Installing LD PC-V10, PC-V10 Reverse:
1. Connect 2 PIN cable from controler (PWRSW) to Motherboard (POWER SW) where you
normaly connect power button from computer case.
2. With second 2 PIN cable connect 12V line from controler (CHK 12V) to Power Supply - PSU
12V line (Yellow cable and Black cable) or even better on motherboard 3pin fan connector.
3. Now when everything is done, press power button in the front of the case and you will see,
that controler/LCD will start counting down from 4 min to 0 min. Once it arrive to 0 min,
phase change will start working. When evaporator temperature reach -25c, controler
automaticly start PC and also start checking for 12V line. If everyting is connected right,
controler will recognize 12V line (if not turn 2 PIN cable for 180 to change + and -) from PSU
and PC will operate normaly. If your 12V line is not connected, phase change controler will
shut down phase change in 12 secoonds.
If
you
have
any
other
ques
tion
you
can
send
us
email
o
n:
[email protected] or
contact
shop
where you bought it.