【NOTE】
】】
】
Please carefully read t e user’s manual before operation for t e sake of
understanding correct operation of t e instrument. Please keep t e manual
andy for future reference.
The input and output of the instrument is with danger high
voltages which may endanger the safety of life. Please strictly
follow the operating description is not allowed to remove the
cover of the instrument.
WARNING
1. Please connect protective earth efore power supply ca les.
2. The input & output voltage of the UPS is dangerous which will endanger the safety.
3. Dangerous voltages are present inside the unit. Please do not open the cover of the UPS.
4. Please turn off the mains input switch and the attery switch for any urgency.
5. There are many kinds of power sources in the equipment, the line ank or the socket may still
have dangerous voltage even if the main power is disconnected.
6. Please remove the ca le etween the attery & UPS efore repairing. It’s necessary to wait
for another 5 minutes for discharging, ecause of the dangerous voltages.
7. The wires should e fastened to the terminals. It is prohi ited to short the anode and cathode
of attery. It’s prohi ited to touch any two of wire connectors or are end of connecting wires.
Otherwise, it may lead to damage of attery or personal injury.
8. Please keep the attery away from the fire and all the equipment that may cause spark to
prevent the danger and damage.
9. Please do not open or shatter the attery, the overflow electrolyte is with causticity that may
e harmful to life.
10. Please contact the professional personnel of the local dealer or the special maintenance
station for any trou le-shooting. Random disposal of the trou le is not allowed.
11. This is an A-grade product with electromagnetic compati ility.
12. This equipment must e installed and serviced y qualified personnel.
13. Before you replace the attery of different rand and different type, make sure the charging
voltage is matching with UPS charging voltage due to the different required charging voltage
of different attery, If any dou t, please consult with the manufacturer. Any changes of the
system configuration, structure and composition will influence the performance of UPS,
please consult with the manufacturer in prior efore doing any changes.
14. Before usage, confirm that the temperature of the instrument has dropped into the normal run
range. It is recommended still placement for 24 hours in the normal temperature range efore
startup.

-i-
Contents
1 .Overview ............................................................................................................................................. 1
1.1 Profile ........................................................................................................................................... 1
1.2 Performance Index ...................................................................................................................... 2
1.3 Primary Functions and Characteristics ....................................................................................... 3
1.4 Precautions .................................................................................................................................. 3
2 .Structure and Basic Principles ........................................................................................................... 5
2.1 General Structure ........................................................................................................................ 5
2.1.1 Display Structure and Display Interface of ( 3kVA) Series ..................................... ........ 5
2.1.2 3KVA Front Panel, Rear Panel Structure ........................................................................ 6
2.2 Basic Principles ........................................................................................................................... 7
3 .Equipment Installation ........................................................................................................................ 9
3.1 Site and Environment Requirements .......................................................................................... 9
3.1.1 Site Requirements .............................................................................................................. 9
3.1.2 Environment Requirements ............................................................................................... 9
3.2 Procedures of Dismantling Cases ............................................................................................. 10
3.3 Installation of UPS ..................................................................................................................... 10
3.4 Selection of Ca le ..................................................................................................................... 11
3.4.1 Selection of Input Air Switch ............................................................................................. 11
3.4.2 Selection of Input and Output Power Cord Diameter ...................................................... 12
3.5 Ca le Connection ...................................................................................................................... 13
3.5.1 3KVA ........................................................................... .................................................... 13
3.5.2 Inspection of Electric Connection .................................................................................... 15
4 . Equipment Use and Maintenance ................................................................................................... 16
4.1 Preparations efore First Start-up ............................................................................................. 16
4.2 UPS Start-up Sequence ............................................................................................................ 16
4.3 Daily Start-up and Shutdown ..................................................................................................... 17
4.4 Battery Daily Maintenance ........................................................................................................ 17
4.5 Battery Changing ....................................................................................................................... 18

-ii-
4.6 Maintenance Guide ................................................................................................................... 18
4.6.1 Safety Precaution ............................................................................................................. 19
4.6.2 Preventive and Regular Maintenance.............................................................................. 19
4.6.3 FAQ .................................................................................................................................. 20
4.7 Trou leshooting ......................................................................................................................... 21
4.7.1 Overview .......................................................................................................................... 21
4.7.2 Trou leshooting................................................................................................................ 22
5 . Packing, Transportation and Storage .............................................................................................. 23
5.1 Packing ...................................................................................................................................... 23
5.2 Transportation ............................................................................................................................ 23
5.3 Storage ...................................................................................................................................... 23

-1
-
1 .Overview
1.1 Profile
3KVA UPS is total high frequency, pure online and intellectualized UPS.
They are also ideal power guarantee for file server, enterprise erver,
central server, microcomputer, concentrator, telecommunication system,
data center, medical facilities and those requiring high quality power protection.
They can be widely used in many key business areas such as post & telecom,
finance, network, securities and railway, etc.
3KVA UPS is single-phase alternating current input and output.

-2
-
1.2 Performance Index
The main performance index of 3KVA is shown in Ta le 1-1.
Ta le 1-1 UPS Main Performance Index
Index Model
3KVA
Input
Characteristic
Rating voltage (V) 160V~290 100%LOAD, 120V~160 50%LOAD
Rating frequency (Hz) 50±5%Hz(60±5%Hz)
Input mode Single-phase three-line
Battery voltage (V) 96
Output Characteristic
Capacity (VA/W) 3000/2400
Voltage (V) 120±2%/220±2%
Frequency (Hz) 50±0.2Hz or 60±0.2Hz (Battery mode)
Waveform Sine wave
Voltage distortion
factor THD < 3% (Linear load)
Power factor 0.8 (Lag)
Switching time (ms)
AC-BATTERY 0
Overload capacity 105%~130% Load, lasting 60 seconds. 135%~150% Load, lasting 30 seconds
Output mode Sockets
Other Characteristics
Spare time 5 minutes
(PC LOAD)
Rational
configuration
for long time
delay
Charge recovery time <12 hours (Standard time delay model)
Communication
interface RS232 interface supports UPS power management software or SNMP protocol
Panel display LCD and LED display operation status and function of UPS
Warning function Battery low voltage, a normal power supply, UPS malfunction,Over load
Protection function Battery low voltage protection, overload protection, short-circuit protection and over
temperature protection
Frequency noise (dB) < 45
Working temperature 0 ~ 40
℃
Relative humidity 0 ~ 95%, No condensation
Size (mm)
(H × W × D) 347×198×670
Weight (kg) 46
◆
Specifications are subject to c ange wit out prior notice.

-3
-
1.3 Primary Functions and C aracteristics
1
.
Intelligentized RS232 communication function: With RS232 standard
data interface and UPS power management software, realize three
remote-control functions etween computer and UPS, computer
supervises UPS operation and electric parameters, and realize
long-distance power on/off function, as well as supporting SNMP
network adaptor (outlaid, connecting UPS through RS232 interface),
which ena les UPS to directly ecome network fresh lood.
2
.
High input power factor: Adopt advanced active PFC technique, which
alleviates load on electric network and represents green power supply of
new generation.
3
.
High performance-price ratio: Adopts multiple power transfer and high
frequency PWM technique, high efficiency, small size and light weight as
well as improving operational relia ility and reducing manufacturing cost,
which lowers the cost of the system design for customers.
4
.
Perfect protection function: Possess such functions as output
low-voltage protection, attery low-voltage protection, input low-voltage
protection and triple overflowing protection, etc and overcome previous
defects such as high frequency UPS' poor adapta ility and weak
resistance to shock for electric network.
5
.
Low commercial power input voltage: Adopt independent quick detection
technique, even at the lower limit 140V of commercial power, the attery
remains off discharge, thus all energy output are taken from electric
network, ensuring the attery in the state with 100% energy storage,
while at the same time decreasing the attery discharge times and
prolonging its life.
1.4 Precautions
A ide y the following general safety precaution during operation or
maintenance.
1
.
Please don't remove the cover. This system can only e maintained or
repaired y professional maintenance personnel.

-4
-
2
.
Protective ground terminals should e connected to earth end for sure.
3
.
High creepage danger! Connect to the ground efore connecting UPS.
4
.
Install this UPS indoors with oth temperature and humidity under
control and without dust.
5
.
The electric power of this UPS has multiple sources. Before maintaining,
cut the alternating current, exterior attery or interior attery's air switch
to isolate the input energy.
6
.
Even if the AC power supply has een cut off, the danger from attery's
high voltage inside the UPS still exists.
7
.
If attery circuit has not een isolated from AC input, dangerous voltage
may possi ly exists etween attery terminal and ground terminal.
8
.
High voltage endangering personal safety exists in the storage attery
of this UPS. Please pay attention to insulation during installation and
use.
9
.
Improper handling of acidic attery leads to leakage risk of chemistry
dangerous su stance and corrosive liquid.
10
.
Dripping condensation should e happen if machine was operated under
low-temperature environment. So please install and use machine when
machine was full-dry, or there will has dangerous of electric shock.
Warning: Input and output voltage of this equipment is dangerous high voltage,
which can endanger personal life or safety. Please read carefully this
Manual during installation, operation and efore use. Pay attention to
various caution nameplates and caution statements. Professional
maintenance personnel without proper authorization are not allowed to
remove off the case cover of this equipment.

-5
-
2 .Structure and Basic Principles
2.1 General Structure
2.1.1 Display Structure and Display Interface of (3kVA)
⑧
⑦
⑥
⑤
④
③
②
①
ON
SELECT
OFF
FAULT
BYPASS
INVERTER
LINE
Fig. 2-1 Display panel interface of (3kVA) Series
Explanation :
::
:
press the key "ON" for 3 seconds to test the attery when start up the UPS
under the unititly mode; press the key "ON" for 3 seconds to make the uzzer
silent when start up the UPS under the attery mode.if it need to display the
history or return, please press the select key for 3 seconds;if it need to delete
the history, please press the select key on the history page(or on the output
display page when the acklight lights out) for 6 seconds
①
、
Line light
②
、
Inverter light
③
、
Bypass light
④
、
Fault light
⑤
、
LCD Display panel
⑥
、
ON utton(Press “ON” utton for 0.5 seconds to start up UPS )
⑦
、
OFF utton (press it Press “OFF” utton for 0.5 seconds to shut
down UPS.)
⑧
、
Select utton

-6
-
2.1.2 3KVA Front Panel, Rear Panel Structure
Front and rear panel structure of the main unit of 3KVA and is illustrated
in Fig. 2-3. Inside which the switch on rear panel is composed of switch for
commercial power input and switch for storage battery.
The upper switch is for storage battery, and the lower one is for commercialcommercial
power input.
Panel,Front-For
Gas Entry
Panel,Front-For
Gas Entry
Display
AC INPUT
L N
AC OUTPUT
PE
N L
POWER
OFF
BATTERY
ON
Fan
AC Input & AC Output
terminal
Battery Breaker
Mains Power Breaker
AC Output sockets
RS232 USB
Communication interface
(Optional)
SIGNAL RS232
SNMP
NetAgent Mini
SNMP
RS232
RS232 &
DRY CONTACT
RS232
These
communication
interfaces are
optional
DC
INPUT
External attery
connector
OUTPUT
120V/60Hz
(Eac 15A Max.)
OUTPUT
220V/60Hz
(Eac 15A Max.)
(Front Panel) (Rear Panel)
Fig. 2-3 3KVA Front Panel and Rear Panel Structure

-7
-
2.2 Basic Principles
When commercial power is normal, (3kVA) UPS input, through PFC,
increases the voltage to ±370V sta ilized DC voltage, which supplies DC/AC
inverter and transmits sta le 220VAC, while at the same time completing the
charging of the attery. When commercial power is a normal, the attery
increases the voltage through DC/DC to ± 390V DC voltage and supplies
DC/AC inverter.
UPS principle lock diagram is shown in Fig. 2-4. DC/AC inverter adopts
half- ridge structure, while DC/DC voltage increase adopts push-pull or
BOOST circuit. PFC is active power-factor correction circuit controlled y
UC3854, while CHARGER is complete isolation type charger.

-8
-
CHARGE
PFC AC/DC
SW
BATTERY
DC/DC
DC/AC LOAD
AC INPUT
Fig. 2-4 UPS Basic Principle Block Diagram
Corresponding relations of pins for the RS232 serial ports of this series UPS
and those of general PC are shown in Ta le 2-1.
162738495
Fig. 2-5 RS232 pins definitions
Ta le 2-1:
Corresponding relations of pins for the RS232 serial ports of this
UPS and those of general PC:
Communication RS232 Interface for UPS General RS232 Interface
9 (3) 2 (Receive)
6 (2) 3 (Deliver)
7 (5) 5 (Ground)

-9
-
3 .Equipment Installation
3.1 Site and Environment Requirements
Before UPS installation, the site and environment of equipment room should
meet the essential conditions for safe and normal operation of equipment as
defined in this section. If the customer’s site conditions are not accord with the
minimum requirement of safe equipment operation, the customer should make
corresponding changes to the site conditions, and install the equipment only
after meeting the conditions of safe and normal equipment operation.
3.1.1 Site Requirements
The site conditions should accord with the essential conditions of safe and
normal equipment operation as stated in this section.
1
.
The equipment room must e equipped with applica le and effective fire
apparatus;
2
.
The commercial power, which supplies power for UPS, should e equipped
with dedicated air switch or utility socket;
3
.
Strictly prohi it to store dangerous things, such as inflamma le things,
explosive things in the equipment room;
4
.
Before equipment installation, the ground wire should e prepared. The
voltage of neutral wire and ground wire of commercial power cannot
exceed 5V;
5
.
The civil engineering construction of the equipment room should e
completed totally, and the floor should e sclerotic. The site must e tidy
and dry without dust.
3.1.2 Environment Requirements
Am ient temperature: 0
℃
~
+40
℃
;
Relative humidity: 0%RH
~
95%RH, no condensation;
Cooling mode: air-cooling;
Verticality: no shock with orthogonal rake not exceeding 5º.

-10-
3.2 Procedures of Dismantling Cases
When installing the equipment, the packing should e removed after carrying
the equipment to the installation site. The packing of UPS equipment and
fittings ( attery, etc.) should e wooden case and carton. Check the UPS
equipment and fittings against the shipping list.
If the equipment or fittings are damaged during transportation or the equipment
and fittings are not accord with the ordering contract, make site record in time
and immediately contact the local office or distri utors.
Refer to Ta le 3-1 for the equipment configuration.
Ta le 3-1 List of Equipment Configuration
Item Description Unit Qty. Remarks
1 AC wire Piece
1 3KVA is line bank
2 Fuse Piece
1 3KVA N/A
3 Software Set 1 Optional
4 User’s Manual Copy
1 Enclosed in grip ag
5 Packing list Copy
1 Enclosed in grip ag
6 Warranty Card Copy
1 Enclosed in grip ag
7 Battery
expansion line
Piece
1 Standard time eckup model N/A
3.3 Installation of UPS
Because the main unit size of (3kVA) standard time-delay model and
long time-delay model is small, the UPS can e placed on the flat surface
directly without other fixing or installation. For convenient operation,
maintenance and heat emission of the equipment, there shall e at least
30cm~50cm room space reserved around the machine frame and 50cm a ove
the upper machine frame. The vent fan shall e installed eside the attery.
Keep good interior ventilation. The service life of the attery is the longest
when the attery is used under normal temperature(20
℃
). Recommend to
install air-conditioning equipment in equipment rooms with allowed conditions.
Refer to Fig. 3-1 for the precautions of UPS installation and use.

-11-
Fig. 3-1 Precautions of UPS Installation and Use
1
.
Place UPS on flat floor (avoid o lique and ragged floor).
2
.
Keep good ventilation, the distance of the ack and side to the wall should
e a ove 30cm~50cm, to facilitate heat emission.
3
.
Avoid placing it in the location with sunshine, rain and dampness.
4
.
Never place it in the location with corrosive air.
5
.
Do not place articles on or around the UPS, to prevent the vent hole from
eing locked. No person is allowed to sit on it.
3.4 Selection of Cable
3.4.1 Selection of Input Air Switc
Before the input coil in of the equipment, install an air switch or a distri ution
ox compliant with the power and capa ility of the equipment, to isolate it with
commercial power. Consider especially the charge power and the current
shock, the input air switch can e higher than 1.5-2 times most current of UPS
input, which is without leakage current protection in order to avoid error action.
The distri ution ox should e etter to e manufactured y professional
company. Please refer to Ta le 3-2.

-12-
Ta le 3-2 Recommended Sectional input air switch
3KVA
Most
Current
(A)
Recommended
Air switch
(A)
AC
Input
23 32
DC
Input
35 50
3.4.2 Selection of Input and Output Power Cord Diameter
For the selection of conducting wire sectional area for UPS AC input and output
ca le and attery ca le, please refer to Ta le 3-3 for corresponding
recommended values, and choose values upwards.
Ta le 3-3 Recommended Sectional Flow of Ca le Sectional Area of UPS
Ampacity
(A)
Sectional Area (mm
2
)
1 1.5 2.5 4 6 10 16 25
Ru er
(25°C)
8 12 20 28 42 70 96 125
Plastic
(25°C) 6 9 15 20 30 50 64 100

-13-
3.5 Cable Connection
To connect UPS ca le only after confirming that all air switches on UPS are in
disconnection condition, and the equipment is properly installed.
3.5.1 3KVA
The input and output connection methods of 3KVA
shown in Fig. 3-3.
AC INPUT
L N
AC OUTPUTPE
N L
POWER
OFF
BATTERY
ON
RS232 USB
DC
INPUT
OUTPUT
120V/60Hz
(Eac 15A Max.)
OUTPUT
220V/60Hz
(Eac 15A Max.)
Socket output to load
!
L
、
N
、
PE
,
Three of
them can not e rever-
sed;the exposed part of
each wire can not have
contact with ca inet.
Terminal
output to load
Commercial
power input
!
Output socket
load sharing
Socket output to load
Socket output to load
Fig. 3-3 3KVA connection Schematic

-14-
AC input of 3KVA adopts line bank, and the AC output adopts socket.
You can insert load power cord into the output socket directly.
Normally, the load current of each socket cannot exceed 10A.
When connecting the line ank, take the small cover oard off from the line
ank, and pay attention to the definition of connection terminal: from the right to
the left (rear view) orderly to AC input are: live wire (L), neutral wire (N) and
ground wire (PE). After the connection, please check up whether the wire of
connection is correct and firm, and then install the small cover oard ack to
the ox.
For long time-delay UPS, attery input expansion line is required to e
connected. That is, insert the attery connection wire two-core plug of the
attery ox into the two-core socket on main unit rear panel. Refer to the
relevant content of the attery ox installation and ca le connection.

-15-
3.5.2 Inspection of Electric Connection
1
.
Inspection of AC input wire: Whether the AC wire color spectrum is
normative. Whether the wire diameter of AC input ca le is suita le.
Whether control switch is connected outside. Whether the connection of
live wire (L), neutral wire (N) and ground wire (PE) is correct. Whether
the connection of AC input wire is firm.
2
.
Inspection of AC output wire: Whether the AC output wire color
spectrum is normative. Whether the wire size of AC output ca le is
suita le. Whether switch in the control switch outside. Whether the
connection of line wire (L), neutral wire (N) and ground wire (PE) is
correct. Whether the connection of AC output wire is firm.
3
.
Inspection of ground wire: Whether the ground wire of UPS is connected
to the ground line ank of the equipment room. Whether the connection
of ground wire is relia le.
4
.
The inspection of the voltage difference etween neutral wire and
ground wire: the voltage difference should e less than 5Vac.
5
.
If the customer adopts the configuration of long time-delay model,
examine whether the attery ca le connection of main unit ox and
attery ox is correct and relia le.
6
.
If the UPS is installed with remote monitoring equipment, examine
whether the connection of relevant RS232 serial port is correct.
7
.
Examine whether the wiring is in order, whether the ca le inding
accord with the technical criterion.
8
.
Examine whether the installation and wiring are in favor of the future
system modification, expansion and maintenance.

-16-
4 . Equipment Use and Maintenance
4.1 Preparations before First Start-up
To ensure normal operation of UPS, please confirm the following efore use:
1
.
Correct installation of input and output;
2
.
If the air switch at the ack of UPS is placed at “OFF”;
3
.
If the power end is connected to rated input power supply;
4
.
Confirm that UPS output does not short circuit, and the load capacity
does not exceed UPS capacity;
5
.
Confirm if computer or other instrument is turned off;
6
.
Confirm if attery voltage is normal;
7
.
It is not recommended to connect reactive load to the UPS output.
Loads are normally powered y electric network directly.
4.2 UPS Start-up Sequence
After confirming all the a ove, please start the machine y following means:
1
.
Put the air switch at the back to “ON” position.
2
.
Press the "ON/OFF" utton on the UPS panel to start UPS, the "INV."
indicator light will light up. After retardation time, the "BYPASS" light
goes out and the UPS is changed inversion power supply. By this time,
the start-up is completed and the equipment starts operation. Wait for
a out 20 seconds after normal no-load operation to turn on the
computer or other instrument. Start the load in the sequence of
high-power to low power, first start the high-power equipment then in
turns start equipment with lower power.
3
.
Start computer or other equipment.