manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Ruud
  6. •
  7. Floodlight
  8. •
  9. Ruud CI285X01 User manual

Ruud CI285X01 User manual

Document CI285X01R2 Date 3/1/06
Drawing/Page CPG DCR # 06-015
INSTALLATION INSTRUCTIONS
FIXED ARM MOUNT FLOODLIGHT
Hinge
Lever
Stabilizer
Bar
5"
(127 mm)
14"
(356 mm)
12.5"
(318 mm)
8"
(203 mm)
8"
(203 mm)
6"
(152 mm)
7.6" (193 mm)
8.8" (224 mm)
6.4" (163 mm)
3.8"
(97 mm)
2.7"
(69 mm)
3.1"
(79 mm)
5.9"
(150 mm)
180°Tilt Range
NOTES
1. This carton contains the following hardware: (1) Backing Plate
with preassembled 5/16-18 x 1.25 bolt, (2) 5/16"-18 hex nuts,
(1) 5/16" sealing washer, (1) plastic retaining washer and (1)
5/16" lock washer.
2. All wire connectors within the fixture must be rated for 150°C
minimum.
3. Strain relief is required for electrical connections at heights of
25' (7.6m) and above. Knot the supply wires from the pole with
the fixture cord inside the pole.
4. This fixture comes with the ballast module packaged separately.
Verify the ballast module matches the fixture provided prior to
installation.
5. Install per NEC or local electrical codes.
6. 5/16" hex nuts must be torqued to 132 in. lbs. (15 N•m).
1. To avoid the possibility of electrical shock, turn off power
supply before installation or servicing.
2. In continuously operating Metal Halide systems (24 hours/day, 7
days/week), turn lamps off once per week for at least 15 minutes.
Failure to comply increases the risk of violent lamp failure.
CAUTIONS
FIGURE 2
FIGURE 3
REMOVAL
1. Locate two latches at front of lens (Figure 1). Lift latches outward,
then rotate 1/4 turn. Gently allow door frame to swing to its fully
open position.
2. Remove door frame from hinge assembly by depressing hinge lever
and removing the frame from the hinge stabilizer bar (Figure 2).
INSTALLATION
1. While holding the hinge stabilizer bar steady, slide the hinge assem-
bly over the hinge stabilizer bar, allowing it to snap into place
(Figure 2). Gently tug on lens to verify the door frame is secure.
2. Move door frame to its closed position, push latches inward at
their 1/4 turn position and rotate 1/4 turn. Move latches into their
recessed position (Figure 1).
DOOR FRAME REMOVAL AND INSTALLATION
1. Use dimensions on template shown on reverse side of sheet for
pole drilling if pole is not pre-drilled (Figure 5).
(Note: Template is not to scale.)
2. Remove door frame from fixture and set aside to prevent damage
– See Door Frame Removal section for details.
3. Insert Backing Plate with pre-assembled bolt into the top of pole
and through the lower mounting hole (Figure 3). Install plastic
retaining washer on outside of pole to hold plate in place.
4. Feed cord through center (0.500") hole in pole and through center
hole in plate.
5. Place the fixture’s pre-assembled bolt through the top pre-drilled
hole of pole and through the top hole in plate. Push fixture flush
with pole.
6. Install 5/16" lock washer and nut onto bolt inside pole as shown
(Figure 3). Tighten nut firmly.
7. Install 5/16" sealing washer and nut onto bolt inside housing as
shown (Figure 3). Tighten nut firmly.
8. Torque 5/16" hex nuts to 132 in. lbs. (15 N•m).
9. Make wire connections inside pole and install pole cap.
MOUNTING
Hex Nut
* Torque 5/16" hex nuts to 132 in. lbs. (15 N•m)
Sealing
Washer
Backing Plate &
Bolt Assembly
Hex Nut
Lock Washer
Bolt Retained
in Housing
Retaining Washer
FIGURE 1
Document CI285X01R2 Date 3/1/06
Drawing/Page CPG DCR # 06-015
INSTALLATION INSTRUCTIONS
FIXED ARM MOUNT FLOODLIGHT
The ballast module is normally equipped with a multi-tap ballast and is
factory set to the highest voltage. If another voltage is desired:
BALLAST WITH LEADS
1. Disconnect highest voltage lead and recap with same wire
connector.
2. Strip appropriate lead and connect to incoming hot lead using
supplied 150°C wire connector attached to leads.
SINGLE VOLTAGE TAP
1. Make sure the voltage furnished to the fixture is the same as
specified on the ballast module.
1. Verify the voltage furnished to the fixture matches the voltage the
ballast module is tapped at. Refer to SET BALLAST VOLTAGE
section if the voltage is different.
2. With the door frame open or removed; hook the ballast tray on the
hinge rod located on the left side of the housing.
3. Swing the ballast tray up into the housing and lock in place by
placing the ballast tray pin in the notch at the end of the ballast
tray. Note: For HPS PR optics with hole near ballast, place the
tab on the ballast tray insulation so that it covers the hole in the
reflector. Reference Figure 4. Tighten the ballast tray in position by
turning the ballast tray knob clockwise until secure.
4. Connect male Mate & Lock connector from the ballast module to
the female Mate & Lock connector from the Lamp. Connect female
Mate & Lock connector from the ballast module to the male Mate
& Lock connector from the incoming power. Note: Once connec-
tors are fastened, tuck lead wires up through the ballast tray,
keeping them away from the reflector. Note: If Quartz option is
ordered a third pair of Mate & Lock connectors will be present
and will be labeled “Quartz”.
5. Install lamp and replace door frame.
BALLAST MODULE INSTALLATION
SET BALLAST VOLTAGE
FIGURE 4
Tab on ballast tray insulation should
cover hole in reflector if present
(hole only in some HPS PR optics)
C
L
2.000"
(51 mm)
1"
(25 mm)
ø0.344" (9 mm) hole
2 Required
ø0.500" (13 mm) hole
NOT TO SCALE
2.000"
(51 mm)
FIGURE 5

Popular Floodlight manuals by other brands

Halo TGS3S401MSRB instruction manual

Halo

Halo TGS3S401MSRB instruction manual

Leviton 1-0085 manual 

Leviton

Leviton 1-0085 manual 

Behringer EUROLIGHT MH710 quick start guide

Behringer

Behringer EUROLIGHT MH710 quick start guide

intelektron BC9000R installation guide

intelektron

intelektron BC9000R installation guide

DOTLUX 4871-050010 user manual

DOTLUX

DOTLUX 4871-050010 user manual

DTS SCENA LED 80 PC FC user manual

DTS

DTS SCENA LED 80 PC FC user manual

Meyer Fluxa BA Mounting instructions

Meyer

Meyer Fluxa BA Mounting instructions

Rebel Light URZ0037-2 quick start guide

Rebel Light

Rebel Light URZ0037-2 quick start guide

Utilitech Pro SE1019-WH3-02LF0-U manual

Utilitech Pro

Utilitech Pro SE1019-WH3-02LF0-U manual

Raytec Spartan Series installation guide

Raytec

Raytec Spartan Series installation guide

GE Current Evolve GEH-6033 installation guide

GE

GE Current Evolve GEH-6033 installation guide

Techni-Lux UltraLED Series DL-BAR10TC24 user manual

Techni-Lux

Techni-Lux UltraLED Series DL-BAR10TC24 user manual

Philips HADCO WAMT14 installation instructions

Philips

Philips HADCO WAMT14 installation instructions

Sealey LED192T instructions

Sealey

Sealey LED192T instructions

PR Lighting XR 1000 BEAM PR-2723 user manual

PR Lighting

PR Lighting XR 1000 BEAM PR-2723 user manual

DHR 230RCB Series Technical document

DHR

DHR 230RCB Series Technical document

Probrite STELLAR FSXD30-MS-4K-BZ INSTALLATION, USAGE, & CARE GUIDE

Probrite

Probrite STELLAR FSXD30-MS-4K-BZ INSTALLATION, USAGE, & CARE GUIDE

Eaton Halo Home MST20C quick start guide

Eaton

Eaton Halo Home MST20C quick start guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.