6Oneida Air Systems, Inc.
Assembly Instructions
FIG. 1a
FIG. 1b
THE TELESCOPING STAND SHOULD BE INSTALLED ON A FLAT, STABLE BASE CAPABLE OF SUPPORTING
THE WEIGHT OF THE ENTIRE SYSTEM (INCLUDING FULL WASTE CONTAINERS) ONCE ASSEMBLED.
1Determine the location and orientation for
your installation, taking careful note of which
direction the dust collector’s inlet and lter
plenum will be facing [FIG. 1a].
Depending on your system's conguration,
refer to the table shown in [FIG. 1b] for the
Recommended Leg Position.
Note: We recommend that the stand be
assembled laying down and then raised into
position later on.
REQUIRED TOOLS RECOMMENDED TOOLS
9/16" Wrench Impact Driver Leveling Tool
9/16" Socket Wrench 2x4 Blocks
Torque Wrench
* You will need to supply your own mounting hardware if you wish to secure the Stand or Filter Option to the surface you are
mounting it onto (e.g. screws, washers, lag bolts, nuts, etc.).
LEG POSITION RECOMMENDED
SYSTEM CONFIGURATION
21" Cyclone
5 HP SMART
23" Cyclone
5 HP & 7.5 HP
28" Cyclone
10 HP
Single Drum
with/without Drum Dolly Position 1 Position 1 Position 1
Dual Drum
with/without Drum Dolly Position 2 Position 2 Position 2
Airlock with
1 Cu. Yd. Hopper Position 2 Position 2 Position 2
Airlock with
1-1/2 or 2 Cu. Yd. Hopper Position 3 Position 3 Position 3
Airlock with
Transfer Blower ANY ANY ANY