
LAARS Heating Systems
Table of Contents
i
SECTION 1 General Information
1.A Introduction.......................................................1
1.B Warranty...........................................................1
1.C ModelIdentication...........................................1
1.D Safety Notes.....................................................2
1.E Unit Overviews .................................................4
1.F Dimensions.......................................................7
1.G Unpacking and the Installation Kit....................8
SECTION 2 Locating the Unit
2.A Locating the unit...............................................9
2.B Correct Vent Distance from Outside Wall
or Roof Termination..........................................9
SECTION 3 Venting and Combustion Air
3.A General Venting.............................................. 11
3.B Combustion Air...............................................12
3.C Combustion Air From Room...........................12
3.C.1 Ducted Combustion Air...................................13
3.D Venting............................................................13
3.D.1 Common Venting............................................14
3.D.2 Venting Requirements Unique to Canada......14
3.E Locating the Vent & Comb Air Terminals........15
3.E.1 Side Wall Vent Terminal..................................15
3.E.2 Side Wall Combustion Air Terminal.................17
3.E.3 Vertical Vent Terminal.....................................17
3.E.4 Vertical Combustion Air Terminal....................17
3.E.5 Installations in the Commonwealth
of Massachusetts............................................17
3.F Common Vent Test .........................................18
3.G Outdoor Installation ........................................18
SECTION 4 Gas supply and Piping
4.A Gas Supply and Piping...................................20
SECTION 5 Water Flow Requirements
5.A Boiler Flow and Head Requirements..............22
5.B Water Heater Flow and Head Requirements..23
SECTION 6 Water Connection Boilers
6.A System Piping: ................................................
Hot Supply Connections.................................24
6.B Cold Water Make-Up......................................24
6.C Freeze Protection...........................................24
6.D Condensate Drain Trap ..................................25
6.E Suggested Piping Schematics........................25
SECTION 7 Water Connections
7.A Water Quality..................................................30
7.B Suggested Piping Schematics........................30
7.C Piping Requirements......................................30
7.E Water Flow......................................................32
7.D Condensate Drain Trap ..................................32
SECTION 8 Electrical Connections
8.A Installation Warnings ......................................33
8.B Main Power Connections................................33
8.C Pump Connections and Operation .................34
8.D Field Wiring.....................................................35
8.E Field Connections for Single Unit Installs.......36
8.F Field Connections for Lead / Lag Installs ......36
8.G Control Panel Layout......................................37
8.H Building Automation System Connections .....38
8.I Lead Lag Connections....................................39
8.J Wiring Diagrams.............................................40
8.K High Voltage Wiring Diagrams........................44
8.L Ladder Diagrams............................................51
SECTION 9 Navigating the Touchscreen
9.A The Touch Screen ..........................................58
9.B Using the Touch Screen .................................58
9.C Screen Menu Icons.........................................59
9.D VericationProcessfor
Safety Related Parameters ............................60
9.E Checking Individual Parameters.....................61
9.F ConguringParameters..................................62
9.G Setting the Date and Time..............................63
9.H CongurationMenus ......................................64
9.H.1 SystemIdentication&Access.......................64
9.H.2 CH-CentralHeatConguration.....................64
9.H.3 OutdoorResetConguration..........................64
9.H.4 DHW-DomesticHotWaterConguration .....65
9.H.5 WarmWeatherShutdownConguration ........65
9.H.6 DemandPriorityConguration .......................65
9.H.7 ModulationConguration................................65
9.H.8 PumpConguration........................................66
9.H.9 8.5.8PumpConguration...............................66
9.H.10 StatisticsConguration...................................66
9.H.11 High Limits......................................................66
9.H.12 Stack Limits....................................................66
9.H.13 Delta T Limits-.................................................66
9.H.14 Frost Protection..............................................67