National LOCHLYN User manual

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
Read these instrucons before using this
product. Failure to follow the instrucons
and safety precauons in this manual can
result in injury or damage to equipment.
KEEP THIS MANUAL IN A SAFE PLACE
FOR FUTURE REFERENCE
All frame units from three (3) ers through
six (6) ers are required to be permanently
anchored to the oor (see Floor Anchoring
Method pgs. 7 - 8; steps F1-F7) or wall (see
Wall Anchoring Method pgs. 9 - 12; steps
W1-W9), regardless of conguraon, usage,
or if mulple units are ganged together.

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
2
TOOLS REQUIRED
IMPACT DRIVER OR DRILL DRIVER
#2 PHILLIPS BIT
TOOLS REQ. (FLOOR ANCHORING)
HAMMER DRILL
DRILL DRIVER
TOOLS REQ. (WALL ANCHORING)
IMPACT DRIVER OR DRILL DRIVER
9/64” DRILL BIT
HARDWARE
M4 X 12MM THREAD FORMING
SCREWS
QTY VARIES BY MODEL
JUNCTION BLOCKS
QTY VARIES BY MODEL
PLASTIC CAPS
QTY VARIES BY MODEL
HARDWARE (FLOOR ANCHORING)
SEE PG. 8 FOR RECOMMENDATIONS
HARDWARE (WALL ANCHORING)
M4 X 12MM THREAD FORMING
SCREWS
QTY VARIES BY MODEL
STEEL 90 DEGREE BRACKETS
QTY VARIES BY MODEL
3/16” X 11” FLAT NYLON STRAP
QTY VARIES BY MODEL
SEE PG. 10 FOR WALL FASTENER
RECOMMENDATIONS
1
Unpack frame sub-assembly secons and spread out for access and idencaon in
the later steps of assembly (Figure A).
Model Assembly Instrucon Sheet (“Model AI Sheet”)
includes frame dimension references and parts list for
specic model.
2
Select a frame sub-assembly and move to work area.
Lay the assembly horizontally on the worksurface. Note
the 3-hole paern features (Figure B) at the dierent levels.
Retrieve the juncon blocks (Figure C) and posion one at
each 3-hole paern so that the protruding features (bosses)
engage the upper and lower hole of each paern (Figure D).
The protruding (boss) features will be a press t into the
holes.
FIGURE B
3
Retrieve the pack of screws from the hardware
kit. At each juncon block, start and ghten a
screw through the cavity in the juncon block (Figure
D) and into the frame. This will secure the block to the
vercal frame secon.
CAUTION: An impact driver may be used but
excessive driving can strip the threads in the frame.
Stop driving immediately after there’s audible impacts
to avoid stripping the screws. If a drill driver is used, a
lower clutch setting should be used to avoid stripping
the screws.
FIGURE A
FIGURE C
FIGURE D
bosses

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
3
FIGURE F
4
If applicable, ip over frame secon (Figure E) and repeat steps 2 & 3 for any 3 hole
paerns on the 2nd side (Figure F).
5
Repeat steps 2-4 on remaining frame
secons. All three-hole paerns must have a
juncon box screwed in as noted in step 3. There
shouldn't be any remaining juncon blocks from
the hardware bag or open 3 hole paerns aer
these steps are complete (Figure G).
6
Retrieve the Model AI Sheet with image of
assembled unit. Use this to idenfy the
posion of each sub-assembly with respect to the
nished unit. Arrange the sub-assemblies in that
order on the ground to facilitate assembly of the
horizontal bars (Figure H).
Note 1: End assemblies only
have junction blocks on one
side.
Note 2: For each horizontal
frame section, there will be a
matched pair of junction blocks
on either side of the frame.
Note 3: The sub-assemblies
should be oriented so that the
glides will be at the bottom of
the assembled unit.
FIGURE G
FIGURE E
FIGURE H

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
4
7
Begin with one of the end frame secons and place the appropriate horizontal bars
over the juncon blocks (Figure I).
Note 1: Ensure the horizontal bars are aligned properly. The extruded lip (if applicable)
should face the interior of the frame section and the counter sunk holes should face
down towards the glides.
Note 2: On some frame units, there are different length horizontal bars from one column
to the next. Reference the Model AI Sheet to determine which length bar is correct.
CAUTION: Do not deviate from the provided Model AI Sheet and install dierent
frame lengths to dierent columns. This will cause issues with installaon of modules
and shelves and will make the unit unstable.
8
Start and ghten a screw through the horizontal bar
into the juncon block to secure the bar to the
frame (Figure J). Install all bars to this sub-assembly
secon.
CAUTION: An impact driver may be used but
excessive driving can strip the threads in the block. Stop
driving immediately after there is audible impacts. If a
drill driver is used, a lower clutch setting is
recommended. Stripping the threads in the junction
blocks will render the unit unstable.
FIGURE J
FIGURE I
Note 1:
Note 1:

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
5
9
Lay the next secon of frame overtop of the horizontal bars of the previous secon.
Starng from one end, push the horizontal bars around unl the protruding (boss)
features of the juncon blocks are fully inserted into the holes of the horizontal bars.
Work your way down the levels unl all juncon blocks are fully secured to the
horizontal bars of the frame. The vercal
sub-assembly should be ush with the
horizontal bars of the frame (Figure K).
Note: While assistance is helpful and
advisable for building frame units, once
the frame section to be installed is
positioned on top of the horizontal
members, it is easier if only one person
adjusts the bars to seat the blocks into
the frame. During this step, others
helping should act as spotters.
11
Repeat steps 7-10 unl all
horizontal bars and sub-assembly
secons are installed. Ensure all
horizontal bars and sub-assembly secons
are in correct alignment (Figure M).
FIGURE K
10
Install screws at each of the
juncon blocks to secure the
sub-assembly to the frame
(Figure L).
FIGURE L
FIGURE M

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
6
12
With all frame secons installed, carefully stand the frame assembly upright
onto its glides (Figure N).
FIGURE N
14
Posion frame unit in nal installaon locaon and level the unit with the glides
by extending them no further than their midpoint.
CAUTION: Do not extend glides beyond 13mm (0.5in) from the glide’s fully
retracted posion. Extending glides more than 13mm (0.5 in) can make the shelving unit
unstable.
If installing a one (1) or two (2) er unit, this completes installaon of the frame. If
installing a three (3) through six (6) er unit, connue to Anchoring Requirements.
All frame units from three (3) ers through six (6) ers are required
to be permanently anchored to the oor (see Floor Anchoring
Method pgs. 7 - 8; steps F1-F7) or wall (see Wall Anchoring Method
pgs. 9 - 12; steps W1-W9), regardless of conguraon, usage, or if
mulple units are ganged together.
13
Install plasc caps from hardware bag
on the top of each vercal secon
(Figure O).
FIGURE O

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
7
ANCHORING REQUIREMENTS
Wall anchors are only to be used when unit is parallel to the wall. Floor anchoring must
be used for perpendicular layouts. If choosing the wall anchoring method, the floor
anchor plates can be removed from the unit.
All frame units from three (3) tiers through six (6) tiers are required to be permanently
anchored to the wall (see Wall Anchoring Method) or floor (see Floor Anchoring
Method) regardless of configuration, usage, or if multiple units are ganged together.
WARNING: Tip Over Hazard. Do not install drawer modules above the third (3rd)
tier. Installaon of drawers above three (3) ers can lead to instability and injury from
unit pping over.
Floor Anchoring Method
All frames will have at least four (4) anchor plates mounted to the floor glides on both
end frame sections. 90” and 96” units must have six (6) floor anchor plates total.
90” units have two (2) additional floor anchor plates on the interior sections. One (1) on
each section that are mounted on the opposite sides from the other (Figure P). If both
plates are on the same side. Uninstall one (1) plate and re-install it to the glide on the
opposite side. 96” units have two (2) additional floor anchor plates; both are mounted
on the middle section (Figure Q).
See Model AI Sheet for reference
on anchor plate.
Contact Customer Service if
anchor plates are missing or
damaged. Do not install frames
with less than the required
number of plates.
WARNING:
Tip Over Hazard. Do not install
shelves, modules, or tops onto the
frame until it is leveled and
permanently anchored.
Installaon before permanent anchoring can lead to instability and injury from unit
pping over.
FIGURE P
FIGURE Q

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
8
FIGURE S
F1
Anchor plates can be mounted with either a bolt or screw depending on the
sub– floor. See table (Figure S) for recommended hardware for various floor
types. If there are any questions concerning floor types, consult an architect or structural
engineer.
Note 1: Anchor plates can be
mounted in any position about the
glide to which they are attached.
Note 2: There are two mounting
locations on the anchor plate. The
thru hole is sized for #8 screws and
the slot is sized for 1/4” bolts and
screws, as described in the
recommended fastener table below.
Note 3: To minimize visual impact of required anchors, align the anchor plate in-line and
directly underneath the cross-bar of the sub-assembly frame section, that runs front to
back. A bolt is required in this scenario as there is wrench access only.
F2
With frame in final installed location, position the anchor plates where they are
to be installed.
Note: If joining multiple units with a ganging kit, build and position all frames in their
final location, then install ganging kits prior to anchoring.
F3
Mark locaons to drill out pilot holes for each of the anchor plates.
F4
Move frame out of the way and drill appropriate pilot holes for the fastener
selected. (If applicable) start concrete anchors into pilot holes.
F6
Install anchor fasteners to clamp down anchor plates and nish the installaon.
The frame is ready for use at this point.
F5
Reposion frame back into nal installaon locaon. Check that the frame is
sll level and adjust if necessary.
Note 3: Align
under frame Note 2:
Thru hole
Note 2:
Slot hole
Note 1: One anchor plate mounted
in any posion about the axis of the
FIGURE R

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
9
Wall Anchoring Method
WARNING: Tip Over Hazard. Do not install shelves, modules, or tops onto the frame
until it is leveled and permanently anchored. Installaon before permanent anchoring
can lead to instability and injury from unit pping over.
Wall anchors are only to be used when unit is parallel to the wall. Floor anchoring must
be used for perpendicular layouts. If choosing the wall anchoring method, the floor
anchor plates can be removed from the unit.
All frame units from three (3) tiers through six (6) tiers are required
to be permanently anchored to the oor (see Floor Anchoring
Method pgs. 7 - 8; steps F1-F7) or wall (see Wall Anchoring Method
pgs. 9 - 12; steps W1-W9) regardless of conguraon, usage, or if
mulple units are ganged together.
Note 1: National defines a structural wall as a load-bearing wall constructed of materials such as:
poured concrete, concrete block, or studs. Wood studs must be a nominal 2" x 4" size minimum.
Metal studs must be “C” channel, 20-gauge thick minimum. Metal or wood studs must be on
centers no greater than 24" and have maximum height of 14’ restrained at oor and ceiling.
Interior walls shall be designed to resist not less than a force of 5 lbs. per square foot applied
perpendicular to wall. The deecon of such wall under a load of 5 lbs. per square foot shall not
exceed 1|240 of the span for walls with brile nishes, and 1|120 of the span for walls with
exible nishes (per uniform building code secon 2390B). If you have any quesons concerning
your load-bearing structures, please consult your architect or structural engineer.
All frames will have one (1) wall anchor hardware set per vertical upright frame section, included in
the hardware kit. All wall anchor sets must be attached to a stud, or drywall or concrete anchors.
Note 2: If joining mulple units with a ganging kit, build and posion all frames in their nal
locaon, then install ganging kits prior to anchoring.
Contact Customer Service if wall anchor hardware is missing or damaged. Do not install frames
with less than the required number of anchors.
Note 3: Align the wall anchor plates behind the vertical frame members (Figure T) to reduce
visibility. However, if necessary to attach an anchor properly to a wall stud, the wall anchor
brackets can be installed horizontally (Figure U), where a small portion of the bracket will be visible.
FIGURE T FIGURE U

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
10
W1
Reference fastener table (Figure V) for recommended hardware for various
wall construcon types. Select the hardware and install to the wall using all of
the wall anchors provided following the next steps.
FIGURE V
W2
Aach one (1) bracket to each aluminum vercal frame secon on the back of
the unit, one (1) inch from the top of the vercal tubing (Figure W), by drilling a
9/64” pilot hole into the vercal frame. Fasten the mounng bracket to the frame using the
M4x12mm screw provided.
FIGURE W

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
11
W4
Mark the wall to locate the wall brackets vercally in line with the frame
tubing, or horizontally where necessary to reach a stud.
W3
Carefully orient the freestanding frame unit with the frame-back towards
the wall and posion in the approximate installed locaon. Level the unit
while adjusng to the nal install posion.
FIGURE X

If you have any questions concerning these instructions, please call National Customer Service 800.482.1717.
Assembly Instrucon
1610 Royal Street
Jasper, Indiana 47546
Telephone 800.482.1717
Fax 812.482.8800
www.NationalOfficeFurniture.com
3248959
Rev, B
LOCHLYN
FREESTANDING FRAME
BUILD
12
W5
Aach the wall anchor bracket to the wall using the wall fastener selected
(with reference to the hardware recommendaon in secon W1), 1 3/4”
from the mounng bracket fastener that is secured to the back of the unit (Figure Y).
W6
Reposition the freestanding frame into the final installation position so all
mounting brackets are in line vertically, or horizontally, based on required
installation orientation. Check that the frame is still level and wall anchor brackets align
and adjust if necessary.
Note: The unit shall be no greater than three (3) inches from the wall to properly lace
and lock the restraint strap.
W8
Conrm restraint strap is securely laced and locked and nish the
installaon. The frame is ready for use at this point.
W7
Insert the end of the wall anchor restraint strap through the hole on the end
of both brackets. Bring both ends of restraint strap together and slide the
at end through the locked end with smooth strap surface facing outward (Figure Z) and
pull it through unl all slack is removed.
FIGURE Y
FIGURE Z
Other manuals for LOCHLYN
1
Other National Rack & Stand manuals