
K&A Manufacturing • 800.298.4351 • www.raproducts.com/install 1 of 2
R-Style Optional Series 4 HV Monitor Lift
Wire Management Channel Installation
Warranty: raproducts.com/warranty #53493
D. M5 x 18mm (7/8”) Sq/Ph/Washer Head Wood Screw x4
E. 5mm Slim Fix Bolt x8
Tools Required for Assembly
A. Power Driver with Adjustable Torque
B. #2 Phillips Head Driver Bit
C. #2 Square Head Drive Bit (Recommended)
A B C
Hardware Included for Assembly (may have extra)
D E
F. HV Series 4 Kick Panel 36 x1
G. 26” Wire Management Channel - HV Series x1
Parts
F
Installation
• Lay the kick panel on a protected surface with the
slim x bolts and pilot holes facing up.
• Align the holes in the wire management channel(s)
with the pilot holes in the kick panel.
• Attach the channel(s) with four wood screws in each
channel. Do not over-tighten the screws. Use a
low torque setting on the driver.
• Continue the assembly of the workstation using the
instructions that came with it.
D
E
F
G