
GENERAL
The luminaire should be recycled in the correct manner when it reaches the end of its life. Check
local authorities for where facilities exist.
If the batteries have been left in a discharged state for long period of time, we recommend that one or
more charge and discharge cycles are required. This should restore the battery to its full capacity.
The batteries in this luminaire are Nickel Cadmium and must be disposed of correctly. Please contact
the local authorities for the disposal of this toxic waste.
Clean with a soft dry cloth only, do not use aggressive cleaning products or solvents which may
damage the luminaire.
Fig 2
• Connect the battery to the circuit board via the plug and socket
• Resecure the front cover to the baseplate
• Switch on and check for correct operation
• Ensure the green LED is illuminated indicating that the battery is charging
• Before carrying out a full 3 hour duration test, ensure the luminaire has had at least 24 hours
charging time
WARNING
This product must be disconnected from the circuit if subjected to any high voltage or insulation
resistance testing. Irreparable damage will occur if this instruction is not followed.
Recommended routine test procedure in accordance with BS5266
Daily check – check that the status GREEN LED indicator is illuminated.
Monthly functional test – simulate a mains supply failure for approx. 30 secs by operation of
key switch or switching off a circuit breaker. Ensure normal supply is restored after test and the
indicator status LED is illuminated.
Twice yearly conduct a one hour duration test - simulate a mains supply failure for one hour
continuous test by operation of key switch or switching off circuit breaker. Ensure normal supply is
restored after test and the indicator status LED is illuminated.
Annual full three hour duration test - conduct a three hour continuous duration test. Simulate
a mains supply failure for three hour continuous test by operation of key switch or switching
off circuit breaker. Ensure normal supply is restored after test and the indicator status LED is
illuminated.
If the luminaire fails any of the above tests, please consult a qualified electrician. See overleaf for
test record sheet.
EMSUR
GENERAL INSTRUCTIONS
These instructions should be read carefully and retained after installation by the end user for future reference and
maintenance
These instructions should be used to aid installation of the following product:
EMSUR
SAFETY
•Installation of this luminaire should only be carried out by a qualified electrician or competent person to the
latest Building and current IEE Wiring Regulations (BS7671)
•Please isolate mains prior to installation/maintenance
•Check the total load on the circuit (including when this luminaire is fitted) does not exceed the rating of the
circuit cable, fuse or circuit breaker
•Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation
•Installing in areas where the temperature consistently drops below 0°C may shorten the battery life
•We recommend a minimum charge period of 24 hours before carrying out an emergency duration test
•This product is Class II double insulated
•This product is non-dimmable
•This product is IP20 rated
INSTALLATION
•Provide power to the required point of installation. Suitable IP rated junctions boxes should be used where
required
•Remove the baseplate by pressing the two retaining tabs on either side of the fitting (see Fig 1)
Fig 1
•Using the baseplate as a template, mark the location of the fixing holes, and drill the holes ensuring not to
infringe with any joists, gas/water pipes or electrical cables
•Ensuring correct polarity is observed, wire as shown in Fig 2
Fig 2
3