
Natural Gas
6282 By-Pass Procedure
3/223210-625
Valve Rating 25 PSIG | Ball Style Instructions
NOTE: These valves are designed for use with natural, manufactured or LP gas only.
INTEGRAL VALVE FEATURES
1. Valves can be locked in "NORMAL FLOW" (through the meter) or in "BYPASS MODE" to prevent unwanted operation.
2. The bypass meter bars are designed to provide uninterrupted gas service during gas meter maintenance. The ability to maintain
gas ow to the home comes from the valves' oversized ports, which allow for a minimum-ow condition during valve operation.
1. Read instructions and reference pressure rating on integral valves before valve installation or maintenance of meter bar.
2. Inspect valves and remove any foreign material.
3. Always apply a quality grade pipe thread sealant to the pipe before installation - do not use teon tape. Excess pipe sealant contacting the plug surface
may cause the valve to leak.
4. Always wrench nearest to connection point. Never insert a tool into the port area of the valves to thread bar onto the pipe. Incorrect tightening or
overtightening of the bar on installation can cause valve failure.
5. Installation torques should be reduced when using pipe heavier than schedule 40.
6. Reference the bypass procedure shown below and on reverse side. DO NOT INSTALL IN A CONFINED SPACE.
7. Lock the valves to prevent unwanted operation or access.
WARNING: This product can expose you to chemicals including lead, which is known to the State of CALIFORNIA to cause cancer and birth defects or other reproductive harm. For more
information go to: www.P65Warnings.ca.gov.
PORT
PORT
INSULATED UNION ENDS
A.Y McDonald's O-ring or at gasket design insulated end assures positive sealing and long lasting service.
The insulated end is properly assembled to the head piece by tightening the union nut hand tight plus 1/4 to 1/2 turns.
CAUTION -EXCESSIVE TIGHTENING COULD CAUSE LEAKAGE.
O-RING DESIGN
If the O-ring is removed from the end piece, it can easily be replaced as follows:
1. Lay O-ring in groove - do not force it in with your ngers. A coat of petroleum jelly should be applied to the O-ring after assmbly into groove.
CAUTION - O-RING AND GROOVE MUST BE FREE OF FOREIGN MATERIAL.
2. Hand tighten the union nut onto the head piece to uniformly press the O-ring into the groove.
3. This uniform pressure of the meeting of the head piece and end piece will properly seat the O-ring.
4. Remove head piece and inspect to verify O-ring is in place.
SHUT OFF POSITION
WARNING: This position will shut-off the ow of gas and require shut-off
procedure and pilots re-lit.
To stop the ow of Gas to meter and structure, turn valves to Position 2 & 4.
2
3
4
1