REMBE UNIBAND Operational manual

Belt weigher UNIBAND®with ADAM HighEnd
Translation of the original operating manual
GBB-BW_ADAM-17682/1
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

Table of Contents
2 / 34 GBB-BW_ADAM-17682/1 ADAM
Table of Contents
1 About this operating manual ...................................................................................4
1.1 Target group................................................................................................................................ 4
1.2 Warning notices and symbols .....................................................................................................4
2 Safety.........................................................................................................................5
2.1 Intended use ............................................................................................................................... 5
2.2 General safety notices ................................................................................................................5
Product safety ............................................................................................................................. 52.2.1
The operators' obligations........................................................................................................... 52.2.2
The obligations of personnel ....................................................................................................... 52.2.3
3 Design and function .................................................................................................6
3.1 Design .........................................................................................................................................6
Mass flow transducer design....................................................................................................... 63.1.1
Belt weigher design.....................................................................................................................73.1.2
3.2 Function.......................................................................................................................................8
Mass flow transducer .................................................................................................................. 83.2.1
Belt weigher ................................................................................................................................83.2.2
4 Marking......................................................................................................................9
4.1 Mass flow transducer marking ....................................................................................................9
Tag plate .....................................................................................................................................94.1.1
4.2 Belt weigher marking................................................................................................................... 9
Tag plate .....................................................................................................................................94.2.1
Warning sticker nominal load ......................................................................................................94.2.2
Warning sticker weighing area .................................................................................................. 104.2.3
5 Transport and storage............................................................................................11
5.1 Transporting ..............................................................................................................................11
5.2 Unpacking and checking the condition on delivery...................................................................11
Lifting.........................................................................................................................................115.2.1
5.3 Storage......................................................................................................................................11
6 Installation...............................................................................................................12
6.1 Checking the ambient conditions .............................................................................................. 12
6.2 Mounting the belt weigher .........................................................................................................12
6.3 Remove the transport protection...............................................................................................13
6.4 Connect the mass flow transducer............................................................................................14
6.5 Connect the speed adjustment wheel (optional).......................................................................14
7 Start-up of the mass flow transducer....................................................................15
7.1 Checking the ambient conditions .............................................................................................. 15
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

Table of Contents
ADAM GBB-BW_ADAM-17682/1 3 / 34
7.2 First application .........................................................................................................................15
7.3 Set end of measuring range and unit........................................................................................15
7.4 Perform measuring alignment ...................................................................................................16
8 Start up mass flow transducer with π-Mach software .........................................17
8.1 Connection to the Internet.........................................................................................................17
8.2 Quick Setup...............................................................................................................................17
8.3 Full Setup ..................................................................................................................................18
8.4 Speed adjustment wheel (optional)...........................................................................................18
9 Mass flow transducer software..............................................................................19
9.1 Program interface......................................................................................................................19
9.2 Program menu ..........................................................................................................................21
10 Maintenance and servicing ....................................................................................24
10.1 Check ........................................................................................................................................24
Cleaning ....................................................................................................................................2410.1.1
11 Disposal ..................................................................................................................25
11.1 Dismantling................................................................................................................................ 25
11.2 Disposing...................................................................................................................................25
12 Appendix .................................................................................................................26
12.1 Technical data ...........................................................................................................................26
Mass flow transducer ................................................................................................................2612.1.1
12.2 Wiring diagrams ........................................................................................................................28
Sensor connection and power supply for transmitter in a stainless steel housing ...................2812.2.1
Sensor connection and power supply for transmitter as a switching panel installation ............3012.2.2
Current output and bus connection ...........................................................................................3212.2.3
12.3 EC declaration of conformity .....................................................................................................33
12.4 Spare parts................................................................................................................................34
12.5 Optional accessories.................................................................................................................34
12.6 Contact ......................................................................................................................................34
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

1About this operating manual
4 / 34 GBB-BW_ADAM-17682/1 ADAM
1 About this operating manual
This manual is part of the belt weigher UNIBAND®with the mass flow transducer ADAM
HighEnd, and describes the safe and correct use in all phases of operation.
Parts or all of this manual may not be copied, disseminated or utilised for the purposes of
competition without written authorisation, or distributed to third parties.
1.1 Target group
Target group
Task
Operator
Keep this manual and the associated documents to hand
at the place of use, and also keep it for later use.
Ensure that staff read and follow this manual and the
documents that also apply, especially the safety and
warning notices.
Observe additional system-specific operating manuals,
specifications and regulations.
Expert personnel,
installer
Read, observe and follow this manual and the
documents that also apply, particularly the safety and
warning notices.
Tab. 1: Target groups and their tasks
1.2 Warning notices and symbols
Warning
symbol
Signal
word
Hazard category
Consequences if not avoided
DANGER
Immediate threat of danger
Death, serious injury
WARNING
Potential threat of danger
Death, serious injury possible
CAUTION
Potentially dangerous
situation
Minor injury possible
NOTICE
Potentially harmful situation
Material damage / environmental
damage
Tab. 2: Warning notices and consequences of not observing them
Symbol
Meaning
Directions for action
1. , 2. , …
Multi-step directions for action
Prerequisite
Tab. 3: Symbols and meaning
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

2Safety
ADAM GBB-BW_ADAM-17682/1 5 / 34
2 Safety
2.1 Intended use
Only use the belt weigher and mass flow transducer for the weighing of belt-conveyed
products
2.2 General safety notices
Product safety2.2.1
This product is manufactured in accordance with recognized technical safety regulations.
Nevertheless, dangers to the life and safety of the user or third parties, or possible damage to
the product and other property can arise during use.
Only use the product in a technically flawless condition as well as in accordance with its
intended use, with a mind to safety and possible hazards, and in accordance with this
manual.
Installation only as specified in the assembly information.
Connection of all products with the correct supply voltage.
Read this manual completely before use and keep this manual and all other relevant
documents complete, completely legible and accessible to personnel at all times.
Prohibit all ways of working that pose a risk to personnel or third parties.
In addition, also observe the statutory and local safety and accident prevention
regulations, as well as the standards and directives that apply in the respective operating
country.
The operators' obligations2.2.2
Safety-conscious working
Ensure the observance and monitoring:
–intended use
–statutory and local safety and accident prevention regulations
–safety regulations for handling hazardous goods
–standards and directives that apply in the respective operating country
Provide sufficient personal safety equipment.
Personnel qualifications
Ensure that before starting work, personnel tasked with working on the electronics have
read and understood this manual and the documents that also apply, particularly the
safety, maintenance and repair information.
Define personnel responsibilities and monitoring.
Have all work during all operating phases only performed by technical expert personnel.
The obligations of personnel2.2.3
If necessary, use personal safety equipment:
–Safety footwear
–Protective helmet
–Hearing protectors
–Protective gloves
–Protective goggles
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

3Design and function
6 / 34 GBB-BW_ADAM-17682/1 ADAM
3 Design and function
3.1 Design
Mass flow transducer design3.1.1
The mass flow transducer is available in a stainless steel housing, and for switching panel
mounting.
Fig. 1: Mass flow transducer design as a stainless-steel housing
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

3Design and function
ADAM GBB-BW_ADAM-17682/1 7 / 34
Fig. 2: Mass flow transducer design for the switching panel installation
Belt weigher design3.1.2
Fig. 3: Belt weigher design
1 Protective plate
2 Load cell
3 Transportation locking screw with lock
nut, top
4 Transportation locking screw with lock
nut, bottom
5 Steel wire
6 Roller chair
7 Weighing unit
8 Weighing frame with tag plate
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

3Design and function
8 / 34 GBB-BW_ADAM-17682/1 ADAM
3.2 Function
Mass flow transducer3.2.1
Mass flow transducer for the precise processing of measured data from belt weighers,
packaging scales, checkweighers and dosing systems.
Belt weigher3.2.2
Belt weigher for measuring the conveying capacity of belt conveyed goods
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

4Marking
ADAM GBB-BW_ADAM-17682/1 9 / 34
4 Marking
4.1 Mass flow transducer marking
Tag plate4.1.1
The tag plate is located on the cover of the mass flow transducer (see Chapter 3.1.1,
p. 6).
Fig. 4: Tag plate
4.2 Belt weigher marking
Tag plate4.2.1
The tag plate is located on the cover of the weighing frame (see Chapter 3.1.1, p. 6).
Fig. 5: Tag plate
Warning sticker nominal load4.2.2
The tag plate is located on the protective plate of the weighing frame (see Chapter 3.1.1,
p. 6).
Fig. 6: Warning sticker nominal load
1 Product name
2 Nominal load
3 Overload notice
4 Manufacturer
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

4Marking
10 / 34 GBB-BW_ADAM-17682/1 ADAM
Warning sticker weighing area4.2.3
The warning sticker is glued to the weighing frame after installation (see Chapter 3.1.1, p. 6).
Fig. 7: Warning sticker weighing area
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

5Transport and storage
ADAM GBB-BW_ADAM-17682/1 11 / 34
5 Transport and storage
5.1 Transporting
CAUTION! Material damage due to incorrect transport!
5.2 Unpacking and checking the condition on delivery
1. Carefully unpack the product on receipt and inspect it for transport damage.
2. Report any transport damage to the carrier immediately.
Lifting5.2.1
Avoid vibrations when lifting the mass flow transducer.
Properly lift and transport the belt weigher.
DANGER! Death or crushed limbs caused by goods falling while being transported!
Select the correct lifting gear for the weight being transported.
Do not stand under suspended loads.
Secure the transport route.
CAUTION!Damage to the load cell through incorrect transport!
Transport the belt weigher as vibration-free as possible.
Set down the belt weigher as gently as possible.
5.3 Storage
CAUTION! Material damage due to incorrect storage!
Store the belt weigher and mass flow transducer in the original packaging.
Ensure that the storage room fulfils the following conditions:
–dry
–frost-free
–vibration-free
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

6Installation
12 / 34 GBB-BW_ADAM-17682/1 ADAM
6 Installation
DANGER! Risk of injury when the system is running or starting!
When the system is running or starting, limbs can be crushed or torn off.
6.1 Checking the ambient conditions
The system is shut down
The system is secured against unintentional re-activation.
Before the deflection or drive roller of the conveyor belt, at least
2 roller chairs present
Belt weigher is not mounted in the direct transfer area of the conveyed material
Belt weigher is not mounted in the bend area of the conveyor belt
Belt weigher is not mounted under a magnetic separator
6.2 Mounting the belt weigher
CAUTION! Welding currents may damage the load cell!
Carry out welding work with extreme caution.
Ensure that no welding current can flow across the load cell.
NOTE! Strong vibrations can affect the measurement readings!
Provide an adequate mechanical support structure.
If necessary, secure the mounting additionally.
NOTE! Roller chairs that are not exactly aligned can influence the measured values!
Align the belt weigher with the roller chair exactly with the other roller chairs.
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

6Installation
ADAM GBB-BW_ADAM-17682/1 13 / 34
Fig. 8: Mounting the belt weigher
1 Roller chair
2 Shortened roller chair
3 Running direction
Installation steps
1. Dismantle the present roller chair (1) (s. Fig. 8, p. 13).
2. Shorten the roller chair on the side (2) (s. Fig. 8, p. 13)and attach it to the belt weigher.
3. Place the belt weigher centrally between the adjacent roller chairs, taking into account the
running direction (3) (see Fig. 8, p.13) of the belt weigher.
4. Align the belt weigher, for example, check the alignment by tensioning a cord.
5. Fasten the belt weigher with the included clamps.
6. Warning sticker: Attach the rated load visibly in the area of the belt weigher (s. Fig. 6, p. 9)
6.3 Remove the transport protection
To prevent damage to the load cell, the load cell is mechanically equipped with a transport
lock and an overload stop.
Secure the load cell by means of the transport securing device during each transport and
mechanical work on the conveyor belt.
Fig. 9: Remove the transport protection
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

6Installation
14 / 34 GBB-BW_ADAM-17682/1 ADAM
1. Dismantle the lower transport protection screw (2) (s. Fig. 9, p. 13)and store it for a later
transport.
2. Dismantle the upper transport protection screw (1) (s. Fig. 9, p. 13)and store it for a later
transport.
6.4 Connect the mass flow transducer
Shielded connection cable between ADAM and measuring cell
Shielded connection cable for power output 0(4) - 20 mA
Shielded connection cable for interface output RS-232/422
Shielded connection cable for relay contacts
Shielding of the connection and connecting cables is connected to the protective ground
conductor on the terminal strip of the mass flow transducer.
Proper low-ohmic protective conductor connection is present
Lines in the clamping area should be routed without crossings as far as possible
Connect the mass flow transducer according to wiring diagrams (see chapter 12, p. 26)
Install the mass flow transducer vibration-free.
6.5 Connect the speed adjustment wheel (optional)
Fig. 10: Connect the speed adjustment wheel (optional)
1 Weighing frame
2 Bracket clip
3 Nut and washer
4 Speed measuring wheel
1. Mount the speed measuring wheel (4) with bracket clip (2) on the weighing frame (1),
(see Fig. 10, p 24).
2. Connect the speed measuring wheel (4) according to wiring diagrams (see chapter 12.2,
p. 28)
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

7Start-up of the mass flow transducer
ADAM GBB-BW_ADAM-17682/1 15 / 34
7 Start-up of the mass flow transducer
7.1 Checking the ambient conditions
Ambient voltage applied.
Program interface is displayed.
7.2 First application
Menu System Setup Indicator
Setup. Weigher
1. Select increment
2. Enter decimal point
3. Enter maximum load
4. Enter unit
Tab. 4: First application
7.3 Set end of measuring range and unit
The end of the measuring range is dependent on the capacity of the measuring mechanics
and should
be based on the maximum flow rate. A change of the measuring range limit affects the signal
stroke and the amplification.
Menu System Setup Indicator
Setup. Weigher
Tab. 5: First application
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

7Start-up of the mass flow transducer
16 / 34 GBB-BW_ADAM-17682/1 ADAM
7.4 Perform measuring alignment
1. Menu System Setup
Indicator Setup. Calibration
Choose
2. Select two-point
3. First adjust the zero point:
empty scale and confirm with
"Enter"
4. 2. Determine the calibration
point with fixed weight: Enter
fixed weight, lay it on the scale,
confirm with "Enter"
Tab. 6: measuring alignment
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

8Start up mass flow transducer with π-Mach software
ADAM GBB-BW_ADAM-17682/1 17 / 34
8 Start up mass flow transducer with π-Mach software
8.1 Connection to the Internet
1. Plug the cable (Ethernet, USB) into mass flow transducer and computer
2. Open π Mach ll software
3. In the task bar, go to environment communication
Fig. 11: Connection to the Internet: Environment
4. For Ethernet, enter the IP number, which is
listed on the device under interfaces /
Ethernet
For USB press on discover so that the USB
input can be found.
8.2 Quick Setup
1. Indicator parameters: Unit, decimal point, increment, maximum weight point-specific)
2. Indicator setup: Request
3. Calibration: The scale must be empty,
then click on “Calibrate scale empty”, and
place a fixed weight on scale, e.g. 5 kg.
Enter this weight below in the field "Enter
load on scale" and confirm with
"Calibrate load on scale".
4. Communication: Settings and logs for the
individual interfaces (Ethernet, RS232,
RS422, CAN)
5. Done: Confirmation of the Quick Setup
settings.
Fig. 12: Connection to the Internet:
Communication
Fig. 13: Quick Setup
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

8Start up mass flow transducer with π-Mach software
18 / 34 GBB-BW_ADAM-17682/1 ADAM
8.3 Full Setup
For more settings, click on “Enable Full Setup”, a new menu will
open. There you can choose between:
- Live (current display via indicator, inputs, outputs, counter)
- System (system information)
- System Setup (settings regarding service, communication,
counter, passwords, screen, time / date, printers,
configurations and reset)
- Recipe (select, edit (batch, minimum/maximum volume,
target value (flow))
- Control (reset of tare, zero point batch etc.)
- Access (program, alibi, event log)
8.4 Speed adjustment wheel (optional)
1. Enable Full Setup System Setup Configuration
2. Set pulse/m:
a. 200mm- speed adjustment wheel = 32.00 pulse/m
b. 125mm- speed adjustment wheel = 38.00 pulse/m
3. Set filter time
4. Assume settings with "Discover"
Fig. 14 Full Setup
Fig. 15 Set the speed adjustment
wheel
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

9Mass flow transducer software
ADAM GBB-BW_ADAM-17682/1 19 / 34
9 Mass flow transducer software
9.1 Program interface
Fig. 16: Program interface
No.
Function
Meaning
1
Recipe
Currently selected recipe
2
Flow
Measured flow
3
Scale in idle
Scale is in the idle state
4
Inputs
Displays current inputs
5
Counter
Display of measured values (kg, kg/h)
6
Weight
Measured weight on the belt
7
Speed
Current belt speed
8
Display status
Current status messages
8
Menu level
Menu area
9
Active buttons
Displays which buttons / inputs are currently
possible
10
TAC
Traceable access code for indicator
Settings
11
CAL
Calibration code for calibration settings
12
Recipe
Currently selected recipe
Tab. 7: Program functions
1
2
3
4
5
6
7
8
9
10
11
12
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]

9Mass flow transducer software
20 / 34 GBB-BW_ADAM-17682/1 ADAM
Tab. 8: Buttons
Term
Declaration
CAL
“Calibration code" shows how many times the adjustment has been
changed.
TAC
"Traceable access code" shows how often the
indicator settings have been changed.
Points
Shows how many calibration points are used. (more than 2
points possible for non-linear measuring results)
Value
Shows the raw measurements of the analogue - digital converter.
Weight
Shows the real weight.
Weight x10
Shows the real weight with an extra decimal place, so that the scale is 10-
fold more accurate than in the normal range.
Tab. 9: Explanation of terms in the menu
Push button
Declaration
T starts the dynamic zero measurement. During this
measurement the average weight of the empty belt is determined
Input: Confirmation of inputs; press and hold key longer than 2s press to
reach the main menu
Zero: Resetting the weight to zero
Back: Exit menu item
Resetting the batch weight to zero
Arrow keys to position the cursor
Arrow keys to position the cursor
Arrow keys to position the cursor
ООО «ТИ-СИСТЕМС» ИНЖИНИРИНГ ИПОСТАВКА ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ
Интернет: www.tisys.ru www.tisys.kz www.tisys.by www.tesec.ru www.ти-системс.рф
Телефоны: +7 (495) 7774788, 7489626, (925) 5007155, 54, 65
Эл. почта: [email protected] [email protected] [email protected]
Table of contents