
LEMA Off-Grid User Manual (DM-003-A)
© 2021 LEMA - lema.io
Saint Paul, Minnesota, USA
Page | 6
Figure 5-2 - Footing Assembly 40
Figure 5-3 - Solar Tracker Footing Hole Dimensions 41
Figure 5-4 - Footing Orientation in hole/concrete 41
Figure 5-5 - Install PVC Tubing 42
Figure 5-6 - 5.3.2 LEMA Off-Grid Electrical Enclosure Concrete Pad Dimensions 42
Figure 5-7 - LEMA Off-Grid Electrical Enclosure Setup on Concrete Pad 43
Figure 5-8 - LEMA Off-Grid Electrical Enclosure Base Rear Cover Bolt Locations 44
Figure 5-9 - LEMA Off-Grid Electrical Enclosure Base Rear Cover Removed 44
Figure 5-10 - Cable Bundle Between Solar Tracker and LEMA Off-Grid Electrical Enclosure 45
Figure 5-11 - Electrical Connections in Base of LEMA Off-Grid Electrical Enclosure 46
Figure 5-12 - Solar Tracker Power and Data Cable Connector 46
Figure 5-13 - 8' Copper Ground Rod Location 47
Figure 5-14 - Installed 8' Copper Ground Rod 47
Figure 5-15 - Mast Mounted on Concrete 48
Figure 5-16 - Align Mast North & South 49
Figure 5-17 - Align the Lower Linear Motor Season Mounting Point North-South 49
Figure 5-18 - Goal Post mount on Mast 50
Figure 5-19 - Mounted Linear Motor Season 51
Figure 5-20 - Mounted Yard on Goal Post 52
Figure 5-21 - Mounted Linear Motor Day 53
Figure 5-22 - Pre-Assembly of the PV Racking Yard Support 54
Figure 5-23 - Post-Assembly of the PV Racking Yard Supports 54
Figure 5-24 - Pre-Assembly of the PV Racking Side Supports 55
Figure 5-25 - Post-Assembly of the PV Racking Side Supports 56
Figure 5-26 - Identification of the 3x unique PV Racking Center Support 57
Figure 5-27- Pre-Assembly of the PV Racking Center Supports 58
Figure 5-28 - Post-Assembly of the PV Racking Center Supports 58
Figure 5-29 - PV Disconnect Switch Location 59
Figure 5-30 - Pre & Post-Assembly of the PV Disconnect Switch 59
Figure 5-31 - PV Panel Orientation on the PV Racking 60
Figure 5-32 - Pre-Assembly of the PV Panels 61
Figure 5-33 - Post-Assembly of the PV Panels 61
Figure 5-34 - PV Panel Aluminum Grounding Lug Locations 62
Figure 5-35 - PV Panel Aluminum Grounding Lug Location (Right) 63
Figure 5-36 - PV Panel Aluminum Grounding Lug Location (Left) 63
Figure 5-37 - PV Disconnect Switch Cover Bolt Locations & Pre-Disassembly 64
Figure 5-38 - Post-Disassembly PV Disconnect Switch Cover 64
Figure 5-39 - Pre & Post-Assembly of the Solar Tracker Controller 65
Figure 5-40 - Orientation of the Solar Tracker Controller on the Goal Post 65
Figure 5-41 - Solar Tracker Controller Cables 66
Figure 5-42 - Day Axis Limit Switch Location & Routing Path 67
Figure 5-43 - Wire Routing along Mast and Goal Post 68
Figure 5-44 - Wire Routing along the Goal Post, Yard, and PV Racking 69
Figure 5-45 - Copper Braid Routing Locations 70
Figure 5-46 - Excess Copper Braid on PV Panel #1 70
Figure 5-47 - PV Disconnect Wire Routing 71