T5/T5HO, T8 & LED AC-to-Grid Mount Installation .............. 2-3
T5/T5HO, T8 & LED AC-to-JB Mount Installation ................ 4-5
T5/T5HO, T8 & LED AC-to-ST Mount Installation ................ 6-7
T5/T5HO, T8 & LED AC-to-Fixture ................................... 8-10
T5/T5HO, T8 & LED PP-to-JB Mount Installation ............ 11-12
T5/T5HO, T8 & LED PP-to-ST Mount Installation ............ 13-14
T5/T5HO, T8 & LED PP-to-Fixture ................................. 15-17
T5/T5HO, T8 & LED Surface Mount Installation .............. 18-20
T5/T5HO, T8 & LED Wall Mount Installation ................... 21-23
Lens Detail ................................................................... 24-25
EDGEEX33
EX44
INSTALLATION
INSTRUCTIONS

EDGEEX33
EX44
T5/T5HO, T8 & LED
AC-TO-GRID MOUNT INSTALLATION

4 - Octagonal
Junction Box
5” Power Canopy
Strain Relief
18ga. SJT Cord
Cross-Bar
Conduit and Fittings
(by others)
1/4-20 Stud
#8 Junction
Box Screws
IDS Clip
Tie-Off to structure
2” Non-Power Canopy
Aircraft Cable
Coupler
Coupler
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
T5/T5HO/T8/LED
Step 2:
Non Power Mount
Step 1:
Power at Ceiling
1. Layout mounting/ junction box locations. Begin row
with fixture label at first mounting point.
2. Install junction box onto T-Bar ceiling. Tie box off to
structure. Install conduit from building power
3. Thread 1/4-20 stud to crossbar for power. mounts.
Install crossbar to junction box.
4. Run SJT cord through canopy, make necessary power
connections, secure using strain relief.
5. Feed aircraft cable through coupler.
6. Secure canopy to crossbar bolts using aircraft cable
coupler.
1. Install IDS clips for non-power mounts. Tie off to structure.
2. Feed aircraft cable through coupler.
3. Secure canopy to IDS clip using aircraft cable coupler.
AC - to - Grid Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
EdgeEX33_44_Booklet_January 2017
3 of 25
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu
AC cables with damage, bends, kinks, fraying, or knots must be discarded and replaced with new components. Never install a fixture where the AC cable is more than 5 degrees from perpen-
dicular to the fixture. Fixtures are never to be raised by the cables (instead, lift the fixture up and adjust the cable position). Overtightening of hardware on grippers can damage AC cables. Never
exert force down onto the top of the fixture once it is hanging by safety cables. Never cut safety cables prior to installation. The first zip tie on the SJT and AC cables below the ceiling/canopy
must be no closer than 12” from the ceiling/canopy

EDGEEX33
EX44
T5/T5HO, T8 & LED
AC-TO-JB MOUNT INSTALLATION

4 - Octagonal
Junction Box
(by others)
5
” Power Canopy
Strain Relief
18ga. SJT Cord
Cross-Bar
Conduit and Fittings
(by others)
1/4-20 Stud
#8 Junction
Box Screws
1/4-20 Stud
(by others)
2” Non-Power
Canopy
Aircraft Cable
Coupler
* Stud sits 1/2”
Below Ceiling Plane
Coupler
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
Step 2:
Non Power Mount
Step 1:
Power at Ceiling
1. Layout mounting/ junction box locations. Begin row
with fixture label at first mounting point.
2. Thread 1/4-20 stud to crossbar for power mounts.
3. Install crossbar to 4-octagonal junction box.
4. Run SJT cord through canopy and into junction box,
secure with strain relief.
5. Make all necessary wiring connections.
6. Feed aircraft cable through coupler, secure canopy to
crossbar bolt using coupler.
1. Install 1/4-20 stud for non-power mounts (1/2” below
ceiling plane).
2. Feed aircraft cable through coupler.
3. Secure canopy to bolt using coupler.
AC - to - JB Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
5 of 25
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu
AC cables with damage, bends, kinks, fraying, or knots must be discarded and replaced with new components. Never install a fixture where the AC cable is more than 5 degrees from perpen-
dicular to the fixture. Fixtures are never to be raised by the cables (instead, lift the fixture up and adjust the cable position). Overtightening of hardware on grippers can damage AC cables. Never
exert force down onto the top of the fixture once it is hanging by safety cables. Never cut safety cables prior to installation. The first zip tie on the SJT and AC cables below the ceiling/canopy
must be no closer than 12” from the ceiling/canopy

EDGEEX33
EX44
T5/T5HO, T8 & LED
AC-TO-ST MOUNT INSTALLATION

4 - Octagonal
Junction Box
(by others)
5” Power Canopy
Strain Relief
18ga. SJT Cord
Cross-Bar
Conduit and Fittings
(by others)
1/4-20 Stud
#8 Junction
Box Screws
Coupler
Aircraft Cable
* Stud sits 1/2”
Below Ceiling Plane
1/4-20 Stud
(by others)
Aircraft Cable
Coupler
2” Non-Power
Canopy
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
Step 2:
Non Power Mount
Step 1:
Power at Ceiling
1. Layout mounting/ junction box locations. Begin row
with fixture label at first mounting point.
2. Install 4-octagonal junction box to structure adjacent to
power feed mount locations.
3. Attach crossbar to junction box.
4. Run SJT power cord through canopy and into junction
box. Secure using provided strain relief.
5. Make necessary power connections.
6. Feed Aircraft cable through coupler and secure canopy
to junction using coupler (provided).
1. Install 1/4-20 studs to structure at all mounting points
(3/4” below ceiling plane.)
2. Feed aircraft cable through coupler (if applicable).
5. Secure coupler assembly to 1/4-20 bolt or stud.
AC - to - ST Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
7 of 25
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu
AC cables with damage, bends, kinks, fraying, or knots must be discarded and replaced with new components. Never install a fixture where the AC cable is more than 5 degrees from perpen-
dicular to the fixture. Fixtures are never to be raised by the cables (instead, lift the fixture up and adjust the cable position). Overtightening of hardware on grippers can damage AC cables. Never
exert force down onto the top of the fixture once it is hanging by safety cables. Never cut safety cables prior to installation. The first zip tie on the SJT and AC cables below the ceiling/canopy
must be no closer than 12” from the ceiling/canopy
4 - Octagonal
Junction Box
(by others)
5” Power Canopy
Strain Relief
18ga. SJT Cord
Cross-Bar
Conduit and Fittings
(by others)
1/4-20 Stud
#8 Junction
Box Screws
Coupler
Aircraft Cable
* Stud sits 1/2”
Below Ceiling Plane
1/4-20 Stud
(by others)
Aircraft Cable
Coupler
2” Non-Power
Canopy

EDGEEX33
EX44
T5/T5HO, T8 & LED
AC-TO-FIXTURE INSTALLATION

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
1. Attach #8-32 screw to gripper through slot.
2. Slide aircraft cable through gripper.
3. Adjust gripper side to side to level fixture then tighten.
4. Repeat process for each subsequent fixture.
5. Re-level previous fixtures as necessary.
Step 3:
AC Mounting (Indirect)
T5/T5HO/T8/LED
AC - to - Fixture Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
9 of 25
EdgeEX33_44_Booklet_January 2017
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu
Slot
#8-32 Screw
Mount Spacing
Aircraft Cable - Example Rows
Mount Spacing
47-1/4”, 95-1/4”,
143-1/4”
Mount Spacing
47-1/4”, 95-1/4”,
143-1/4”
48, 96, 144”
Mount Spacing
Individual Fixture First Fixture Consecutive Fixtures
Gripper
Adjustable Cable

End Trim
(2 per section)
Quick Connects
#8-32x1-1/8” Bolt
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
1. Install End Trim after louver installation.
Two (2) per 4’ section
Three (3) per 8’ section
Four (4) per 12’ section
1. Install first fixture with two (2) mounting points.
2. Subsequent fixtures use one (1) mount.
3. Install two (2) #8-32 bolt into each fixture as shown.
4. Raise adjoining fixture and slip bolt heads through key-hole slot.
5. Attach mounting to fixture as previously shown.
6. Make necessary wiring connections between fixtures ensuring all wires are
properly matched.
7. Tighten the previously installed #8-32x1-1/8” (1/2 turn past hand tight) to com-
plete joining and create ground.
Step 5:
Joining Fixtures
1. Install end plates prior to lens/louver installation.
2. Place against end of fixture and secure using two (2) #6-32
nuts.
Step 6:
Finishing
EX33 Louver End Trim
EDGE EX33
EX44
T5/T5HO/T8/LED
AC - to - Fixture Mount
© 2017 Pinnacle Architectural Lighting
10 of 25
EdgeEX33_44_Booklet_January 2017
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

EDGEEX33
EX44
T5/T5HO, T8 & LED
PP-TO-JB MOUNT INSTALLATION

4 - Octagonal
Junction Box
(by others)
5” Slip Canopy
Conduit and Fittings
(by others)
Pendant
Cross-Bar
(3/8 IP)
3/8 IP Pendant Pipe
#8 Junction Box
Screws (by others)
4 - Octagonal
Junction Box
(by others)
5” Slip Canopy
Pendant
Cross-Bar
(3/8 IP)
3/8 IP Pendant Pipe
#8 Junction Box
Screws (by others)
Set Screw
Set Screw
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
PP - to - JB Mount
Step 2:
Non Power Mount
Step 1:
Power at Ceiling
1. Install 4-Octagonal Junction boxes to structure at all
mounting locations (see spacing on page 2). Begin row
with fixture label at first mounting point.
2. Install conduit from building power to J-Box.
3. Install crossbar to J-Box
4. Feed slip canopy over pendant and secure pendant
to crossbar.
5. Feed power from J-Box through pendant and out
leaving 12” for fixture wiring.
6. Make all necessary wiring connections.
1. Attach 4-Octagonal Junction boxes to structure at all
mounting locations.
2. Install crossbar to J-Box.
3. Slide slip canopy over pendant.
4. Rotate pendant onto crossbar.
5. Slide canopy up to ceiling level and secure with set
screw.
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
12 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

EDGEEX33
EX44
T5/T5HO, T8 & LED
PP-TO-ST MOUNT INSTALLATION

4 - Octagonal
Junction Box
(by others)
Conduit and Fittings
(by others)
Pendant Crossbar (3/8 IP)
#8 Junction Box Screws
(by others)
5” Slip Canopy
3/8 IP Pendant Pipe
Set Screw
4 - Octagonal
Junction Box
(by others)
Pendant Crossbar (3/8 IP)
#8 Junction Box Screws
(by others)
5” Slip Canopy
3/8 IP Pendant Pipe
Set Screw
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
PP - to - ST Mount
Step 2:
Non Power Mount
Step 1:
Power at Ceiling
1. Install 4-Octagonal Junction boxes to structure at all
mounting locations.(see spacing on page 2). Begin row with
fixture label at first mounting point.
2. Install conduit from building power to J-Box.
3. Install crossbar to J-Box
4. Feed slip canopy over pendant and secure pendant to
crossbar.
5. Feed power from J-Box through pendant and out leav-
ing 12” for fixture wiring.
6. Make all necessary wiring connections.
1. Attach 4-Octagonal Junction boxes to structure at all
mounting locations.
2. Install crossbar to J-Box.
3. Slide slip canopy over pendant.
4. Rotate pendant onto crossbar.
5. Slide canopy up to ceiling level and secure with set
screw.
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
14 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

EDGEEX33
EX44
T5/T5HO, T8 & LED
PP-TO-FIXTURE INSTALLATION

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
First Fixture
48”, 96”, 144”
Spacing
48”, 96”, 144”
Spacing
Consecutive Fixtures
Pendant - Example Rows
Mount Spacing
43-1/2”, 91-1/2”,
139-1/2”
Mount Spacing
43-1/2”, 91-1/2”,
139-1/2”
Individual Fixture
Cross bar
Nut
Pendant Pipe
Fixture Power
Wires
Building Power
Wires
Step 3:
PP Mounting
Step 4:
Making the connections
1. Pull wires through pendant pipe.
2. Make necessary wiring connections, ensuring all wires are
properly matched.
3. Recess wires back into housing.
(Note: UL label side has stripped wires and ground lead.)
1. Attach pendant pipe to fixture. Two (2) mounts for first fixture in
row/ individual, one (1) mount at opposite end for every fixture after.
2. Tighten down Nut to secure pendant pipe to fixture.
3. If power side mount run power wires into housing through pen-
dant pipe.
(Note: Once run is mounted cover any unused knock outs)
PP - to - ST Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
16 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

End Trim
Joining Hardware
Quick Connects
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
1. Install first fixture with two (2) mounting points.
2. Subsequent fixtures use one (1) mount.
3. Install two (2) #8-32 joining hardware as shown below.
4. Raise adjoining fixture and slip bolt heads through key-hole slot.
5. Attach mounting to fixture as previously shown.
6. Make necessary wiring connections between fixtures ensuring all wires are
properly matched.
7. Tighten the previously installed #8-32x1-1/8” (1/2 turn past hand tight) to com-
plete joining and create ground.
Step 5:
Joining Fixtures
1. Install end plates prior to lens/louver installation.
2. Place against end of fixture and secure using two (2) #6-32
nuts.
Step 6:
Finishing
1. Install End Trim after louver installation.
Two (2) per 4’ section.
Three (3) per 8’ section
Four (4) per 12’ section
EX33 Louver End Trim
PP - to - ST Mount
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
17 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

EDGEEX33
EX44
T5/T5HO, T8 & LED
SURFACE MOUNT INSTALLATION

12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
1. Remove top plug from both ends of beginning of run fixture(s) and
on end of continuous fixture(s)
2. Remove lens/ louver options from fixture(s).
3. Remove reflector from housing by removing reflector screws.
4. Feed necessary through wires out of top access hole.
1. Install junction box (by others) with crossbar (by others) into ceiling.
2. Mount fixture to crossbar using a nipple (by others).
3. Feed wires through nipple and connect to building power ensuring all
wires are properly matched.
4. Subsequent non power locations mount to structure.
Surface Mount Instructions
Step 1:
Fixture Prep
Step 2:
Mounting and Power
Crossbar
(by others)
Junction Box
(by others - size according
to fixture width)
Nipple 1/4” x 1”
(by others)
1/4” Nut
(byu others)
EX33 width = 2-7/8”
EX44 width = 4-7/16”
Plug
Hole Size = 7/8”
3/8” IP
Reflector
Lens
Reflector
Screws
Through wire
If MR16 Unit
2-1/4”
91-1/2”
2-1/4” 2-1/4” 2-1/4”
43-1/2”
48”
Individual Spacing
96”
8’ 8’ 8’
First Fixture
91-1/2” 96” Spacing 96” Spacing
Mount Spacing Example Rows
End Plates Not Included
Fixture Lenghts: 48”, 96”, 144” (add 6” per MR16)
First/ Individual Fixture
Mount Spacing (C-to-C)
4’ = 43-1/2”
8’ = 91-1/2”
12’ = 139-1/2”
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
19 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu

End Trim
(2 per section)
Quick Connects
#8-32x1-1/8” Bolt
12655 E. 42nd Ave. #50 Denver, CO 80239 Phone: 303.322.5570 Fax: 303.322.5568 www.pinnacle-ltg.com
1. Install End Trim after louver installation.
Two (2) per 4’ section
Three (3) per 8’ section
Four (4) per 12’ section
1. Install first fixture with two (2) mounting points.
2. Subsequent fixtures use one (1) mount.
3. Install two (2) #8-32 bolt into each fixture as shown.
4. Raise adjoining fixture and slip bolt heads through key-hole slot.
5. Attach mounting to fixture as previously shown.
6. Make necessary wiring connections between fixtures ensuring all wires are
properly matched.
7. Tighten the previously installed #8-32x1-1/8” (1/2 turn past hand tight) to com-
plete joining and create ground.
Step 3:
Joining Fixtures
1. Install end plates prior to lens/louver installation.
2. Place against end of fixture and secure using two (2) #6-32
nuts.
Step 4:
Finishing
EX33 Louver End Trim
Surface Mount Instructions
EDGE EX33
EX44
© 2017 Pinnacle Architectural Lighting
20 of 25
EdgeEX33_44_Booklet_January 2017
T5/T5HO/T8/LED
1. This product must be installed in accordance with applicable installation and electrical codes by a professional familiar with the
construction and operation of the product.
2. Minimum 90ºC supply conductors
3. All electrical connections must be performed by a certified electrician to applicable local and national electrical codes.
4. Fixtures must be mounted directly to structure.
5. The holding strength of AC cables cannot be guaranteed if the cables are damaged in any way.
Return to
Main Menu
This manual suits for next models
1
Table of contents
Popular Light Fixture manuals by other brands

Philips
Philips Lytecaster 1050 Series Installation

Philips
Philips EG1-3 specification

Philips
Philips 31607-48-16 user manual

ILP
ILP RB3 Series installation instructions

Cooper Lighting
Cooper Lighting Combo Trimless Series LV-116-TR installation instructions

American DJ
American DJ Fusion Scan 250 User instructions