
5.4. Rest Risk
•
•
•
•
•
•
6. Installation
6.1. Noise
6.2. Directions for Mounting
•
• The unit can be mounted on a wall
be installed in production areas and
•
• The wall for mounting should be
•
screws and corresponding dowels
•
description and the station is hung
6.3. Transportation
on top or bottom where connections and outlets are
6.4. Vibrations
6.5. Water Connection
• Before the unit is connected to the
• The connection for water must be
• Minimum internal diameter of the sup
• The unit must be fitted with a closing
•
•
•
be screwed connections ensuring
simple maintenance and dismantling