5
Attach the furler to the front chaiplate.
Connect side stays to nishe the dodger assembly.
Attach the front stay and prepare jib hallyard.
Prepare the mainsheet.
Prepare the spi hallyard.
Use dyneema to secure the elastic rope of a dodger.
1
4
6
2
5
3