
18
ۣૐ ۞ইૐҴૐೠҴসӏѺ ಿ҃మ
5. Before Installation
DANGER
CAUTION
Thisboilermustbeinstalledbyqualiedprersonnelin
compliancewiththeapplicablelawsandregulations.in
general,theselawsandregulationsarethebasicgas
insatllationstandards,andallotherlocalregulations.
Isolatethemainssuppliesbeforestartinganyworkand
observeallrelevantsafetyprecautions.
5.1 Cleaning Primary System
▪Debrisfromthesystemcandamagetheboilerandreduce
efciency.Failuretocomplywiththeguidelinesfortheuse
ofwatertreatmentwiththeappliancewillinvalidatethe
applianceguaranteeandcontravenetheBuilding
Regulations.
▪Itisrecommendedthatyoutaprimarywatercleanserto
thesystem.KITURAMIrecommendsttingalterthatwill
helpremovebothmagnetiteandnon-magneticdebris.
5.2 Electrical Supply
▪Theappliancerequiresanearth230V~50Hzsupplyand
mustbeinaccordancewithlocalregulations.
▪Itmustalsobepossibletobeabletocompletelyisolate
theapplianceelectrically.Connectionshouldbeviaa3amp
doublepolefusedisolatingswitchwithcontactseparationof
atleast3mmonbothpoles.Alternatively,afused3Amp,
3pinplugandun-switchedsocketmaybeused,providedit
isnotusedinaroomcontainingabathorshower.
Itshouldonlysupplytheappliance.
5.3 Gas Supply
▪Thegasinstallationshouldbeinaccordancewiththelocal
codesandrelevantregulations.
▪Theconnectionofgassupplytotheboilerisa22mm
locatedattherearofthegasservicecock.
▪BoilerusingNaturalGas(NG)mustbeconnectedtoa
governedmeter.
▪LiquidPetroleumGas(LPG)mustbeconnectedtoa
regulatorproperly.
▪Ensurethatthepipeworkfromthemetertotheboilerisof
adequatesize,andthedemandsofanyothergas
appliancesinthepropertyaretakenintoconsideration.Itis
highlyrecommendedthatpipeofatleast22mmdiameteris
used.
▪Thegasservicecockincorporatesapressuretestpoint.
Theservicecockmustbeontocheckthepressure.
▪Themeterorregulatorandpipeworktothemetermustbe
checked,preferablybythegassupplier.
▪Ifyouusegasotherthantheonespeciedintheboiler
lowerrighthandratingplate,itmaycauseincomplete
combustionthatcancauseareoranexplosiveignition.
▪Whenusingagascontainer,placethecontainerinthecool
shadyplaceawayfromdirectsunlightintheoutdoorsandx
thecontainerproperlytopreventtipping.
5.4 Water Supply
Thisboilerissuitableforsealedheatingsystemonly.
▪Theboilerissuitableforsealedsystemonly.Themaximum
workingpressurefortheapplianceis3bar.
▪Allttingsandpipe-workfortheapplianceshouldbeof
thesamestandard.Ifthereisapossibilityoftheincoming
mainspressureexceeding3bar,particularlyatnight,thena
suitablepressurelimitingvalvemustbettedonthe
incomingposition.
▪Theboilerdesignedtoprovidehotwaterondemandto
multipleoutletswithintheproperty.Ifthereisarequirement
forgreaterdemands,forexampleiftheboilerhasseveral
bathroomsandcloakrooms,aventedorunventedhotwater
storagesystemmaybeused.
FLUSHINGTHESYSTEM
▪Fillthesystemwithcoldwaterandcheckforleaks.
▪Openalldraincocksanddrainthesystem.
▪Closedraincocksandaddasuitableushingagent
compatiblewithaluminumatthecorrectstrengthforthe
systemconditionsinaccordancewiththemanufacturer‘s
instructions.
▪ThepHvalueofthesystemwatermustbelessthan8or
theapplianceguaranteewillbeinvalidated.
▪Circulatetheushingagentbeforetheboilerisredup.
▪Runtheboiler/systematnormaloperatingtemperatureas
directedbythemanufactureroftheushingagent.
▪Drainandthoroughlyushthesystemtoremovethe
ushingagentanddebris.
▪Itmaybenecessarytouseapowerushingmachinetoaid
thecleansingprocedureinsomecircumstances.
▪Closethedraincocksandrellwithfreshwateranda
suitableinhibitor.
▪Ventanyairfromtheboilerandsystem.
NOTE:Watertreatment