
4. ASSEMBLY
Refer to g.1.
4.1. Insert bottom frame (5) into bottom frame (2). secure with locking bolt (4).
4.2. Bolt upright posts (1) to either end of bottom frame assembly (5 & 2) using bolt (9), washer (7) and nut (6).
4.3. Insert expansion posts (11 & 12) into upright posts (1), secure with pins (10) and R clips.
4.4. Insert rotary frame 1 (23) into expansion post (11). Secure rst with circlip (25) and then bolt (13) washer (14) and nut (15).
4.5. Insert rotary frame 2 (24) into expansion post (12). Secure rst with circlip (25) and then bolt (13) washer (14) and nut (15).
4.6. Use ratchet (16) and locking bolt (4) on top of expansion post 2 (12) to adjust angle of rotary frames (24 & 25).
4.7. Fit wheels (8) using washer (7) and nut (6).
4.8. Slide supporting frames (21 & 22) onto rotary frames 1 & 2 (23 & 24), secure with bolts (20).
4.9. Secure all fasteners.
5. OPERATION
Refer to gs. 2 & 3.
5.1. Use original engine mounting bolts or studding, washers
and nuts of appropriate size to secure the engine to the stand
using supporting frames (21 & 22).
Y
NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specications and component parts without prior notice.
IMPORTANT: No liability is accepted for incorrect use of this product.
WARRANTY: Guarantee is 12 months from purchase date, proof of which will be required for any claim.
Sole UK Distributor, Sealey Group.
Kempson Way, Suffolk Business Park,
Bury St. Edmunds, Suffolk.
IP32 7AR
www.sealey.co.uk
sales@sealey.co.uk
01284 757500
01284 703534
Web
Parts support is available for this product. To obtain a parts listing and/or diagram,
please log on to www.sealey.co.uk, email sales@sealey.co.uk or telephone 01284 757500.
Environmental Protection
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted,
taken to a recycling centre and disposed of in a manner which is compatible with the environment.
When the product becomes completely unserviceable and requires disposal, drain off any fluids (if applicable)
into approved containers and dispose of the product and the fluids according to local regulations.
Fig.2
Fig.3
MES02| Issue 1 15/03/16
Original Language Version
© Jack Sealey Limited
Fig.1