Quick Installation Guide –MS657023X
©2019 MICROSENS GmbH & Co. KG –Hamm/Germany www.microsens.com V1.0-1943-SH
Please consider the following wiring requirements:
Wire range: 0.5 mm² to 2.5 mm²
Solid wire (AWG): 12-24
Stranded wire (AWG): 12-24
Torque: 5 lb-In / 0.5 Nm / 0.56 Nm
Wire Strip length: 7-8 mm
Max wire length: 3m (9.84 ft)
WARNING: Any exceeded input voltage will not make this
unit function and may damage this unit.
WARNING: Always ground the power source to maintain a
clean power input.
Installation
DIN-rail Mounting
The device is intended for DIN-rail mounting. The DIN-rail
adapter is placed at the rear side.
Mounting Steps
STEP 1: Hook the unit over the DIN rail. If the VDSL interface
is used for the connection between two buildings, all neces-
sary protective measures must be ensured externally.
STEP 2: Push the bottom of the unit towards the DIN-rail
until it snaps into place.
Removal Steps
STEP 1: Push the unit down to free the bottom of the DIN-
rail.
STEP 2: Rotate the bottom of the unit away from the DIN-
rail.
STEP 3: Unhook top of unit from DIN-rail.
Wall Mounting
For wall-mounting the DIN-rail adapter must be removed. At
the rear side, two mounting holes are placed which can be
used for horizontal or vertical wall-mounting.
Installation Procedure
STEP 1: Configure both GBE (Gigabit Ethernet) extenders by
using the DIP switch. For point-to-point applications, one unit
must be configured as master (OT) and the other one as
slave (RT).
STEP 2: Connect the device to earth.
STEP 3: Connect the GBE extender configured as slave with
a regular cat. 5 cable to the LAN (Local Area Network).
STEP 4: Power on the GBE extender by connecting the power
terminal.
STEP 5: Connect both GBE extenders via the VDSL port.
STEP 6: Connect the LAN port of the second GBE extender
(master) with a regular cat. 5 cable.
STEP 7: Power on the second GBE extender
Precautions and
Safety Warnings
Disconnect all power from devices before attempting in-
stallation!
This device is intended for installation only in re-
stricted access locations as defined where both these
conditions apply:
oAccess is through the use of a lock or tool and
key, or other means of security, and is controlled
by the authority responsible for the location.
oAccess can only be gained by service persons or
by users who have been instructed about the
reasons for the restrictions applied to the loca-
tion and about any precautions that shall be
taken.
All electric installations must be carried out in accord-
ance with local and national regulations.
Do not work on the system, connect or disconnect ca-
bles during periods of lightning activity.
The equipment must be connected to earth.
Shield of RJ-45 cables has to be connected to the same
earth potential as the equipment.
If the VDSL interface is used for the connection between
two buildings, all necessary protective measures must
be ensured externally.
This equipment relies on the building’s installation for
short-circuit (overcurrent) protection. Ensure that a
fuse or circuit breaker no larger than 1 A is used.