PA470-D
5/3/05 NK/AH
PA470-D INSTALLATION
2/4
Product Operation
Review Figure 1 for socket identification before proceeding.
Power Input Test
This test will ensure that the Proportion-Air unit is re-
ceiving the correct voltage from your power supply.
1. Set your meter to D.C. voltage.
2. Plug the negative probe from the meter into the
green socket (G).
3. Plug the positive probe from the meter into the
black socket (B).
4. The voltage should read between 15 and 24 volts
on standard Proportion-Air units.
5. If the voltage reading is not in this range, unstable,
or negative, check the power supply and wiring.
See figure 4
Differential Voltage Commanded Units
This is for Proportion Air units that have TFEE for
TFEC in their part number string.
1. Plug one of the H4444 patch cord into the white
jacks (W1 and W2). Plug the other H4444 patch
cord into the red jacks (R1 and R2).
2. Set your multimeter to D.C. voltage.
3. Put multimeter’s negative probe in the blue socket
(BLU) and the positive probe in the socket of either
end of the patch cord.
4. The voltage displayed on the multimeter should be
the same as the controller is out putting. (Command
signal) See figure 5
Current Commanded Units
This is for Proportion Air units that have TFIE or
TFIC in their part number string.)
1. Remove H4444 patch cord from W1 and W2 white
jacks.
2. Set your multimeter to milliamps.
3. Put positive probe in W1 white jack. Place nega-
tive probe in W2 white jack.
4. Reading should be the same as the controller is
outputting to the unit. See figure 6
Command Signal Input Test
This test will verify that the Proportion-Air unit is receiving a good command signal.
Figure 5
Figure 6
Figure 4