)NSTALLATION'UIDE
NETGEAR RangeMax™ Wireless USB 2.0 Adapter WPN111
These setup instructions assume that you will connect to an access point or wireless router.
Estimated Completion 10 minutes.
Installation
1. First, install the WPN111
software.
Insert the NETGEAR CD. If the CD main
page does not appear, double click
Autorun.exe on the CD.
a. Click Install the Software. The Check
for Updates window opens.
b. If you are connected to the Internet, click
Check for Updates. If not, you can
choose to install from the CD.
c. Follow the Wizard steps and click Next to continue.
When the software has been installed the Connection Wizard prompts you to shut
down the computer.
2. Now, connect the wireless USB
adapter.
a. Locate an available USB port on your PC.
When prompted, shut down the computer.
b. Connect the USB cable to the WPN111 and
insert the other end of the cable into the
USB slot on your PC. See “Placing the
USB Adapter Cradle”on the other side of
this card.
c. Restart your computer.
d. You will be prompted to select the country where you are located.
e. Select the country and click Agree.
3. Use the Smart Wizard to set up your wireless USB adapter.
a. Windows 2000 users go to Step b. Windows
XP or Vista users can set up the wireless
adapter either with the NETGEAR Smart
Wizard (recommended) or the Windows
configuration utilities.
•NETGEAR Smart Wizard: Reveals
more information about each network
and makes it easier to troubleshoot
network connection problems.
•Windows configuration utilities: See the Windows documentation or
“Using Windows XP and Vista Wireless Configuration Utilities” at:
http://documentation.netgear.com/reference/enu/winzerocfg/index.htm.
b. Click Next to accept the NETGEAR Smart
Wizard.
You will be prompted to let the
wizard help you connect to a network
(recommended).
c. Click Next to accept.
4. Connect to a wireless network.
a. Select the wireless network from the drop-
down list, and the wizard records your
choice.
Note: Hidden networks do not broadcast
the Network Name (SSID). These networks
are in the drop-down list, but the Network
Name (SSID) is blank.
If the network uses security, then the Smart
Wizard detects it.
b. Follow the Wizard steps for Security (if used) and for saving a Profile.
c. After you have reviewed the settings, click Finish.
The WPN111 icon appears in the system tray and on the desktop; and the Settings
page opens. The wizard initiates your wireless connection. It could take up to a minute for
your wireless connection to be established. Check the status bar.
Using the Status Bar
The status bar is located at the bottom of the Settings page.
Understanding the Status Bar
Wireless network Identifies which wireless network you have joined.
Security • Locked: security enabled.
• Unlocked: security not enabled.
Channel The wireless channel used by the network. If many wireless networks
in your area use the same channel they can interfere with one
another.
Throughput Wireless throughput measured in Mega bits per second.
For best performance, connect the WPN111 to a USB 2.0 port. With
a USB 1.1 port the WPN111 throughput is limited to the 14 Mbps of
the USB 1.1 standard.
Signal strength More dots indicates a stronger signal. Usually, you will experience
higher throughput when the signal is strongest.
Find a Network Click Find a Network to open the Connection Wizard.
Connection
status Identifies the status of your network connection.
•Connected to Internet: Wireless Internet connection is OK.
•Connected to Router: Wireless connection to the router is OK but
the router is not connected to the Internet.
•169.254.x.x or ___.___.___.___ : The wireless connection to the
router is OK but there is a problem with the router. See the online
help or the NETGEAR RangeMax Wireless USB 2.0 Adapter
WPN111 User Manual on the NETGEAR CD for troubleshooting
tips.
Wireless
network
Connection status
Security
Find a Network
Channel Throughput
Signal
strength