RAIL SUPPORT
BRACKETS DOWELS FIXED SHELF KICK
TAKE YOUR GABLES AND LAY THEM
OUT FLAT, YOU SHOULD HAVE
2 X TOP & 2 X BOTTOM GABLES.
USING A LITTLE WOOD GLUE
(NOT SUPPLIED) IN YOUR RE-DRILLED
HOLES, INSERT YOUR WOOD DOWELS
INTO 2 OF THE HOLES AND PUSH
YOUR TOP INTO YOUR BOTTOM
GABLE.
NEXT STEP:
ALIGN YOUR SHELVES AND KICK TO THE LEFT-HAND GABLE, SCREW
THEM INTO PLACE, ATTACH YOUR RIGHTHAND GABLE AND DO THE
SAME.
FOLD OUT BOTH TOP AND BOTTOM BACKS PROCEED TO
NAIL THEM INTO POSITION MAKE SURE YOU HAVE SLID
THE ‘H’MOULD YOU MAY PROCEED NAILING MAKING
SURE YOU ARE SQUARE AT ALL TIMES.
YOU WILL NEED 2 X 5/8 x 6 WOOD
SCREWS FOR THE NEXT STEP.
TAP INTO POSITION YOUR FLANGES
INTO THE HOLES PROVIDED IF YOU
WISH YOU CAN SCREW IN 1 SCREW
INTO THE MIDDLE OF THE FLANGE
AND SLIDE YOUR HANGING RAIL.
INSERT YOUR 4 PINS INTO THE
HOLE NO: THEN INSERT THE
CAMS INTO THE HOLES
PROVIDED ON YOUR SHELF .
USING SCREW DRIVER TWIST
CAM INTO LOCK POSITION.