SaunaFin Luna Cedar User manual

Luna Cedar Sauna
Assembly Instructions
Requirements:
* 2 People recommended)
* Step or Extension Ladder
* Cordless Drill we supply the bit)
* Tape Measure
* Staple Gun
* Utility Knife

Make sure you have a solid, level Foundation.
Wood Deck, Patio Stones, Concrete Pad etc.)
Lay the center stave across the supports.
The center stave will be rounded on both sides)
Center Stave should stick out 7” past front
support.
There should be 40” from end of support to the
middle of center stave.
Once in correct position, secure center stave to
front support using 2 ½” screws.
repeat on back support)
Luna Cedar Sauna
Assembly Instructions
Lay out the 3 Bottom Supports like in Picture.

Use a tape measure to center the middle support
and secure center Stave to it with 2 ½” screws
Start Laying out bottom staves as shown.
When finished laying out bottom staves, line
them up flush with each other.
Use a tape measure to make sure they are all
7” from Support
Once in proper position, secure bottom staves
to front support using 2 ½” screws.
Now start laying out the back wall
Luna Cedar Sauna
Assembly Instructions

To make the next steps easier, line up the back
wall staves as best you can.
Unpackage threaded rods.
Thread the rods through the holes.
(This ill take some finessing)
Make sure the holes in the back wall staves line
up with each other.
Secure both ends tightly with a washer and nut
for each hole.
Cut off any excess threaded rod with a
hacksaw.
Luna Cedar Sauna
Assembly Instructions

Use vice grips to safely snap off the cut piece of
threaded rod
With help, Lift the back wall and insert into
groove of bottom staves.
Make sure both sides are sticking out equally to
ensure wall is centered.
Gather all the front wall pieces and lay out like
above.
Slide threaded rod through side stave as you
continue to add the small top pieces.
You should have 5 small staves between the
corner and middle stave.
Luna Cedar Sauna
Assembly Instructions

Using a helper, slide window into place. After adding 5 more small staves at the top,
slide door in same manner as window.
Repeat the same process for the other side
window.
Make the nut and washer flush on 1 side
Tighten other side and cut off excess with
hacksaw.
With 2 people, slide front wall into bottom
staves in same manner as back wall.
Luna Cedar Sauna
Assembly Instructions

Use a mallet and tape measure to ensure front
wall is centered.
Gather side staves and place on either side of
the sauna.
Use any stave to brace the front and back walls. Start inserting the wall staves on both sides,
starting from the bottom.
Follow the curvature of the walls. Use the rubber mallet to help position the
staves and then secure with a 2 ½” screw.
Luna Cedar Sauna
Assembly Instructions

Continue to attach staves using a 2 ½” screw on
each end of stave,
Before both walls are finished, bring in all
benches and brackets for easier installation.
Assemble benches as best you can without
securing them.
Continue adding staves in same manner as
before.
Once you reach the middle, install the center
stave without screwing it in.
The center stave with be concaved on both
sides.
Luna Cedar Sauna
Assembly Instructions

Continue to attach staves using a 2 ½” screw on
each end of stave,
Before screwing in top corners, bang staves
snugly in place.
After staves are snug, screw in middle stave then
the outside ones.
Continue adding staves using only the mallet, no
screws at this time.
When you reach the middle, use the mallet to
finesse the last pieces in.
Once all the staves are in, secure each stave
with a 2 ½” screw at each end.

With two people, drape rubber membrane over
sauna as shown.
Using the staple gun, secure the rubber
membrane to the front of sauna as shown.
On the back, secure it as shown with the roofing
membrane draping down.
Using a utility knife, cut off the excess rubber
membrane.
Secure both sides with more staples. Install the sauna trim starting at the front of
the sauna.

To prevent the trim pieces from splitting, pre drill
the pieces first
Secure trim with 2” screws.
To install the siding, start at the bottom with the
top of the siding flush with the bottom wall
stave.
Start the next piece of siding 4” from the bottom
of the previous piece.
Using small nails or staples, secure each shingle
at the bottom so that it catches the top of the
shingle underneath.
Continue process for both sides.

When you reach the rubber membrane, secure a
shingle underneath.
This protects the sauna from getting water
between the siding and the staves.
Now secure a shingle over the membrane as
shown.
Cut off the excess at the bottom with a utility
knife as shown.
Continue add the siding until you reach the top. Attach the trim on the back of sauna in same
manner as the front.

To install the inside benches, line up brackets to
bench supports on top & bottom benches.
Secure the bench brackets to the wall and the
bench supports using 2 ½” screws.
Secure the bench brackets to the bottom bench
covers as shown using 2 ½” screws.
Screw bench brackets to floor using 2 ½” screws.
Screw in between slats to secure the upper
bench cover using 2 ½” screws.
Repeat process to secure bottom bench to
bench support.

Place small bench bracket and large brackets as
shown. Secure to floor and wall with 2 ½”
screws.
Secure Window side bracket to back wall and
floor in same manner as other brackets.
Fasten Bench brackets to top short bench from
underneath using 2 ½” screws.
Secure bottom short bench in same manner.
Screw in between slats to secure the upper
short bench cover using 2 ½” screws.
Repeat process to secure lower bench cover to
bench support.
Assembly Instructions
For 8’x7’ and 8’x8’ models with L shaped Benches)
(If no L shaped bench, please proceed to next page.)

Position back support at desired height, Secure I
between slats using 2 ½” screws.
Secure the door to the frame 6” from the top
and bottom of door using 2 ½” screws.
Repeat on other side through middle holes on
top and bottom hinges.
To install outside handle, pre place 2” screws as
shown.
Measure to ensure handle is centered both
ways and screw to door.
Repeat process with inside towel bar handle.

manufacturing process before using.
Place heater on top of the included box of
rocks to get correct height for installation.
Mark the placement of the heater brackets.
Attach heater brackets to the back wall of sauna
using 1 ½” screws.
Place Heater on wall brackets.
Remove the protective film from the heater
before use.
* Wash the rocks thoroughly before placing them into
the heater
Space rocks out evenly in top of heater.
*Operate the heater for an hour with the sauna door
fully open to burn off any residual coating from the

Stand the 2 sides of the heater guard on
edge with predilled holes on the bottom.
Screw front guard support to either side using
2 1/2” screws. 2 screws per side)
Assemble remaining front support to the 2
ends in the same manner as the previous step.
Place heater guard around electric heater.
*Make sure heater guard is level before securing.
Using 2 1/2” screws in pre drilled holes,
fasten guard to back wall.
Place towel hanger in desired location and
secure with 2 ½” screws.
Repeat process with thermometer using a 2”
screw

Congratulations on the assembly of your new Luna Cedar Sauna!

HOW TO TA E A SAUNA
1. Pre-heat your sauna to the desired temperature usually between 80-100°C)
2. While it’s warming up, take a nice hot shower.
3. Enter the pre-heated sauna, relax and allow your body to perspire in the soft dry heat. Do not throw water
on the rocks during the first part of the session.
4. Cool off with a cold shower or a quick swim in a lake or pool.
5. Re-enter the sauna and sprinkle water on the rocks. This will increase humidity to about 30% to assist in
perspiration.
Half a cup every 5 minutes should be enough. Too much water will just cool off the rocks and you’ll get less
steam.
6. After a 20-30 minute sauna, cool off in the shower or lake or pool.
7. Repeat this sauna/cold shower process as often as desired.
8. It is important to drink during your sauna session and even a light snack.
9. Like bathing in a hot tub, excessive exposure can be harmful to a person’s health. People with poor health
should consult their physicians before using the sauna.
THESE ARE GUIDELINES ONLY. ENJOY YOUR SAUNA WHATEVER WAY YOU DESIRE.
CHILDREN MUST BE SUPERVISED BY ADULTS.
MAINTAINING YOUR SAUNA AFTER INSTALLATION
1. Wash the layer of rock dust off of the sauna rocks before using them.
2. When your sauna is set up and working you should “break-in” the sauna before using it for the first time.
Turn it on its highest setting and keep it like that for about 1 hour. This is recommended to burn off any oils and
impurities from manufacturing, and it also “cures” the woodwork. After about ¾ hour, slowly pour about one
litre of cold water on the rocks. It should all turn to steam and not come out of the bottom of the heater. If it
does, you’re pouring too fast.
3. It is considered good sauna etiquette that guests take a shower with soap and sit on a double-layer of
terrycloth towels to prevent perspiration from getting onto the benches and walls where the oils will
accumulate over time.
After each use, leave the door fully open for the wood to dry out. Duck boards can be lifted up to air out if
necessary.
4. Under normal conditions, a slight wash of the floor and benches several times a year will maintain its
cleanliness.
The cedar benches can be washed with a mild solution of liquid cleaner and water to remove any buildup and
perspiration stains from the wood. Never use ammonia or harsh cleaners as they can turn the wood gray.
5. Good care should be taken of the wooden bucket and ladle. They should be stored upside down to promote
drying.
6. The peridotite sauna rocks may need to be replaced in 6 to 10 years depending on severity and frequency of
use. In many cases, the rocks could last up to 15 years.
7. Do NOT use commercial wood sealers from local lumberyards or hardware stores. These are not designed to
withstand the sauna temperatures or humidity!
Table of contents
Other SaunaFin Plumbing Product manuals
Popular Plumbing Product manuals by other brands

Mira
Mira Advance ATL J97A installation guide

ESS
ESS Easy Drain Multi TAF EDMTAF2000 Installation advice

Hans Grohe
Hans Grohe Vernis 04955 0 Series Installation/User Instructions/Warranty

Speakman
Speakman SA-1002 instructions

Blanco
Blanco SILGRANIT quick start guide

KWC
KWC QBIX/QBIX-ART 11.253.033.006 specification

THE BOLD LOOK OF KOHLER
THE BOLD LOOK OF KOHLER K-19480 Homeowner's guide

Graff
Graff C14B-WS Series installation instructions

Tres
Tres STUDY 26285301AC manual

Helvex
Helvex LIQUIDA UTV-302 Instruction guide

Hans Grohe
Hans Grohe Allegro E 04076 1 Series Installation/User Instructions/Warranty

Elkay
Elkay Mystic MYSTIC2920 Specifications