3 –Installation and use
• Before to power the device, be sure that the power supply voltage is equal to the value indicated on the labels of the
device, between –10% and +5%.
• Use only sockets made according security regulations.
• Be sure to ground terminal #1.
• With correct supply, the front green lamp must be always on; the front red lamp is on when the internal relay is on, in
presence of water between the electrodes.
• The wiring to the 395, 600 and 700 series probes can be made using unshielded cables, with copper section higher than 1
mmq. Signal cables and power cables, doesn’t run parallel. For standard and low sensitivity a.c. switches, and for all d.c.
models, cable length can be up to 200 m. For high sensitivity, cable length must be as short as possible; in particular for 1÷20
S models, the maximum length must be 40 m; for 0.3÷2 S models, the maximum length must be 10 m.
• Electrodes must be separate: a separator is available on request.
• Do not connect to the internal relay a load higher than 5 A (resistive load) at voltage higher than 230 V. a.c. 50/60 Hz
• Sensitivity and time delay (201 only) adjustment:
• The standard switches are factory set to 30S integral sensitivity, using the internal trimmer: sensitivity increases by
clockwise rotation .
• Only levels switch series 201 are factory set to a delay of 5"; the delay trimmer allows delay between 0.5” to 15”, rotating
clockwise.
• For levels switch series 201, you can choose if the delay may be delayed-to-on or delayed-to-off, simply moving the jumper
between the trimmer: right (for delayed-to-off) or left (for delayed-to-on).
This adjustment should be made in the absence of power supply.
delayed-to-on: the internal relay switchs ON only after the water level remains above the selected level
(MAX) for all the time set.
delayed-to-off: the internal relay switchs OFF only after the water level remains below the selected level
(MIN) for all the time set.