
7
Step 02.
Attaching your rst layer.
First.
Using 2x planks 275 x 28 x 825mm
place them on top of the bearer
overhang and screw fix 3x screws 8g x
65mm into the premade base.
Panels should sit flush and square
with the premade base.
Next.
Screw fix 1x CLT plank (tongue on)
135 x 28 x 1790mm to the rear of the
premade base, securing it to both the
side panels
above and the premade base with
6x screws 8g x 65mm.
Note.
For strength, the
panels are staggered.