectionsthroughout (conrm)
EnsureyouuseJoulecopperoverowanddischargevesseltorecoveruidfromsafetyvalve (conrm)
Water Quality
Water sample visually inspected and no signs of contamination visible (yes/no)
Wheninstallingthesolarsystemitisimportanttocheckthequalityoftheexistingincomingwatertothehot
watercylinder.Ifyouareindoubtastoitspurityasampleshouldbesentotothedepartmentofhealth
for testing.
FireSafety
Ensurethatthereisnoobviousrisktorepreventionbyinstallingthesolarsystem. (conrm)
Ensurethatallwiresarenotindirectconnectionwithanyun-insulatedpipeworkorplantthatcouldcausea
riskofburning
(conrm)
Legionella / Bacterial Growth
Ensurethatthereisnodeadlegsintheexistingplumbingsystemthatcouldinducethegrowthoflegionella. (conrm)
Ensurethatthestatscontrollingtheboilerandthestatcontrollingtheimmersionaresetto60°Corabove. (conrm)
Ensurethattheclientunderstandstheriskoflegionellaandthestandardproceduresforreducingtherisk
of it forming. Also ensure that the client understands that you are their to install a solar thermal system and
thatyoudonottakeanyresponsibilityforauditingtheirhotwatersystemforriskoflegionnellaforming.
Thatyouwillendeavourtominimisetheriskofitformingbytheworkthatyoucarryoutbutanyexisting
riskshouldbedealtwithacertiedprofessional.
(conrm)
7
NAVITAS IN-ROOF
installation manual

Kit Components
Solar Pump Solar Controller SolarExpansionVessel
Standard Kit Components
SolarPanel&Proles
Piping Options
DN16DuoPipe DN20Pipe Stainless Tails & Copper
SolarFluid
8

Mounting Options
Optional Accessories
InstallationHoseMountingSet OverVoltageLightning 3/4”ThermostaticMixingValve
Cooling Vessel DischargeVessel
9
NAVITAS IN-ROOF
installation manual

Important Pre Installation Information
Sizing of safety equipment
Component sizes are relative to the volume of liquid in the system.
Pipe sizing(minimumof15mmdiameterpipeworkmustbeused)
Collector
Area (m2)
FlowRate
ltr/hr
PipeDiameter
CopperExternal
(mm)
Vissolis2Panel
(mbar)
Vissolis4Panel
(mbar)
Vissolis6Panel
(mbar)
2 120 15 8.54 1.18 4.11
3180 15 12.57 2.87 10.74
4 240 15 17.08 2.36 8.22
5 300 22 21.11 4.05 14.58
6 360 22 25.14 5.74 20.94
8 240 22 33.68 6.92 25.05
EXPANSIONVESSSELSIZING
Model Collector Area
(m2)
System Volume
(ltrs)
Static Height Vessel Size
Vissolis2Panel 4 17 2 24
4 17 4 24
4 18 6 24
4 19 8 24
Vissolis 3 Panel 6 17 2 24
6 17 4 24
6 18 6 36
6 19 8 36
Vissolis4Panel 8 19 2 36
8 20 4 36
8 22 6 36
8 24 8 36
10

Roof Mounting options (on-roof version only)
TheVissolisproductrangeisavailablewithachoiceofroofxingoptionstosuitmany
rooftypes,seediagrambelowforthemostcommonxings.Themostcommonx-
ings are illustrated and explained in the following section and may be easily secured
toslate,tileormasonrynishes.
Metal Roof Fixings
Joulealsosuppliesroofxingkitsformetalandothercommercialroofs.Twooptions
available utilise appropriate clamps so the fabric of the metal roof is not penetrated -
seepagexx.Notetheminimumandmaximumdistancesoneachxingkit.
Option Code Describtion
1a RF-PA-MT-BO-X Slopedroofboltkitoption
1b RF-PA-MT-SL-X Slopedroofslatemountingbracketoption
1c RF-PA-MT-TI-X Slopedrooftilemountingbracketoption
2 SOL-FRF-X-25 25°increaseroofinclinedbracket
3SOL-FRF-X-45 45°atroofinclinedroofbracket
X=2,3,4,5,6
1a
1b 1c
2
3
11
NAVITAS IN-ROOF
installation manual

Overview of materials
Single row (R1) / double - multiple row (R2+)
12

13
NAVITAS IN-ROOF
installation manual

Overview of materials
Single row (R1)
14

15
NAVITAS IN-ROOF
installation manual

Overview of materials
Double - multiple row (R2+)
16

Overview of tools
17
NAVITAS IN-ROOF
installation manual

Mounting Single row (R1)
18

19
NAVITAS IN-ROOF
installation manual

Mounting Single row (R1)
20
Table of contents
Popular Water System manuals by other brands

Clarus
Clarus Fusion Series owner's manual

Sime
Sime NATURAL 300/5.84 EV Installation and service instructions

ZURN
ZURN Z1335 Parts Assembly and Parts List

McDonnell & Miller
McDonnell & Miller Uni-Match WFE-24 instruction manual

Danfoss
Danfoss ThermoDual-FLS-COMBI quick guide

Everpure
Everpure Kleenware HTS-11 Specification sheet

Enapter
Enapter EL4.0 quick start guide

Vaillant
Vaillant Solar hot water systems System manual

Stratco
Stratco Solarcore G21520N66VE installation guide

Spectra Watermakers
Spectra Watermakers Ventura 150T MPC Installation and operating manual

LINDR
LINDR SODA PYGMY Instructions for use

Aquion
Aquion Micro Budget owner's manual