
2 INSTALLATION INSTRUCTIONS
WIRING
The main power feed and distribution
wires, connected to the large terminals,
must be sized according to the Wire
Size Selection Guide on Page 1. All
other wires (ground and activation /
deactivation) can be 18-22 AWG.
1. Connect the small right terminal,
marked “G”, in the lower level to a
good engine ground (Figure 2)
.
WARNINGS: Attach the power wire
to the BATT terminal
before connecting it to
the battery post.
Remove the power wire from the
battery post before removing it from
the BATT terminal
Figure 2 Solid State Relay.
Figure 3 12V Activation.
Figure 4 Ground Activation.
2. Securely connect the BATT terminal to the positive
battery post. Use the wire size selection guide to
choose the appropriate wire.
3. Each output branch can be activated by one of two
congurations, ground or 12 volts.
Note A: The lower right terminal marked “G” must be
grounded for either conguration (Figure 3 & 4).
Note B: 12V Activation - apply 12V to the appropriate
upper level terminal, 1-4 (Figure 3).
Note C: Ground Activation - apply ground to the
appropriate lower level terminal, 1-4 (Figure 4).
A Loctite® Threadlocker 242® packet is
included to fasten all threaded screws.
It will penetrate the thread grooves, and bond
within 10 minutes. The medium strength bond
can be broken with hand tools, if necessary.
Apply only a small amount of Loctite 242 onto
the thread of each of the 5 screws.
Do not apply too much Loctite.
OUTPUTS
(LABELED 1-4
STATUS LEDS
BATTERY INPUTS
LABELED 1-4)
LOWER LEVEL TERMINALS
FOR GROUND ACTIVATIONS GROUND
UPPER LEVEL TERMINALS
FOR 12V ACTIVATIONS
MOUNTING TAB
CAN BE ROTATED 90O
12V
SWITCHED
ACTIVATION
(1 THRU 4)
GROUND
12V
12V
SWITCHED
ACTIVATION
(1 THRU 4)
GROUND
GROUND
NOTE: THIS GROUND IS REQUIRED
REGARDLESS OF WHETHER
THE INDIVIDUAL CHANNELS
ARE ACITVATED WITH +12V
OR GROUND
NOTE: THIS GROUND IS REQUIRED
REGARDLESS OF WHETHER
THE INDIVIDUAL CHANNELS
ARE ACITVATED WITH +12V
OR GROUND