Risk of damage for the cooling medium pump due to dry running! If it is possi le to
Risk of damage for the cooling medium pump due to dry running! If it is possi le to Risk of damage for the cooling medium pump due to dry running! If it is possi le to
Risk of damage for the cooling medium pump due to dry running! If it is possi le to
shut off the circuit to the equipment to e cooled, you must inst
shut off the circuit to the equipment to e cooled, you must instshut off the circuit to the equipment to e cooled, you must inst
shut off the circuit to the equipment to e cooled, you must install a ypass valve (can
all a ypass valve (can all a ypass valve (can
all a ypass valve (can
e ordered as an option) etween the feed and return to protect the cooling medium
e ordered as an option) etween the feed and return to protect the cooling medium e ordered as an option) etween the feed and return to protect the cooling medium
e ordered as an option) etween the feed and return to protect the cooling medium
pump.
pump.pump.
pump.
5.4
5.45.4
5.4 Making electrical connection
Making electrical connectionMaking electrical connection
Making electrical connection
It is imperative that you follow the instructions given elow:
It is imperative that you follow the instructions given elow:It is imperative that you follow the instructions given elow:
It is imperative that you follow the instructions given elow:
When carrying out the electrical installation, o serve all applica le national and regional regulations
as well as the regulations from the responsi le utility company. Electrical installation must only e
carried out y a qualified electrician who is responsi le for compliance with the existing standards
and regulations. The voltage and frequency of the connection must correspond to the values stated
on the rating plate.
The cooling unit must e connected to the mains via an all-pole isolating device. No additional tem-
perature control is allowed to e connected upstream of the cooling system on the supply side. In-
stall the pre-fuse cited on the rating plate (miniature circuit- reaker "K" characteristic or slow fuse) to
protect the ca le and equipment from short-circuits. The mains connection must ensure low-noise
potential equalisation. Cooling units must always e integrated into the uilding's equi potential
onding system. The conductor cross-sections of the power ca le must e selected according to the
rated current (see rating plate).
The cooling unit does not have its own overvoltage protection. Measures must e taken y the op-
erator at the supply end to ensure effective lightning and overvoltage protection. The mains voltage
must not exceed the tolerance of +6/-10 %. On three-phase units: The connection must e made
with the field rotating clockwise. The direction of rotation of the field can e measured at the connec-
tion terminals L1, L2 and L3. Connection with a clockwise rotating field ensures that all three-phase
motors rotate in the correct direction. In case of an integrated transformer (optional): Ensure correct
voltage connection on the primary side.
If you want to evaluate the fault codes for fault signals from the cooling unit using the alarm relay,
you must also connect an appropriate low-voltage ca le to terminals 3 – 8, see circuit diagram for
the relevant unit type. If the cooling system requires remote switching, terminals 1 and 2 can e
used for this purpose (see the circuit diagram for the relevant unit type) together with the appropri-
ate programming (parameter 18)
5.4.1
5.4.15.4.1
5.4.1 Connecting the power supply
Connecting the power supplyConnecting the power supply
Connecting the power supply
The units are prewired ready for connection in the factory and equipped with a twelve-wire connec-
tion ca le (length 2,5 m).
Make the electrical connection as per the electrical circuit diagram (see circuit diagram for the rele-
vant unit type).