
Page 2
4Post Installation Instructions
Kit Contents
Step 1. Rail Attachment: Attach the Inner Rail to the chassis by aligning the Shoulder
Lugs with the keyholes in the Inner Rail, then slide toward the front of the server.
Install supplied M4 pan head screw as shown to secure inner rail to the chassis.
Right side is shown, Left side is labeled "L". Repeat for the other side.
Kit Contents:
(2) Outer Rail (Left & Right)
(2) Inner Rail (Left & Right)
(2) Rear Bracket (Left & Right)
Secure Hardware:
(2) M4 x 6mm pan Head Screw
Mounting Hardware:
(8) 8-32 x .312 Flat Head Screw
(8) 8-32 x .500 Pan Head Screw
(8) 8-32 Keps Nut
(4) Retainer Plate
(4) Square Hole Washer
(2) M6 x Cage Nut
Rack Mount 8x:
(8) 10-32 x .500 Pan Head Screw
(8) 12-24 x .500 Pan Head Screw
(8) 12-24 x Square Nut
(8) 12-24 x Cage Nut
Step 2. Attach Rear Brackets: Attach the Rear Brackets to the Outer Rail Assemblies,
using included 8-32 at head screws and keps nuts. Ensure they are set to the
required "Mounting Depth".
Inner Rail
(Labeled "R")
Lug
Outer Rail
Rear Bracket
8-32 x .312 Flat Head Screws
8-32 Keps Nuts
M4 x 6mm Pan
Head Screw