Page 7 of 13
GEARCAGE MODELS INSTALLATION
The following steps are intended for Landing Gear installation on Lets Go Aero brand GearCage, BlackBox, BigBox, &
Moover Cargo Carriers only.
For installation of Landing Gear on GearSpace and GearDeck Cargo Carriers refer to Page 2 of this manual.
STEP 1
STEP 2
The included Landing Gear Legs [A] are shipped in the
Nested position [Figure 1]. For assembly, the Legs must
be moved to the Deployed position [Figure 2].
For each Leg [A], pull the nested Legs outward to release
the spring loaded Engagement Tab [Figure 3].
Once released, swing to the Deployed position. [See Page
11 for more information on Landing Gear Nesting and
Deployment operation.]
Attached the one (1) Channel [B] by aligning the two (2) slots with the
holes on top of the Landing Gear Leg.
Using the hole located on the engagement side of each Landing Gear
Leg [A] fasten the Leg to the Channel using (1) 3/8” x 1” Bolt (LG)
[G], one (1) Nylon Spacer [F], one (1) 3/8” Washer [J], and one (1)
3/8” Nylock Nut [K] per Landing Gear Leg.
NOTE: The Nylon Spacer [F] should be installed between the
Channel [B] and the Landing Gear Leg [A] as shown. [Figure 4].
On the hole located Smooth
Side of each Landing Gear Leg,
fasten the Leg to the Channel
using (1) 3/8” x 3/4” Bolt (LG)
[H], one (1) 3/8” Washer [J], and
one (1) 3/8” Nylock Nut [K] per
Landing Gear Leg.
NOTE: Bolts should be
fastened in the slots so they are
positioned as far as possible
from the edge of the Channel [B]
as shown. [Figure 5]
Nested Deployed
[Figure 3]
[Figure 4]
[Figure 5]
[Figure 1]
[Figure 2]
A
A
A
A
F
J
K
K
H
J
B
G
Engagement
Tab
TOOLS REQUIRED: 9/16IN SOCKET & WRENCH
ENGAGEMENT
SIDE
SMOOTH
SIDE