Rack Solutions 2Post User manual

4Post and 2Post Sliding Rails
for Cisco C200
Installation Instructions
Kit P/N: 122-2546
Patent(s) Pending
4Post
Page 2
2Post Center
Page 4

Page 2
4Post Installation Instructions
Kit Contents
Step 1. Rail Attachment: Attach the Inner Rail to the chassis by aligning the Shoulder
Lugs with the keyholes in the Inner Rail, then slide toward the front of the server.
Install supplied M4 pan head screw as shown to secure inner rail to the chassis.
Right side is shown, Left side is labeled "L". Repeat for the other side.
Kit Contents:
(2) Outer Rail (Left & Right)
(2) Inner Rail (Left & Right)
(2) Rear Bracket (Left & Right)
Secure Hardware:
(2) M4 x 6mm pan Head Screw
Mounting Hardware:
(8) 8-32 x .312 Flat Head Screw
(8) 8-32 x .500 Pan Head Screw
(8) 8-32 Keps Nut
(4) Retainer Plate
(4) Square Hole Washer
(2) M6 x Cage Nut
Rack Mount 8x:
(8) 10-32 x .500 Pan Head Screw
(8) 12-24 x .500 Pan Head Screw
(8) 12-24 x Square Nut
(8) 12-24 x Cage Nut
Step 2. Attach Rear Brackets: Attach the Rear Brackets to the Outer Rail Assemblies,
using included 8-32 at head screws and keps nuts. Ensure they are set to the
required "Mounting Depth".
Inner Rail
(Labeled "R")
Lug
Outer Rail
Rear Bracket
8-32 x .312 Flat Head Screws
8-32 Keps Nuts
M4 x 6mm Pan
Head Screw

4Post Installation Instructions
Page 3
Note: Install M6 Cage Nuts prior to installing any of the rails to the rack.
Step 3b.Square Hole Racks: Attach the Front and Rear of the rails to the 4Post rack as
shown below using supplied 8-32 Pan Head Screws on each side. Repeat for the
other side. Right side shown, Left side rail is labeled "L". Tighten the front and
rear Pan Head Screws on the right side rail. Leave the front and rear Pan Head
Screws on the left side rail slightly loose.
Step 3a. Round/Threaded Hole Racks: Attach the Front and Rear of the rails to the 4Post
rack as shown below using supplied 8-32 Pan Head Screws on each side.
Repeat for the other side. Right side shown, Left side rail is labeled "L". Tighten
the front and rear Pan Head Screws on the right side rail. Leave the front and
rear Pan Head Screws on the left side rail slightly loose.
(4) 8-32 x.500 Pan Head Screws
(4) 8-32 x.500 Pan Head Screws
Retainer Plate
Retainer Plate
Retainer Plate
(2) Square Hole Washers
M6 Cage Nut
Outer Rail
(Labeled "R")
Outer Rail
(Labeled "R")
Front
Front
Rear
Rear
Note: Install M6 Cage Nuts prior to installing any of the rails to the rack.
M6 Cage Nut

Step 1. Rail Attachment: Attach the Inner Rail to the chassis by aligning the Shoulder
Lugs with the keyholes in the Inner Rail, then slide toward the front of the server.
Install supplied M4 pan head screw as shown to secure inner rail to the chassis.
Right side is shown, Left side is labeled "L". Repeat for the other side
2Post Center Installation Instructions
Step 2. Attach Rear Brackets: Attach the Rear Brackets to the Outer Rail Assemblies,
using included 8-32 at head screws and keps nuts. Ensure they are set to the
required "Mounting Depth".
Page 4
Inner Rail
Labeled "R"
Lug M4 x 6mm Pan
Head Screw
Outer Rail
Rear Bracket
8-32 x.312 Flat Head Screws
8-32 Keps Nuts
4Post Installation Instructions
Step 4. Install the equipment: Slide the equipment all the way in. Tighten the (2) Pan
Head Screws on the back of the left slide rail. Slide the equipment out about 8
inches and tighten the (2) Pan Head Screws on the front of the left slide rail.
Note: When tightening the loose rails, support the bottom of the server to ensure proper
rail adjustment.

2Post Center Installation Instructions
Step 4. Attach Retainer Bracket: Attach Retainer Bracket to the front of the outer rail as
shown below using the supplied 8-32 Pan Head Screws. Repeat for the other
side.
Note: Install M6 Cage Nuts prior to installing any of the rails to the rack.
Step 5. Install the equipment: Slide the equipment all the way in. Tighten the (2) Pan
Head Screws on the back of the left slide rail. Slide the equipment out about 8
inches and tighten the (2) Pan Head Screws on the front of the left slide rail.
Retaining Plate
(2) 8-32 x .500 Pan Head Screws
Page 5
Note: When tightening the loose rails, support the bottom of the server to ensure proper
rail adjustment.
Outer Rail
Step 3. Attach the rails to the rack: Attach the Front and Rear of the rails to the 2Post
rack as shown below using supplied 12-24 Pan Head Screws on each side.
Repeat for the other side. Right side shown, Left side rail is labeled "L". Tighten
the front and rear Pan Head Screws on the right side rail. Leave the front and
rear Pan Head Screws on the left side rail slightly loose.
Outer Rail (Labeled "R")
(4) 12-24 x .500
Pan Head Screw
Front Rear
M6 Cage Nut

Page 6

Page 7

Warranty Statement
Innovation First, Inc. warrants our products against defects in material and workmanship for a
period of one (1) year from the date of purchase. Innovation First, Inc. liability shall be limited to
repairing or replacing, at our option, any defective product.
2546
This manual suits for next models
1
Table of contents